Newcore Gold Ltd. press release
ONGold Announces Updated Mineral Resource Estimate for the Monument Bay Gold Project, Manitoba
TSXV - TSX Venture Exchange · Gold · Canada · Resource Estimate
Toronto, Ontario--(Newsfile Corp. - September 14, 2026) - ONGold Resources Ltd. (TSXV: ONAU) (OTCQB: ONGRF) (the "Company" or "ONGold") announces an updated Mineral Resource Estimate ("MRE") for the Monument Bay Gold Project in northeastern Manitoba (Figure 1), effective July 31, 2026. The 2026 MRE was prepared by SRK Consulting (Canada) Inc. ("SRK") in accordance with the CIM Definition Standards for Mineral Resources and Mineral Reserves adopted by the Canadian Institute of Mining, Metallurgy and Petroleum ("CIM Definition Standards") and National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101").
Highlights:
-
Open-pit constrained Measured and Indicated Mineral Resources: 74.39 million tonnes at 0.84 g/t Au containing 2.0 million ounces of gold (Table 1)
-
Open-pit constrained Inferred Mineral Resources: 24.46 million tonnes at 0.62 g/t Au containing 0.49 million ounces of gold (Table 1).
-
The Mineral Resources are constrained within a conceptual pit shell and reported above a 0.20 g/t Au cut-off grade, using a gold price of US$3,000, recovery and other assumptions summarized in the notes to Table 1, to demonstrate reasonable prospects of eventual economic extraction.
-
Approximately 80% of the contained gold in the 2026 MRE is classified as Measured and Indicated.
-
The updated MRE incorporates revised geological and mineralization modelling, structural interpretation, core re-logging and additional assay information.
-
The MRE incorporates 833 historical diamond drill holes totaling approximately 237,021 metres across the 4.2-kilometre Twin Lakes Shear Zone ("TLSZ").
-
Additional mineralized areas have been identified within, below and beyond the current pit shell for follow-up drilling.
-
SRK has proposed an initial Phase I diamond drilling program of approximately 20 holes totaling 11,150 metres to test the continuity and extent of higher-grade gold domains in the central and eastern portions of the deposit, including areas below and beyond the current conceptual open-pit shell.
-
While tungsten was not included in the 2026 MRE, ONGold's recent re-logging, infill sampling and pulp re-analysis program substantially improved the tungsten database and supports further evaluation of tungsten distribution, geological controls and its association with higher-grade gold mineralization.
Table 1: Mineral Resource Statement for the Monument Bay Project, Manitoba, SRK Consulting (Canada) Inc., effective July 31, 2026*
| Class | Tonnage (kt) | Au (g/t) | Au (koz) | | Measured | 18,859 | 1.00 | 606 | | Indicated | 55,531 | 0.79 | 1,403 | | Measured and Indicated | 74,390 | 0.84 | 2,009 | | Inferred | 24,456 | 0.62 | 491 | | *Notes: (1) Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability. (2) Open-pit Mineral Resources are reported within a conceptual pit shell above a 0.20 g/t Au cut-off grade. The conceptual pit shell and cut-off grade use a gold price of US$3,000 per ounce and a variable gold recovery ranging from 88.5% to 94.5%, based on gold grade. (3) Tonnages and grades have been rounded to reflect the relative accuracy of the estimate; totals may not add due to rounding. (4) The effective date of the MRE is July 31, 2026. | | | |
[](https://images.newsfilecorp.com/files/10770/313830_7cf716cda4bb7a77_001full.jpg)
Figure 1: Map Showing the Location of ONGOLD Projects including the Monument Bay Project, Manitoba
To view an enhanced version of this graphic, please visit: https://images.newsfilecorp.com/files/10770/313830_7cf716cda4bb7a77_001full.jpg
SRK is completing the NI 43-101 technical report supporting the 2026 MRE, which the Company will file under its issuer profile on SEDAR+ within the period prescribed by NI 43-101. ONGold does not consider any pre-existing historical Mineral Resource Estimates as current. The MRE is not directly comparable with historical estimates previously prepared for the Monument Bay Project because it uses different geological interpretations, mineralization domains, estimation and classification methodologies, and economic assumptions. This MRE incorporates ONGold's updated geological and structural interpretation, core re-logging and additional assay information, together with SRK's geological and mineralization models and estimation methodology constrained within a conceptual open-pit shell.
