OreStocks

Scandium Canada Ltd. press release

Eloro Resources Continues to Expand Higher-Grade Tin and Silver Mineralization in Step-Out Definition Drilling at its Iska Iska Project, Potosí Department, Bolivia

TSXV - TSX Venture Exchange · Scandium · Rare Earth Elements · Gold · Canada

Highlights:

DSB-78, a step-out hole 75m southwest of discovery hole DSB-72, intersected a higher-grade tin zone grading 0.40% Sn over 79.50m beginning at 319.60m, including a higher-grade section of 0.89% Sn over 16.50m beginning at 366.10m. Further downhole, it intersected 0.57% Sn over 25.50m beginning at 486.10m, including a section grading 0.90% Sn over 13.50m beginning at 495.10m. Hole DSB-79 , a step-out hole collared 75m southwest of hole DSB-64, intersected both silver- and tin-enriched zones. Higher-grade silver grading 52.73 g/t Ag over 43.50m occurs from 214.10m, including 401.65 g/t Ag over 3.00m beginning at 244.10m. Further down hole a number of higher grade tin intersections were returned including: 0.43% Sn over 3.00m beginning at 404.60m, 0.31% Sn over 9.00m beginning at 418.10m, 0.72% Sn over 4.50m beginning at 454.10m, 0,21% Sn over 6.00m beginning at 440.60m, and 0.28% Sn over 1.50m beginning at 472.10m. DSB-81, a step-out hole 50m southwest of hole DSB-35, intersected 0.18% Sn over 57.00m beginning at 9.60m, including higher grade sections of 0.33% Sn over 6.00m beginning at 9.6m and 0.32% Sn over 6.00m beginning at 44.10m. Hole DSB-82 drilled 50m northeast of hole DSB-35 intersected 0.16% Sn and 14.19 g/t Ag over 15.00m beginning at 97.80m. It also intersected 0.23% Sn over 12.00m beginning at 472.80m. DSB-83 drilled 135m northeast of discovery hole DSB-72, intersected a number of significant silver and tin intervals: 39.43 g/t Ag over 31.50m beginning at 52.30m, including 43.53 g/t Ag over 25.50m beginning at 52.30m. 51.24 g/t Ag over 25.50m beginning at 313.50m, including 69.22 g/t Ag over 13.50m beginning at 315.00m. 0.39% Sn and 33.62 g/t Ag over 49.50m beginning at 349.50m, including 0.84% Sn over 3.75m beginning at 367.50m, and 1.10% Sn over 6.00m beginning at 390.00m. 0.22% Sn over 15.00m beginning at 408.00m. 0.23% Sn over 6.00m beginning at 457.50m. 37.91 g/t Ag over 16.50m beginning at 513.00m, including 87.00 g/t Ag over 4.50m beginning at 513.00m. 0.29% Sn over 1.50m beginning at 540.00m.

_Note: __True width is approximately 80% of core length. Silver equivalent (Ag eq) grades are calculated using 3-year average metal prices of Ag = US$24.14/oz, Zn = US$1.36/lb , Pb = 0.98/lb and Sn = US$13.74/lb, and preliminary metallurgical recoveries of Ag = 88%, Zn = 87%, Pb= 80% and Sn = 50%. In selecting intervals, a cutoff grade of 30 g Ag eq/t has been used. Lower grade material may be included in intersections where geological continuity is warranted. _

Results from the first 5 diamond drillholes from the restart definition drill program has significantly expanded the higher-grade tin mineralization and the shallower higher grade silver mineralized zone which is above the tin zone. The tin mineralization is extended at least 100m laterally beyond the known mineralization in the western part of the Santa Barbara zone and remains open along strike.

TORONTO, Aug. 06, 2025 (GLOBE NEWSWIRE) -- Eloro Resources Ltd. (TSX: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”) is pleased to announce assay results from the first five (5) drillholes of the restart phase definition diamond drilling program in the predominant tin domain potential Santa Barbara starter pit area in the Iska Iska silver-tin polymetallic project in the Potosi Department of southwestern Bolivia. A total of 2,871.4m of diamond drilling has been completed in these five (5) holes with assays pending for the remaining three holes totalling 1,413.90m. Figure 1 shows the location of drill holes reported, Table 1 lists significant assay results and Table 2 lists drill hole coordinates.

