OreStocks

Tectonic Metals Inc. press release

Tectonic Metals Drills 9.94 g/t Au over 36.58 meters including 15.73 g/t Au over 22.86 metres with 104.23 g/t Au over 3.05 meters at Chicken Mountain, Flat Gold Project

TSXV - TSX Venture Exchange · Gold · Arsenic · Bismuth · Canada

Tectonic Metals Drills 9.94 g/t Au over 36.58 meters including 15.73 g/t Au over 22.86 metres with 104.23 g/t Au over 3.05 meters at Chicken Mountain, Flat Gold Project

364 Gram-Metre Near-Surface Drill Intercept Anchors New High-Grade Corridor

Assay Results Pending from 34 Additional Drill Holes Across Multiple Targets

VANCOUVER, BC / ACCESS Newswire / January 22, 2026 / Tectonic Metals Inc. ("Tectonic" or the "Company") (TSXV:TECT)(OTCQB:TETOF) today announced additional drill assay results from the Company's flagship 99,800-acre Flat Gold Project in Southwest Alaska. Results are highlighted by a 364 gram-metre intercept at Chicken Mountain returning 9.94 g/t Au over 36.58 m, including 15.73 g/t Au over 22.86 m, with a bonanza-grade interval of 104.23 g/t Au over 3.05 m (hole CMR25-084), see Figure 1. The hole ended in mineralization at 54.86 m, indicating strong down-dip and along-strike expansion potential.

Assay results from 42 drill holes are reported herein - 4 diamond core holes and 38 reverse circulation ("RC") holes - representing approximately 3,950 metres ("m") of drilling from the Company's 18,373 m 2025 program. Drilling targeted step-out expansion and early-stage resource delineation in the southern portion of the Chicken Mountain intrusion.

CEO Commentary

"There aren't many times in your career when you can announce a 364 gram-meter intercept and follow that with '...and by the way, the project boasts a 100% drill success across 176 drill holes,' " stated Tony Reda, President and CEO. "That combination is rare in exploration. Every single hole hit gold, which we believe is evidence of a very robust mineralizing gold system. Furthermore, the bonanza-grade intercept in drill hole CMR25-084 demonstrates that the Chicken Mountain system can generate high grades within mappable structural corridors."

"And we're only scratching the surface.... literally. The fact that 65% of our holes ended in mineralization, including a 425-metre-long drill hole, means we're drill-limited, not geology-limited. When you combine that depth extent with our demonstrated 3-kilometer strike length at Chicken Mountain, you start to see the scale potential here."

"We're systematically advancing toward a maiden mineral resource estimate while maintaining substantial blue-sky exploration upside across our 99,800-acre land package. With assays pending from 34 additional drill holes and aggressive drilling planned for 2026, our shareholders can expect continuous news flow and another exciting year ahead."

Chicken Mountain Video and Figures

Please watch a video highlighting the 2025 resource delineation drilling at Chicken Mountain: Click Here to View Video

Drill plan maps and images can be found below and by clicking here to view: Click Here to View Plan Maps and Images

Key Geological Achievements and Characteristics

364 Gram-Metre Bonanza Intercept Anchors a New Interpreted Higher-Grade Corridor, see Figure 3 and 4.

CMR25-084: 104.23 g/t Au over 3.05 m within 15.73 g/t Au over 22.86 m, all within 9.94 g/t Au over 36.58 m

Represents the highest gram-metre intercept reported to date at Chicken Mountain

Hole ended in mineralization at 54.86 m, indicating down-dip and along-strike expansion potential.

2. 100% Drill Success Rate

176 of 176 holes intersected gold mineralization (100% success)

108 of 176 holes (61.4%) ended in mineralization

Mineralization begins at or near surface along entire 3 km of strike length

3. Significant Resource Expansion Potential

Chicken Mountain, including Alpha Bowl and Adit Zones, demonstrates over 3.0 km x 1 km x 400 m of potential mineralized strike, width and depth.

Multiple higher-grade corridors identified; see below.

Mineralization remains open at to the south, north, east, west and at depth. The depth is constrained only by drill depth, not by geological boundaries.

