Talisker Intersects 52.2 g/t Au over 0.55 metres, within 19.15 g/t over 1.60 metres, from the 2025 Bralorne Gold Project Resource Conversion Program TORONTO, Feb. 09, 2026 (GLOBE NEWSWIRE) -- Talisker Resources Ltd. (“Talisker” or the “Company”) (TSX:TSK | OTCQB:TSKFF) is pleased to announce results from the final 30 drill holes from late 2025, predominantly targeting dip and strike extensions in the major ore veins at its currently producing Mustang Mine. Highlights from the final 30 drill holes include: SB-2025-001 - 30.50 g/t Au over 0.50 m within 10.21 g/t Au over 1.75 m on the 101 VeinSB-2025-001 - 20.70 g/t Au over 0.70 m within 8.75 g/t Au over 1.70 m on the 55 HW VeinSB-2025-002 - 32.70 g/t Au over 0.65 m within 12.18 g/t Au over 1.75 m on the 101 VeinSB-2025-002 - 24.40 g/t Au over 0.65 m within 9.41 g/t Au over 2.00 m on the 55 HW VeinSB-2025-002 - 30.00 g/t Au over 0.60 m within 11.31 g/t Au over 1.85 m on the 55 VeinSB-2025-003 - 12.90 g/t Au over 1.07 m within 6.78 g/t Au over 2.15 m on the 55 HW VeinSB-2025-009 - 19.40 g/t Au over 0.50 m within 6.53 g/t Au over 2.10 m on the 55 HW VeinSB-2025-010 - 33.60 g/t Au over 0.55 m within 15.76 g/t Au over 1.65 m on the 278 VeinSB-2025-010 - 8.60 g/t Au over 0.60 m within 5.09 g/t Au over 1.65 m on the 55 HW VeinSB-2025-011 - 9.78 g/t Au over 0.75 m within 5.40 g/t Au over 1.85 m on the 55 HW VeinSB-2025-012 - 25.50 g/t Au over 0.65 m within 6.56 g/t Au over 2.55 m on the 55 HW VeinSB-2025-013 - 36.20 g/t Au over 0.55 m within 10.61 g/t Au over 2.35 m on the 55 HW VeinSB-2025-014 - 13.90 g/t Au over 0.75 m within 6.38 g/t Au over 2.15 m on the 55 HW VeinUB-2025-022 - 52.20 g/t Au over 0.55 m within 19.15 g/t Au over 1.60 m on the BK VeinUB-2025-023 - 13.10 g/t Au over 0.77 m within 8.49 g/t Au over 1.80 m on the Alhambra VeinUB-2025-025 - 15.60 g/t Au over 0.50 m within 12.91 g/t Au over 2.15 m on the BK VeinUB-2025-030 - 14.00 g/t Au over 0.54 m within 5.98 g/t Au over 1.55 m on the Alhambra VeinUB-2025-030 - 13.80 g/t Au over 0.50 m within 5.75 g/t Au over 1.50 m on the BK VeinUB-2025-034 - 26.90 g/t Au over 0.55 m within 10.26 g/t Au over 1.85 m on the Alhambra VeinUB-2025-034 - 15.50 g/t Au over 0.65 m within 8.44 g/t Au over 1.25 m on the BK Vein In 2025, a total of 35 underground diamond drill holes for 7,515 metres were completed from three drill bays in the Mustang underground, and a total of 15 surface diamond drill holes for 5,367 metres were completed from one drill pad at Bralorne West. The underground resource conversion drill program focused on infill drilling of the Alhambra, BK and BK-9870 Veins, while the surface drilling was focused on infill drilling Bralorne West’s 101, 55 HW, 278, and 55 veins, all within the Mustang Mine. All 2025 diamond drilling assays have now been received and reported (see January 22, 2026 news release for previous 2025 drilling results). Kyle Orr, Talisker’s Vice President Exploration commented, “We’re excited to see excellent high grade and consistent infill results from the remainder of our 2025 drilling, especially the Bralorne West zone veins, as our Mustang underground development actively advances towards that area. The new underground development will give us an even more efficient location for infill drilling of this zone as well as access to the veins for near-term grade control.” All drill holes in this release are located in the Mustang Mine and hosted in diorite intrusive and/or intermediate to felsic dyke. Major vein structures intersected are orogenic quartz-carbonate veins with banded sulfide septae. Crack-seal septae host fine-grained arsenopyrite and pyrite mineralization. Alteration halos consist of strong silica – sericite ± mariposite alteration with disseminated sulfides. Bralorne Gold Project – 2025 Diamond Drilling TopIntercepts TableDrill Hole NameFrom(m)To(m)Interval (m)Au(g/t)Interpreted StructureSB-2025-001255.80256.600.800.27Vein HaloSB-2025-001256.60257.100.500.55Vein HaloSB-2025-001257.10257.700.602.27101 VeinSB-2025-001257.70258.350.651.92101 VeinSB-2025-001258.35258.850.5030.50101 VeinSB-2025-001341.00341.500.500.4955 HW VeinSB-2025-001341.50342.000.500.2955 HW VeinSB-2025-001342.00342.700.7020.7055 HW VeinSB-2025-001342.70343.200.500.24Vein HaloSB-2025-002239.75240.300.550.05Vein HaloSB-2025-002240.30240.950.6532.70101 VeinSB-2025-002240.95241.500.550.06Vein HaloSB-2025-002327.20327.900.700.11Vein HaloSB-2025-002327.90328.500.600.3655 HW VeinSB-2025-002328.50329.150.6524.4055 HW VeinSB-2025-002329.15329.900.753.6655 HW VeinSB-2025-002337.90338.400.500.60Vein HaloSB-2025-002338.40339.150.752.52Vein HaloSB-2025-002339.15339.750.6030.0055 VeinSB-2025-002339.75340.250.502.0755 VeinSB-2025-002340.25340.900.651.29Vein HaloSB-2025-002340.90341.500.601.14Vein HaloSB-2025-002341.50342.250.750.12Vein HaloSB-2025-002342.25342.950.701.20Vein HaloSB-2025-002342.95343.500.553.28Vein HaloSB-2025-002343.50344.150.651.00Vein HaloSB-2025-003311.70312.250.551.2555 HW VeinSB-2025-003312.25312.78