Tom Larsen, Eloro’s CEO commented: “The new drill results are significantly expanding on the existing mineralization in the predominant tin domain, further adding to the solid foundation for building the initial open pit mineral resource. We continue to be encouraged with the higher-grade tin and silver drill results. The Santa Barbara Zone continues to be open laterally and downdip, offering significant potential for further infill and step-out drilling to further expand and upgrade resources for the planned PEA.”

Dr. Osvaldo Arce, P.Geo., Executive Vice President Operations Latin America for Eloro added: “The current closer-spaced definition drill program has both upgraded and expanded the mineralization with significant higher-grade tin and silver zones which are still open laterally and at depth in the potential starter pit area at Santa Barbara zone. This highlights the significant opportunity to outline additional higher-grade mineral resources presently defined in a 700m x 400m x 500m potential starter pit, as well as further enlarging this target to the NE and SE.”

Definition Drill Program, Santa Barbara Potential Starter Pit Area

Holes DSB-78 and DSB-79 were drilled on the southwestern margin of the potential starter pit area at Santa Barbara as shown in Figure 1. Hole DSB-78 is located 75m southwest of discovery hole DSB-72 and hole DSB-79 is located 75m southwest of hole DSB-64. Both holes intersected significant tin mineralization in intrusion breccia (TIB) and locally in phreatomagmatic breccia. Tin intersections in both holes are visibly coarse and medium grained cassiterite which are likely to be amenable to multi-gravity separation.

Hole DSB-78 intersected 0.40% Sn over 79.50m from 319.60m to 399.10m, including a higher-grade section of 0.89% Sn over 16.50m from 366.10m to 382.60m. It also intersected 0.57% Sn over 25.50m from 486.10m to 511.60m, including a section grading 0.90% Sn over 13.50m from 495.10m to 508.60m. In addition, it intersected 38 g/t Ag and 0.50% Sn over 3.00m from 7.60m to 10.60m; 390.40 g/t Ag and 0.25% Sn over 3.75m from 224.35m to 228.10m; 51.33 g/t Ag over 4.50m from 244.60m to 249.10m, and 0.42% Sn over 3.00m from 549.10m to 552.10m.

Hole DSB-79 intersected both silver and tin enriched zones. A higher-grade silver intersection of 52.73 g/t Ag over 43.50m was returned from 214.10m to 257.60m, including 401.65 g/t Ag over 3.00m from 244.10m to 247.10m. Multiple zones of deeper higher-grade tin mineralization were intersected including 0.43% Sn over 3.00m from 404.60m to 407.60m, 0.31% Sn over 9.00m from 418.10m to 427.10, 0.72% Sn over 4.50m from 454.10m to 458.60m, 0,21% Sn over 6.00m from 440.60m to 446.60m, and 0.28% Sn over 1.50m from 472.10m to 473.60m. Shallow higher grade tin mineralization of 0.21% Sn and 19.50 g/t Ag over 19.50m from 86.60m to 106.10m, including 0.47% Sn over 6.00m, was also intersected.

Holes DSB-81 and DSB-82 were drilled on the western margin of the potential starter pit area at Santa Barbara as shown in Figure 1. Hole DSB-81 is located 50m southwest of hole DSB-35 and DSB-82 is located 50m northeast of hole DSB-35. Both holes intersected moderate intensity tin mineralization in intrusion breccia (TIB), the principal host for higher grade tin mineralization at Iska Iska (see Eloro press releases dated January 23, 2025 and February 20, 2025 for further detail) and minorly in medium grained dacitic dome. Tin intersections in both holes are visibly coarse and medium grained cassiterite which are likely to be amenable to multi-gravity separation.

Hole DSB-81 intersected 0.18% Sn over 57.00m from 9.60m to 66.60m including higher grade sections of 0.33% Sn over 6.00m from 9.60m to 15.60m and 0.32% Sn over 6.00m from 44.10m to 50.10m. Shallower higher grade silver and tin mineralization was also intersected, including 48.00 g/t Ag and 0.23% Sn over 0.75m from 80.85m to 81.60m; and 55.00 g/t Ag and 0.75% Sn over 1.50m from 237.60m to 239.10m.