Early resource delineation drilling demonstrates continuity and predictability of the mineralized envelope

Five drill sections on a ~200 m x ~75 m spacing executed with all drill holes collared in mineralization

Diamond drilling on the central Chicken Mountain section confirms multiple mineralized intervals and corridor to at least ~230 m vertical extent, with mineralization continuing to >300 m downhole in deeper holes (e.g., CMD25-027).

4. Multiple Interpreted Higher-Grade Corridors Emerging, see Figure 2

Southern Chicken Mountain Corridor

Anchored by CMR25-084 bonanza intercept, 15.73 g/t Au over 22.86 m including 104.23 g/t Au over 3.05 m, all within 9.94 g/t Au over 36.58 m (364 gram-metres)

Supported by:

CMR25-080:1.09 g/t Au over 25.91 m within 0.62 g/t Au over 89.92 m

CMR25-091: 1.02 g/t Au over 21.34 m within 0.55 g/t Au over 72.54 m

CRM25-100: 1.27 g/t Au over 15.24 m and 1.09 g/t Au over 9.14 m within 0.49 g/t Au over 115.82 m

F88-10: 1.01 g/t Au over 33.60 m and 1.18 g/t Au over 32.00 m

Trench: 1.09 g/t Au over 24.13 m

Current Mineralized Strike Length, Width and Depth of Corridor: 400 m strike, 220 m width, 150 m depth and open

2. Central Chicken Mountain Corridor 1

Anchored by CMD23-002 intersecting 1.22 g/t Au over 34.46 m, within 0.54 g/t Au over 170.00 m.

Supported by:

DDH97-18CM: 1.12 g/t Au over 37.79 m

DDH97-17CM: 1.09 g/t Au over 13.72 m, within 0.59 g/t Au over 71.70 m

CMD25-029: 0.83 g/t Au over 49.00 m

Trench: 1.09 g/t Au over 19.81 m

Current Mineralized Strike Length, Width and Depth of Corridor: 250 m strike, 150 m width, 150 m depth and open

3. Central Chicken Mountain Corridor 2

Anchored by CMD25-011, intersecting 1.46 g/t Au over 26.00 m within 0.69 g/t Au over 124.97 m.

Supported by:

CMD25-027: 1.07 g/t Au over 13.00 m within 0.52 g/t Au over 18.00 m

CMD25-014: 1.10 g/t Au over 34.00 m, within 0.79 g/t Au over 51.15 m

Trench:6.64 g/t Au over 27.44 m

Current Mineralized Strike Length, Width and Depth of Corridor: 200 m strike, 150 m width, 100 m depth and open

4. Northern Chicken Mountain Corridor

Anchored by DDH97-16CM bonanza intercept, 12.56 g/t Au over 24.70 m, including 211.27 g/t Au over 1.40 m (310 gram-metres)

Supported by:

F88-02:1.27 g/t Au over 39.60 m

DDH98-05CM: 1.19 g/t Au over 27.43 m

CMD23-001: 1.02 g/t Au over 37.32 m, within 0.41 g/t Au over 423.15 m

Current Mineralized Strike Length, Width and Depth of Corridor: 200 m strike, 200 m width, 250 m depth and open

5. Adit Higher-Grade Corridor

Anchored by CMR25-121, intersecting 8.84 g/t Au over 13.72 m within 4.05 g/t Au over 30.48 m

Supported by:

CMD03-025: 27.20 g/t Au over 1.53 m, within 1.05 g/t Au over 36.80 m

CMD23-008: 1.08 g/t Au over 24.39 m

F90-02: 1.16 g/t au over 9.15 m and 1.08 g/t Au over 9.14 m

Current Mineralized Strike Length, Width and Depth of Corridor: 1000 m strike, 150 m width, 200 m depth and open

6. Alpha Bowl Higher-Grade Corridor

CMR25-035: 4.00 g/t Au over 21.34 m, within 3.00 g/t Au over 41.15 m, open to the east

