Q2 Metals Intercepts 457.4 metres of 1.65% Li₂O in Drill Hole 44 at the Cisco Lithium Project Highlights: CS25-044 : Two (2) separate intervals, including 457.4 metres (“m”) at 1.65% Li 2 O and 36.9 m at 1.65% Li 2 O . Drill hole CS25-044 is the widest continuous spodumene pegmatite interval drilled by Q2 to date . Infill drilling for incorporation into the initial Mineral Resource Estimate on the Cisco Lithium Project, expected in Q1 2026, will be completed in the coming weeks. The four (4) drill rigs currently operating on the Cisco Lithium Project will pause mid-December and resume in early January. VANCOUVER, British Columbia, Dec. 03, 2025 (GLOBE NEWSWIRE) -- Q2 Metals Corp. (TSX.V: QTWO | OTCQB: QUEXF | FSE: 458) (“ Q2 ” or the “ Company ”) is pleased to report analytical results from the ongoing 2025 drill program (the “ 2025 Drill Program ”) at the Company’s Cisco Lithium Project (the “ Project ” or the “ Cisco Project ”), located within the greater Nemaska traditional territory of the Eeyou Istchee James Bay region of Quebec, Canada. “ Drill hole 44 further showcases the Cisco Project as a globally significant hard rock lithium discovery. The results to date will underpin the inaugural Mineral Resource Estimate, which we expect to announce in the first quarter of 2026, as we continue to advance Cisco,” said Alicia Milne, President and CEO for Q2 Metals. “I am proud and grateful for the tireless efforts of our team which have enabled us to consistently achieve the goals, and milestone targets we publicly set for the Company. ” “The standout result from our drilling to date has clearly been drill hole 44. Not only did hole 44 have extraordinary width and grade but it has significant intervals occurring outside the previously defined bounds of the mineralized zone defined by the Exploration Target (“ET”),” said Neil McCallum, Vice President of Exploration for Q2 Metals. “ Given our success at the drill bit to date, we are very excited for subsequent assay results, particularly from holes CS25-063 and CS25-065, which also intercepted significant mineralization outside the ET boundaries and further expand and define Cisco’s already impressive footprint. ” The analytical results reported herein represent 2,200.4 m of drilling over four (4) drill holes completed during the 2025 Drill Program. Pegmatite intervals and analytical results from the current program will be reported as they are received and reviewed. Figure 1. Map of Recent Drill Holes with Analytical Results at Cisco Property Figure 2. Cross-Section C Table 1. Summary of Analytical Results of Drill Holes CS25-044, 045, 046 and 047 at Cisco Project All intervals of greater than 2 m of core-length and greater than 0.30% Li 2 O are included in Table 1. Internal dilution of non-pegmatite material was limited to intervals of less than 3 m. No specific grade cap or lower cut-offs were used during grade and width calculations. All intervals are reported as core widths and mineralized intervals in all the holes drilled thus far are not representative of the true width as the modelled pegmatite zones are being refined with every additional hole. Drill Hole Collar Information The summary of drill holes CS25-044 to CS25-047 including basic location and dip/azimuth, is detailed below (Table 2). Table 2. Summary of Drill Hole Collar Information, Cisco Project (CS25-044 to CS25-047) The primary focus of the fall and winter drilling campaign is on infill-scale drilling within the main mineralized zone defined by the ET (the “Mineralized Zone”), issued by the Company in July 2025. The Exploration Target estimated a range of potential lithium mineralization at the Mineralized Zone of 215 to 329 million tonnes at a grade ranging from 1.0 to 1.38% Li 2 O and was based only on the first 40 holes drilled. An Exploration Target is used to provide a conceptual estimate of the potential quantity and grade of a mineral deposit, based on known and additional limited geological evidence. It is an early-stage assessment that will help to guide further exploration, but it is not a mineral resource or mineral reserve and should not be treated as such. The drill campaign has been designed to support the Company’s objective of delivering an initial inferred Mineral Resource Estimate in the first quarter of 2026. Drilling at the Cisco Project is ongoing, with four (4) drill rigs currently operating on site. Upcoming Events Members of the Q2 team are currently attending the Mines & Money Resourcing Tomorrow (Booth D35) conference being held in London, UK from December 2-4, 2025. Sampling, Analytical Methods and QA/QC Protocols All drilling was conducted using diamond drill rig with NQ sized core and all drill core samples are shipped to SGS Canada’s preparation facility in Val D’Or, Quebec, for standard sample preparation (code PRP92) which includes drying at 105°C, crushing to 90% passing 2 mm, riffle split 500 g, and pulverize 85% passing 75 microns. The pulps are then shippe