Hole DSB-82 intersected 0.16% Sn and 14.19 g/t Ag over 15.00m from 97.80m to 112.80m, 0.23% Sn over 12m from 472.80m to 484.80m and 0.17% Sn over 12m from 594.30 to 606.30m. Shallower tin mineralization was also intersected, including 0.28% Sn over 3.90m from 0.90m to 4.80m; 0.26% Sn over 1.50m from 34.80m to 36.30m; 0.27% Sn over 4.50m from 81.30m to 85.80m; 0.38% Sn over 1.50m from 130.80m to 132.30m and 0.48% Sn over 4.50m from 139.80m to 144.30m.

Hole DSB-83 was drilled on the central part of the potential starter pit area at Santa Barbara as shown in Figure 1. It is located 135m northeast of discovery hole DSB-72 and intersected multiple silver and tin intervals, mostly in intrusion breccia and locally in medium grained dacite. The first mineralized interval was intersected in the oxides zone related to silver mineralization. Subsequently, multiple mineralized interceptions were encountered in the lower part of the hole in the sulphides zone starting from 313.50 to 541.50m in intrusion breccia (TIB). The mineralizing sequence starts with shallow silver mineralization, continues deeper to tin-silver combined mineralization, followed by a tin interval, then another silver interval, finally ending with a tin interval. This is interpreted as a continuous overprinting between high-temperature tin mineralization and lower-temperature epithermal silver mineralization.

Hole DSB-83 intersected the following mineralized intervals:

39.43 g/t Ag over 31.50m from 52.30m to 83.80m, including 43.53 g/t Ag over 25.50m from 52.30m to 77.80m. 32.26 g/t Ag over 4.70m from 112.30m to 117.00m. 51.24 g/t Ag over 25.50m from 313.50m to 339.00m, including 69.22 g/t Ag over 13.50m from 315.00m to 328.50m. 0.39% Sn and 33.62 g/t Ag over 49.50m from 349.50m to 300.00m, including 0.41% Sn over 7.50m from 349.50m to 357.00m; 0.84% Sn over 3.75m from 367.50m to 371.25m; 0.41% Sn over 7.50m from 379.50m to 387.00m; and 1.10% Sn over 6.00m from 390.00m to 396.00m. 0.22% Sn over 15.00m from 408.00m to 423.00m. 0.21% Sn over 1.50m from 450.00m to 451.50m. 0.23% Sn over 6.00m from 457.50m to 463.50m. 37.91 g/t Ag over 16.50m from 513.00m to 529.50m, including 87.00 g/t Ag over 4.50m from 513.00m 517.50m. 0.29% Sn over 1.50m from 540.00m to 541.50m.

Table 1: Definition Diamond Drill Results as of August 1, 2025, Santa Barbara, Iska, Iska