CMR24-026: 6.01 g/t Au including, 21.72 g/t Au over 1.52, all within 1.22 g/t Au over 65.53 m, open to the east

CMD25-015: 1.36 g/t Au over 39.00 m, including 25.16 g/t Au over 0.60 m, all within 0.85 g/t Au over 74.00 m

Key Drill Highlights Reported Today

CMR25-084 (Bonanza grade intercept)

104.23 g/t Au over 3.05 m, within

15.73 g/t Au over 22.86 m, all within

9.94 g/t Au over 36.58 m

RC drill ending in mineralization; total hole length 54.86 m

CMD25-027

4.79 g/t Au over 5.00 m, within

1.77 g/t Au over 16.00 m, all within

0.74 g/t Au over 95.00 m

1.07 g/t Au over 13.00 m, and

0.61 g/t Au over 83.00 m, all within

0.52 g/t Au over 118.00 m

Diamond drill hole drill ending in mineralization; total hole length 322.17 m

CMR25-080

1.09 g/t Au over 25.91 m, within

0.62 g/t Au over 89.92 m

RC drill hole ending in mineralization; total hole length 91.44 m

CMR25-091

1.02 g/t Au over 21.34 m, within

0.55 g/t Au over 72.54 m

RC drill hole ending in mineralization; total hole length 80.16 m

CMR25-100

1.27 g/t Au over 15.24 m, and

1.09 g/t Au over 9.14, all within

0.49 g/t Au over 115.82 m

RC drill hole ending in mineralization; total hole length 121.92 m

CMR25-073

1.08 g/t Au over 13.72 m, and

0.96 g/t Au over 10.67 m, all within

0.46 g/t Au over 91.44 m

RC drill hole ending in mineralization; total hole length 91.44 m

CMD25-029

0.83 g/t Au over 49.00 m, within

0.45 g/t Au over 179.00 m

Diamond drill hole drill ending in mineralization; total hole 321.56 m

Results Summary

A summary of the results released today for the 38 RC holes are presented by drill section in Table 1, and a summary of the four diamond drill core results are presented in Table 2. Data pertaining to locations of drill holes included in the announcement are presented in Table 3. Full assay results for the 38 RC and four core results can be found at this link: Click Here for Full Assay Results.

Chicken Mountain Video and Figures: Please watch a video highlighting the scale and potential of the Chicken Mountain: Click Here to View Video

Drill Plan Maps and Images: Click Here to View. Select images below.

Assay Results From 34 Additional Holes Pending

Remaining 2025 resource delineation drilling at Chicken Mountain

Exploration drilling at Alpha Bowl testing the additional 500m strike potential

First-pass exploration drilling at Black Creek and Jam Intrusion targets

Follow up drilling at Golden Apex

Tectonic will provide further updates as results are received, interpreted, and validated

To learn more about the 2025 Drill Programs, click here: Tectonic Metals Delivers Record 18,372 Metres Across 125 Drill Holes at Flat Gold Project, Alaska

Figure 1: Plan View and Long Section looking Northeast, drill results and pending drill hole assays can be viewed at: CLICK HERE TO VIEW FIGURE 1

Figure 2: Plan View of Chicken Mountain, highlighting the interpreted higher grade corridors can be viewed at: CLICK HERE TO VIEW FIGURE 2

Figure 3: Plan View of Chicken Mountain South Area, highlighting the drilling lines, drill results and pending drill hole assays can be viewed at: CLICK HERE TO VIEW FIGURE 3

Figure 4: Cross Section Looking North of Drilling Line 1, highlighting drill results and higher grade corridors can be viewed at: CLICK HERE TO VIEW FIGURE 4

Table 1. Significant Highlights Chicken Mountain RC Drill Results Line 1*

Hole ID

From (m)

To (m)

Length (m)

Au (g/t)