| SANTA BARBARA DEFINITION DIAMOND DRILL RESULTS – PREDOMINANT Sn DOMAIN | | | | | | | | | | Hole No. | From (m) | To (m) | Length (m) | Ag | Zn | Pb | Sn | Ag eq. | | g/t | % | % | % | g/t | | | | | | DSB-78 | 7.60 | 10.60 | 3.00 | 38.00 | 0.00 | 0.06 | 0.50 | 132.38 | | | 108.10 | 117.10 | 9.00 | 4.67 | 0.00 | 0.01 | 0.22 | 46.61 | | | 145.60 | 148.60 | 3.00 | 21.00 | 0.00 | 0.00 | 0.21 | 58.67 | | | 204.10 | 213.10 | 9.00 | 37.17 | 0.00 | 0.04 | 0.04 | 40.75 | | | 224.35 | 228.10 | 3.75 | 390.40 | 0.00 | 0.07 | 0.25 | 393.55 | | | 244.60 | 249.10 | 4.50 | 51.33 | 0.00 | 0.01 | 0.01 | 47.84 | | | 262.60 | 264.10 | 1.50 | 4.00 | 0.00 | 0.01 | 0.34 | 70.16 | | | 277.60 | 280.60 | 3.00 | 10.50 | 0.00 | 0.03 | 0.41 | 89.63 | | | 319.60 | 399.10 | 79.50 | 2.43 | 0.00 | 0.01 | 0.40 | 80.67 | | Incl. | 366.10 | 382.60 | 16.50 | 6.14 | 0.00 | 0.01 | 0.89 | 179.78 | | | 441.10 | 442.60 | 1.50 | 0.50 | 0.05 | 0.02 | 0.36 | 72.27 | | | 486.10 | 511.60 | 25.50 | 1.38 | 0.17 | 0.02 | 0.57 | 118.64 | | Incl. | 495.10 | 508.60 | 13.50 | 1.00 | 0.04 | 0.02 | 0.90 | 178.92 | | | 537.10 | 541.60 | 4.50 | 0.92 | 0.02 | 0.03 | 0.25 | 51.74 | | | 549.10 | 552.10 | 3.00 | 2.50 | 0.02 | 0.02 | 0.42 | 85.38 | | DSB-79 | 86.60 | 106.10 | 19.50 | 18.57 | 0.02 | 0.03 | 0.21 | 59.42 | | Incl. | 86.60 | 92.60 | 6.00 | 2.80 | 0.03 | 0.02 | 0.47 | 95.25 | | | 142.10 | 146.60 | 4.50 | 16.10 | 0.01 | 0.03 | 0.16 | 45.40 | | | 214.10 | 257.60 | 43.50 | 52.73 | 0.00 | 0.05 | 0.04 | 56.00 | | Incl. | 244.10 | 247.10 | 3.00 | 401.65 | 0.00 | 0.13 | 0.02 | 361.13 | | | 338.60 | 343.85 | 5.25 | 3.97 | 0.00 | 0.03 | 0.30 | 62.92 | | | 353.60 | 355.10 | 1.50 | 5.20 | 0.00 | 0.00 | 0.20 | 44.49 | | | 391.10 | 392.60 | 1.50 | 2.70 | 0.00 | 0.01 | 0.24 | 50.18 | | | 404.60 | 407.60 | 3.00 | 3.65 | 0.00 | 0.03 | 0.43 | 87.76 | | | 418.10 | 427.10 | 9.00 | 0.98 | 0.00 | 0.01 | 0.31 | 61.85 | | | 440.60 | 446.60 | 6.00 | 1.28 | 0.01 | 0.02 | 0.21 | 43.61 | | | 454.10 | 458.60 | 4.50 | 0.63 | 0.01 | 0.01 | 0.72 | 140.72 | | | 472.10 | 473.60 | 1.50 | 0.30 | 0.01 | 0.00 | 0.28 | 54.43 | | DSB-81 | 9.60 | 66.60 | 57.00 | 5.58 | 0.00 | 0.01 | 0.18 | 39.54 | | Incl. | 9.60 | 15.60 | 6.00 | 10.25 | 0.00 | 0.00 | 0.33 | 72.89 | | Incl. | 44.10 | 50.10 | 6.00 | 3.50 | 0.00 | 0.02 | 0.32 | 65.81 | | | 80.85 | 81.60 | 0.75 | 48.00 | 0.00 | 0.16 | 0.23 | 90.63 | | | 104.10 | 105.60 | 1.50 | 14.00 | 