CMR25-069

25.91

44.20

18.29

0.49

RC

including

28.96

30.48

1.52

1.17

TD=44.20 m

with

36.58

42.67

6.10

0.77

End in Min: Yes

CMR25-070

38.11

83.84

45.73

0.55

RC

including

38.11

77.74

39.63

0.62

TD=105.18 m

with

56.40

77.74

21.34

0.78

End in Min: Yes

89.94

105.18

15.24

0.33

CMR25-073

0.00

91.44

91.44

0.46

RC

including

12.19

28.96

16.76

0.75

TD=91.44 m

with

15.24

25.91

10.67

0.96

End in Min: Yes

and including

74.68

88.39

13.72

1.08

TD=91.44 m

End in Min: Yes

86.87

88.39

1.52

6.22

CMR25-076

64.01

92.96

28.96

0.52

RC

including

71.63

89.92

18.29

0.71

TD=103.63 m

with

79.25

89.92

10.67

1.00

End in Min: No

and with

83.82

85.34

1.52

4.57

CMR25-077

15.24

51.82

36.58

0.37

RC

including

18.29

32.00

13.72

0.52

TD=53.34 m

End in Min: Yes

CMR25-080

1.52

91.44

89.92

0.62

RC

including

9.14

18.29

9.14

0.78

TD=91.44 m

and including

38.10

64.01

25.91

1.09

End in Min: Yes

CMR25-083

1.52

33.53

32.00

0.79

RC

including

9.14

28.96

19.81

1.06

TD=77.24 m

End in Min: Yes

38.10

77.72

39.62

0.39

including

50.29

53.34

3.05

1.18

and including

62.48

67.06

4.57

0.78

CMR25-084

1.52

38.10

36.58

9.94

RC

including

13.72

36.58

22.86

15.73

TD=54.86 m

with

13.72

16.76

3.05

104.23

End in Min: Yes

44.20

47.24

3.05

0.64

51.82

54.86

3.05

1.01

CMR25-086

0.00

42.67

42.67

0.48

RC

including

1.52

6.10

4.57

0.80

TD=96.01 m

End in Min: Yes

28.96

39.62

10.67

0.97

including

28.96

32.00

3.05

1.82

with

36.58

39.62

3.05

1.27

48.77

96.01

47.24

0.51

including

51.82

70.10

18.29

0.73

with

89.92

96.01

6.10

1.11

CMR25-087

0.00

48.77

48.77

0.51

RC

including

0.00

3.05

3.05

0.65

TD=74.68 m

and including

10.67

19.81

9.14

1.61

End in Min: Yes

with

12.19

13.72

1.52

7.06

CMR25-090

0.00

32.00

32.00

0.40

RC

including

6.10

30.48

24.38

0.48

TD=32.00 m

with

13.72

19.81

6.10

0.89

End in Min: Yes

and with

27.43

30.48

3.05

0.54

CMR25-091

7.62

80.16

72.54

0.55

RC

including

9.14

67.06

57.91

0.62

TD=80.16 m

with

13.72

41.15

27.43

0.88

End in Min: Yes

with

18.29

39.62

21.34

1.02

*All reported intercepts are reported as downhole lengths, as insufficient data exists to determine true widths. Select composites utilizing 0.10, 0.30 or 0.50 g/t Au cut-off with a maximum 3.2m continuous (two sample) below the cut-off inclusion.

Table 1. Significant Highlights Chicken Mountain RC Drill Results Line 2*

Hole No.

From (m)

To (m)

Length (m)