0.01 | 0.09 | 0.31 | 75.91 | | | 203.10 | 204.60 | 1.50 | 13.00 | 0.00 | 0.00 | 0.16 | 42.57 | | | 237.60 | 239.10 | 1.50 | 55.00 | 0.00 | 0.24 | 0.75 | 200.67 | | | 312.60 | 314.10 | 1.50 | 12.00 | 0.00 | 0.02 | 0.45 | 98.76 | | DSB-82 | 0.90 | 4.80 | 3.90 | 8.87 | 0.00 | 0.05 | 0.28 | 62.79 | | | 34.80 | 36.30 | 1.50 | 4.40 | 0.00 | 0.01 | 0.26 | 55.58 | | | 81.30 | 85.80 | 4.50 | 12.10 | 0.00 | 0.03 | 0.27 | 63.91 | | | 97.80 | 112.80 | 15.00 | 14.19 | 0.00 | 0.09 | 0.16 | 44.97 | | | 130.80 | 132.30 | 1.50 | 6.50 | 0.00 | 0.21 | 0.38 | 84.39 | | | 139.80 | 144.30 | 4.50 | 47.00 | 0.00 | 0.23 | 0.48 | 140.01 | | | 154.80 | 159.30 | 4.50 | 28.23 | 0.00 | 0.07 | 0.09 | 43.53 | | | 256.80 | 259.80 | 3.00 | 2.10 | 0.34 | 0.01 | 0.16 | 45.66 | | | 432.30 | 433.80 | 1.50 | 1.10 | 0.00 | 0.00 | 0.20 | 40.23 | | | 460.80 | 463.80 | 3.00 | 0.30 | 0.00 | 0.00 | 0.31 | 61.34 | | | 472.80 | 484.80 | 12.00 | 0.75 | 0.00 | 0.01 | 0.23 | 46.68 | | | 490.80 | 493.80 | 3.00 | 0.60 | 0.00 | 0.00 | 0.24 | 48.08 | | | 532.80 | 535.05 | 2.25 | 43.83 | 0.01 | 0.05 | 0.04 | 47.69 | | | 576.30 | 577.80 | 1.50 | 20.20 | 0.27 | 0.04 | 0.30 | 86.69 | | | 594.30 | 606.30 | 12.00 | 22.51 | 0.03 | 0.05 | 0.17 | 55.48 | | DSB-83 | 52.30 | 83.80 | 31.50 | 39.43 | 0.00 | 0.06 | 0.08 | 52.03 | | Incl. | 52.30 | 77.80 | 25.50 | 43.53 | 0.00 | 0.07 | 0.09 | 57.57 | | | 112.30 | 117.00 | 4.70 | 32.26 | 0.00 | 0.00 | 0.01 | 29.73 | | | 259.50 | 267.00 | 7.50 | 72.80 | 0.01 | 0.03 | 0.06 | 76.49 | | | 313.50 | 339.00 | 25.50 | 51.24 | 0.00 | 0.00 | 0.05 | 55.02 | | Incl. | 315.00 | 328.50 | 13.50 | 69.22 | 0.00 | 0.00 | 0.07 | 74.84 | | | 349.50 | 399.00 | 49.50 | 33.62 | 0.00 | 0.14 | 0.39 | 108.17 | | Incl. | 349.50 | 357.00 | 7.50 | 29.20 | 0.00 | 0.00 | 0.41 | 105.39 | | Incl. | 367.50 | 371.25 | 3.75 | 2.40 | 0.00 | 0.34 | 0.84 | 173.45 | | Incl. | 379.50 | 387.00 | 7.50 | 27.00 | 0.00 | 0.20 | 0.41 | 108.48 | | Incl. | 390.00 | 396.00 | 6.00 | 85.75 | 0.00 | 0.23 | 1.10 | 294.48 | | | 408.00 | 423.00 | 15.00 | 3.80 | 0.00 | 0.03 | 0.22 | 46.88 | | | 450.00 | 451.50 | 1.50 | 7.00 | 0.01 | 0.03 | 0.21 | 47.41 | | | 457.50 | 463.50 | 6.00 | 0.88 | 0.00 | 0.04 | 0.23 | 46.67 | | Incl. | 513.00 | 517.50 | 4.50 | 87.00 | 0.01 | 0.01 | 0.02 | 81.17 | | | 513.00 | 529.50 | 16.50 | 37.91 | 0.01 | 0.00 | 0.03 | 40.23 | | | 540.00 | 541.50 | 1.50 | 1.00 | 0.01 | 0.00 | 0.29 | 57.12 |

Note: True width is approximately 80% of core length. Silver equivalent (Ag eq) grades are calculated using 3-year average metal prices of Ag = US$24.14/oz, Zn = US$1.36/lb , Pb = 0.98/lb and Sn = US$13.74/lb, and preliminary metallurgical recoveries of Ag = 88%, Zn = 87%, Pb= 80% and Sn = 50%. In selecting intervals, a cutoff grade of 30 g Ag eq/t has been used. Lower grade material may be included in intersections where geological continuity is warranted.

Figure 1: Location Map of Definition Diamond Drill Holes, Santa Barbara zone, Iska Iska. The yellow circles highlight the location of holes DSB-78, DSB-79, DSB-81, DSB-82 and DSB-83 referred to in this release.

Table 2: Summary of Diamond Drill Hole Coordinates for Drill Holes Completed at Iska Iska as of August 1, 2025

| Hole No. | Type | Collar Easting | Collar Northing | Elev | Azimuth | Angle | Hole Length (m) | | DSB-78 | P | 205055 | 7656072 | 4340 | 225° | -85° | 554.6 | | DSB-79 | P | 205076 | 7656025 | 4324 | 225° | -85° | 500.3 | | DSB-81 | P | 204979 | 7656137 | 4357 | 225° | -85° | 608.6 | | DSB-82 | P | 205048 | 7656206 | 4362 | 225° | -85° | 650.3 | | DSB-83 | P | 205184 | 7656202 | 4334 | 225° | -85° | 557.6 | | | | | | | | Subtotal | 2,871.4 |

Qualified Person (“QP”)

Dr. Osvaldo Arce, P.Geo. Executive Vice President, Latin America for Eloro and General Manager of Eloro’s Bolivian subsidiary, Minera Tupiza S.R.L, and a Qualified Person (“QP”) as defined by National Instrument (“NI”) 43-101 has reviewed and approved the technical content of this news release. Dr. Arce has supervised all field work carried out at Iska Iska.

Eloro utilized both ALS and AHK for drill core analyses, both of whom are major international accredited laboratories. Drill samples sent to ALS were prepared in both ALS Bolivia Ltda’s preparation facility in Oruro, Bolivia and the preparation facility operated by AHK in Tupiza with pulps sent to the main ALS Global laboratory in Lima for analysis. Eloro employs an industry standard QA/QC program with standards, blanks and duplicates inserted into each batch of samples analyzed with selected check samples sent to a separate accredited laboratory.

Drill core samples sent to AHK Laboratories were prepared in a preparation facility installed and managed by AHK in Tupiza with pulps sent to the AHK laboratory in Lima, Peru. Check samples between ALS and AHK are regularly done as a QA/QC check. AHK is following the same analytical protocols used as with ALS and with the same QA/QC protocols.

About Iska Iska

The Iska Iska silver-tin polymetallic project is a road accessible, royalty-free property, wholly controlled by the Title Holder, Empresa Minera Villegas S.R.L. and is located 48 km north of Tupiza city, in the Sud Chichas Province of the Department of Potosi in southern Bolivia. Eloro has an option to earn a 100% interest in Iska Iska.

Iska Iska is a major silver-tin polymetallic porphyry-epithermal complex associated with a Miocene possibly collapsed/resurgent caldera, emplaced on Ordovician age rocks with major breccia pipes, dacitic domes and hydrothermal breccias. The caldera is 1.6km by 1.8km in dimension with a vertical extent of at least 1km. Mineralization age is similar to Cerro Rico de Potosí and other major deposits such as San Vicente, Chorolque, Tasna and Tatasi, all located along the same overall geological trend.

Eloro began underground diamond drilling from the Huayra Kasa underground workings at Iska Iska on September 13, 2020. On November 18, 2020, Eloro announced the discovery of a significant breccia pipe with extensive silver polymetallic mineralization just east of the Huayra Kasa underground workings and a high-grade gold-bismuth zone in the underground workings. On November 24, 2020, Eloro announced the discovery of the Santa Barbara Breccia Pipe (SBBP) approximately 150m southwest of the Huayra Kasa underground workings.

Subsequently, on January 26, 2021, Eloro announced significant results from the first drilling at the SBBP including the discovery hole from 0.0m to 257.5m. Subsequent drilling has confirmed the presence of significant values of Ag-Sn polymetallic mineralization in the SBBP and the adjacent Central Breccia Pipe (CBP). A substantive mineralized envelope which is open along strike and down-dip extends around both major breccia pipes. Continuous channel sampling along the walls of the Santa Barbara Adit located to the east of SBBP returned average grades of 164.96 g Ag/t, 0.46%Sn, 3.46% Pb and 0.14% Cu over 166m including 446 g Ag/t, 9.03% Pb and 1.16% Sn over 56.19m. The west end of the adit intersects the end of the SBBP.

Since the initial discovery hole DHK-15 which returned 29.53g Ag/t, 0.078g Au/t, 1.45%Zn, 0.59%Pb, 0.080%Cu and 0.056%Sn over 257.5m, Eloro has released a number of significant drill results in the SBBP and the surrounding mineralized envelope which, along with geophysical data, has defined an extensive target zone. On October 17, 2023, Eloro filed the NI 43-101 Technical Report outlining the initial inferred MRE for Iska Iska, prepared by independent consultants Micon International Limited. The MRE was reported in two domains, the Polymetallic (Ag-Zn-Pb) Domain which is primarily in the east and south of the Santa Barbara deposit and the Tin (Sn-Ag-Pb) Domain which is primarily in the west and north.

Earlier from Scandium Canada Ltd.