Au g/t

CMR25-072

1.52

7.62

6.10

0.66

RC

including

6.10

7.62

1.52

2.36

TD=65.53 m

End in Min: Yes

13.72

24.38

10.67

0.39

including

19.81

24.38

4.57

0.69

35.05

41.15

6.10

0.34

including

38.10

41.15

3.05

0.53

48.77

65.53

16.76

0.30

51.82

59.44

7.62

0.47

CMR25-074

0.00

48.78

48.78

0.25

RC

including

32.01

39.63

7.62

0.79

TD=82.32 m

End in Min: No

CMR25-078

47.24

64.01

16.76

0.34

RC

including

51.82

56.39

4.57

0.66

TD=50.29 m

End in Min: Yes

CMR25-081

12.19

24.38

12.19

0.50

RC

including

12.19

16.76

4.57

1.09

TD=44.20 m

End in Min: No

CMR25-082

0.00

16.76

16.76

0.30

RC

9.14

10.67

1.52

0.81

TD=19.81 m

End in Min: Yes

CMR25-085

32.00

97.54

65.53

0.31

RC

including

51.82

53.34

1.52

1.14

TD=99.06 m

and including

62.48

68.58

6.10

0.68

End in Min: Yes

and including

73.15

82.30

9.14

0.70

CMR25-088

1.52

51.82

50.29

0.32

RC

including

3.05

10.67

7.62

0.41

TD=79.25 m

and including

42.67

45.72

3.05

0.48

End in Min: Yes

56.39

79.25

22.86

0.20

including

56.39

57.91

1.52

0.90

CMR25-089

4.57

57.91

53.34

0.45

RC

including

4.57

21.34

16.76

0.60

TD=57.91 m

with

9.14

16.76

7.62

0.97

End in Min: Yes

with

13.72

16.76

3.05

1.61

and including

35.05

41.15

6.10

0.54

and including

47.24

54.86

7.62

0.89

with

51.82

54.86

3.05

1.64

CMR25-092

13.72

73.15

59.44

0.29

RC

including

16.76

33.53

16.76

0.44

TD=74.68 m

and including

44.20

48.77

4.57

0.65

End in Min: Yes

CMR25-093

0.00

60.96

60.96

0.42

RC

including

10.67

15.24

4.57

0.64

TD=60.96 m

and including

47.24

60.96

13.72

1.01

End in Min: Yes

with

53.34

60.96

7.62

1.59

CMR25-096

6.10

68.58

62.48

0.34

RC

including

7.62

28.96

21.34

0.58

TD=106.68 m

with

7.62

13.72

6.10

0.92

End in Min: Yes

82.30

106.68

24.38

0.25

including

102.11

103.63

1.52

1.04

*All reported intercepts are reported as downhole lengths, as insufficient data exists to determine true widths. Select composites utilizing 0.10, 0.30 or 0.50 g/t Au cut-off with a maximum 3.2m continuous (two sample) below the cut-off inclusion.

Table 1. Significant Highlights Chicken Mountain RC Drill Results Line 3*

Hole No.

From (m)

To (m)

Length (m)

Au g/t

CMR25-094

3.05

89.92

86.87

0.19

RC

including

6.10

12.19

6.10

0.41

TD=89.92 m

and including

35.05

42.67

7.62

0.30

End in Min: Yes

and including

86.87

89.92

3.05

0.49

CMR25-095

13.72

24.38

10.67

0.26

RC

including

13.72

15.24

1.52

0.85

TD=53.34m

End in Min: Yes

CMR25-097

44.20

83.82

39.62

0.37

RC

including

51.82

54.86

3.05

0.36

TD=85.34m

and including

57.91

77.72

19.81

0.49

End in Min: Yes

with

57.91

73.15

15.24

0.53

CMR25-100

3.05

118.87

115.82

0.49

RC

including

18.29

54.86

36.58

0.95

TD=121.92 m

with

21.34

30.48

9.14

1.09

End in Min: No

and with

39.62

54.86

15.24

1.27

CMR25-102

15.24

83.82

68.58

0.35

RC

including

18.29

32.00

13.72

0.56

TD=83.82

with

27.43

32.00

4.57

1.12

End in Min: Yes

and including

38.10

45.72

7.62

0.47

and including

57.91

60.96

3.05

1.45

CMR25-104

9.14

38.10

28.96

0.27

RC

including

9.14

22.86

13.72

0.38

TD=90.01

End in Min: Yes

42.67

96.01

53.34

0.40

including

54.86

77.72

22.86

0.66

with

57.91

64.01

6.10

1.20

with

57.91

60.96

3.05

1.79

CMR25-105

7.62

59.44

51.82

0.29

RC

including

9.14

13.72

4.57

0.46

TD=59.44 m

and including

21.34

27.43

6.10

0.80

End in Min: Yes

with

24.38

25.91

1.52

2.05

CMR25-106

12.19

35.05

22.86

0.62

RC

including

19.81

35.05

15.24

0.82

TD=35.05

with

24.38

35.05

10.67

0.95

End in Min: Yes

*All reported intercepts are reported as downhole lengths, as insufficient data exists to determine true widths. Select composites utilizing 0.10, 0.30 or 0.50 g/t Au cut-off with a maximum 3.2m continuous (two sample) below the cut-off inclusion.

Table 1. Significant Highlights Chicken Mountain RC Drill Results Line 4*

Hole No.

From (m)

To (m)

Length (m)

Au g/t

CMR25-098

4.57

60.96

56.39

0.41

RC

including

28.96

44.20

15.24

1.05

TD=79.25 m

with

36.58

42.67

6.10

2.09

End in Min: Yes

and including

57.91

60.96

3.05

0.76

74.68

99.06

24.38

0.39

including

76.20

80.77

4.57

0.47

and including

94.49

96.01

1.52

2.70

CMR25-099

3.05

68.58

65.53

0.25

RC

including

13.72

15.24

1.52

1.28

TD=83.82 m

and including

44.20

51.82

7.62

0.65

End in Min: Yes

with

50.29

51.82

1.52

1.95

and including

57.91

64.01

6.10

0.40

74.68

83.82

9.14

0.36

including

80.77

82.30

1.52

0.73

CMR25-101

6.10

36.58

30.48

0.17

RC

including

18.29

19.81

1.52

0.54

TD=109.73 m

End in Min: No

70.10

74.68

4.57

1.21

CMR25-103

102.11

106.68

4.57

0.31

RC

TD=106.68 m

End in Min: Yes

*All reported intercepts are reported as downhole lengths, as insufficient data exists to determine true widths. Select composites utilizing 0.10, 0.30 or 0.50 g/t Au cut-off with a maximum 3.2m continuous (two sample) below the cut-off inclusion.

Table 2. Significant Highlights Chicken Mountain Diamond Drill Core Assay Results Line 1*

Hole ID

From (m)

To (m)

Length (m)

Au (g/t)

CMD25-027

29.00

38.00

9.00

0.30

Core

including

29.00

34.00

5.00

0.45

TD=322.17 m

End in Min: Yes

52.00

60.00

8.00

0.72

including

59.00

60.00

1.00

4.61

65.00

183.00

118.00

0.52

including

91.00

174.00

83.00

0.61

with

100.00

127.00

27.00

0.71

and with

147.00

153.00

6.00

1.15

and with

161.00

174.00

13.00

1.07

189.00

223.00

34.00

0.41

including

196.00

203.00

7.00

1.14

227.00

322.17

95.17

0.74

with

235.00

239.00

4.00

1.08

and including

255.00

258.00

3.00

0.86

and including

263.00

272.00

9.00

1.85

and including

276.00

292.00

16.00

1.77

with

282.00

292.00

10.00

2.65

with

282.00

287.00

5.00

4.79

CMD25-029

0.00

107.00

107.00

0.25

Core

including

69.00

94.00

25.00

0.35

TD=321.56

with

76.00

84.00

8.00

0.42

End in Min: Yes

and including

99.00

107.00

8.00

0.39

with

99.00

105.00

6.00

0.42

125.00

304.00

179.00

0.45

including

170.00

174.00

4.00

0.60

and including

204.00

253.00

49.00

0.83

with

206.00

236.00

30.00

0.87

and with

242.00

251.00

9.00

1.21

and including

275.00

288.00

13.00

0.65

with

278.00

282.00

4.00

1.39

CMD25-032

1.70

83.00

81.30

0.42

Core

including

7.00

22.56

15.56

0.56

TD=271.76 m

with

16.00

22.56

6.56

0.82

End in Min: No

and including

45.00

47.00

2.00

0.53

and including

53.00

62.00

9.00

0.85

with

54.00

59.00

5.00

1.24

and including

71.00

78.00

7.00

0.90

105.00

182.00

77.00

0.45

and including

131.00

152.00

21.00

0.67

with

131.00

141.00

10.00

1.04

and including

156.00

182.00

26.00

0.51

with

163.00

177.00

14.00

0.64

236.00

249.00

13.00

1.04

including

241.00

249.00

8.00

1.62

CMD25-034

3.00

41.00

38.00

0.33

Core

including

3.00

15.00

12.00

0.46

TD=279.20 m

and including

24.00

35.00

11.00

0.42

End in Min: Yes

46.00

86.00

40.00

0.25

including

84.00

86.00

2.00

1.08

95.00

109.00

14.00

0.34

including

97.00

106.00

9.00

0.43

117.00

271.00

154.00

0.25

including

129.00

131.00

2.00

1.60

and including

184.00

187.00

3.00

0.76

and including

193.00

194.00

1.00

1.08

and including

204.00

206.00

2.00

0.56

and including

213.00

227.00

14.00

0.87

with

215.00

224.00

9.00

1.16

*All reported intercepts are reported as downhole lengths, as insufficient data exists to determine true widths. Select composites utilizing 0.10, 0.30 or 0.50 g/t Au cut-off with a maximum 3.2m continuous below cut-off inclusion.

Table 3. Drill Hole Details at Chicken Mountain

Hole No.

Type

Azimuth (o)

Dip (o)

Length (m)

UTM E

UTM N

Prospect

Purpose

CMD25-027

DDH

120

-55

322.17

552448

6916970

Chicken Mountain

Resource Delineation

CMD25-029

DDH

120

-55

321.56

552587

6916886

Chicken Mountain

Resource Delineation

CMD25-032

DDH

120

-55

251.76

552654

6916850

Chicken Mountain

Resource Delineation

CMD25-034

DDH

120

-55

279.20

552709

6916816

Chicken Mountain

Resource Delineation

CMR25-069

RC

120

-55

44.20

552545

6916743

Chicken Mountain

Exploration

CMR25-070

RC

120

-70

105.20

552545

6916743

Chicken Mountain

Resource Delineation

CMR25-071

RC

120

-55

16.80

552564

6916500

Chicken Mountain

Exploration

CMR25-072

RC

120

-60

65.53

552564

6916500

Chicken Mountain

Exploration

CMR25-073

RC

120

-55

91.45

552567

6916730

Chicken Mountain

Resource Delineation

CMR25-074

RC

120

-55

82.30

552593

6916483

Chicken Mountain

Exploration

CMR25-075

RC

120

-75

48.80

552592

6916484

Chicken Mountain

Exploration

CMR25-076

RC

120

-55

99.10

552611

6916699

Chicken Mountain

Resource Delineation

CMR25-077

RC

120

-75

53.34

552610

6916699

Chicken Mountain

Exploration

CMR25-078

RC

120

-50

71.62

552629

6916469

Chicken Mountain

Exploration

CMR25-079

RC

120

-75

24.40

552628

6916469

Chicken Mountain

Exploration

CMR25-080

RC

120

-55

91.44

552663

6916670

Chicken Mountain

Resource Delineation

CMR25-081

RC

120

-55

44.20

552667

6916451

Chicken Mountain

Exploration

CMR25-082

RC

120

-75

19.81

552666

6916451

Chicken Mountain

Exploration

CMR25-083

RC

120

-55

77.72

552710

6916641

Chicken Mountain

Resource Delineation

CMR25-084

RC

120

-65

54.90

552710

6916641

Chicken Mountain

Resource Delineation

CMR25-085

RC

120

-55

99.10

552684

6916442

Chicken Mountain

Exploration

CMR25-086

RC

120

-55

96.01

552750

6916621

Chicken Mountain

Resource Delineation

CMR25-087

RC

120

-75

76.68

552750

6916621

Chicken Mountain

Exploration

CMR25-088

RC

120

-55

79.25

552740

6916419

Chicken Mountain

Exploration

CMR25-089

RC

120

-75

57.91

552739

6916420

Chicken Mountain

Exploration

CMR25-090

RC

120

-55

32.00

552805

6916588

Chicken Mountain

Resource Delineation

Earlier from Tectonic Metals Inc.