Kyle Stanfield, Chief Executive Officer and a director of ONGold, commented: "The completion of a mineral resource estimate prepared in accordance with NI 43-101 for the Monument Bay gold deposit is a very important milestone for ONGold. With a 2.0-million-ounce gold resource classified as Measured and Indicated representing 80% of the contained ounces, and approximately 0.5 million ounces of gold classified as Inferred Mineral Resources, the 2026 MRE establishes a substantial open-pit-constrained gold resource. The updated geological interpretation has greatly improved our understanding of the structural controls on mineralization and identified priority areas for additional resource drilling as the deposit remains open at depth. We are encouraged by the opportunity to test mineralization at depth particularly along the eastern portion of the deposit where gold grades from historical drilling are demonstrably higher. While the new resource estimate does not include tungsten, the updated gold block model will support a more targeted evaluation of the association between gold and tungsten as part of additional technical studies underway. We are grateful for the continued very strong support from both the local First Nations communities as well as the Government of Manitoba as we continue to advance the Monument Bay gold deposit in 2027 and beyond."
Updated Geological Model
ONGold completed a comprehensive geological reinterpretation of the Monument Bay deposit and SRK developed lithology and mineralization models (Figure 2). The work incorporated a revised geological and structural interpretation, historical drill-hole data, core re-logging and additional assay information.
The new lithological model simplifies the geological coding into the principal intrusive, volcanic, sedimentary and overburden units. The I2 felsic porphyry dyke/sill is a principal geological unit associated with gold mineralization throughout the deposit. Leapfrog Geo©software was used to develop the three-dimensional geological model using available logged geology, including ONGold's re-logging data where available.
Gold Mineralization Model
SRK's gold mineralization model consists of two principal volume components: a number of high-grade mineralization volumes defined using a minimum domain using a grade threshold of 1.0 g/t Au together with geological and structural criteria and a relatively low-grade mineralization grade volume domain defined using a grade threshold of 0.30 g/t Au and (Figure 3).
The high-grade model integrates grade with geological characteristics including silicification, host-rock controls, stockwork, breccia and vein development, and sericitization.
SRK interpreted several structural controls on higher-grade mineralization, including mineralized zones associated with the I2 dyke and I2-volcanic contacts and structures related to D3 deformation and shearing.
-
The low-grade mineralization model recognizes multiple grade populations outside the high-grade zones and is not solely constrained within the I2 felsic intrusive unit. The threshold value was selected based on a statistical evaluation of gold assays outside the high-grade structures and was guided by ONGold's interpretation of re-logged drill sections.
-
The remaining I2 intrusive and volcanic volume outside the modelled high-grade structures and 0.30 g/t grade volume was treated as a separate domain during grade estimation.
[](https://images.newsfilecorp.com/files/10770/313830_7cf716cda4bb7a77_002full.jpg)
Figure 2: Monument Bay Deposit - Updated Lithological Model (SRK, 2026)
To view an enhanced version of this graphic, please visit: https://images.newsfilecorp.com/files/10770/313830_7cf716cda4bb7a77_002full.jpg
[](https://images.newsfilecorp.com/files/10770/313830_7cf716cda4bb7a77_003full.jpg)
Figure 3: Monument Bay Deposit - Gold Mineralization Model (SRK, 2026)
To view an enhanced version of this graphic, please visit: https://images.newsfilecorp.com/files/10770/313830_7cf716cda4bb7a77_003full.jpg
Mineral Resource Estimation and Classification
The exploration database was compiled and maintained by ONGold and was audited by SRK. The geological model, the gold mineralization wireframes, and the MRE were constructed for Monument Bay by SRK from a geological interpretation developed in collaboration with ONGold. The Mineral Resource estimation process included data verification, statistical and geostatistical analysis, variography, grade estimation and classification in accordance with the CIM Definition Standards for Mineral Resources and Mineral Reserves (May 2014).
Mineral Resource estimation was completed in Leapfrog Geo© software. A total of 32 estimation domains were defined based on the mineralization model: the high-grade vein structures (domains 901 to 930), the 0.30 g/t grade volume (domain 100) and rest of the modelled volume outside 0.30 g/t grade volume (domain 200). Assays were composited to a length of 1.0 m while respecting estimation domain boundaries. The composited data was reviewed to identify any potential outliers and assess the need to cap the data. Capping values were applied to some estimation domains: 30 g/t for domain 100, between 8 g/t and 55 g/t for high-grade structures, and 10 g/t for domain 200. Variogram models were generated to evaluate the spatial continuity of gold grades within selected domains. Gold grades were estimated into the block model, with parent block size of 10 x 5x10 meters, using Ordinary Kriging (OK) and Inverse Distance (ID) to the power of three. The general estimation strategy involves up to three estimation passes with progressively relaxed search ellipsoids and data requirements.
Mineral Resource classification criteria included drill-hole spacing, data quality and QA/QC, geological and grade continuity, estimation confidence and the QP's professional judgment. The following drill-hole spacing criteria generally supported, but did not solely determine, classification:
-
Measured: Up to 30 m of drillhole spacing. Areas with confidence in geological model, within modelled I2 intrusive and volcanics, were only considered for Measured class.
-
Indicated: Up to 50 m of drillhole spacing within modelled I2 intrusive and volcanics.
-
Inferred: Up to 100 m of drillhole spacing within modelled I2 intrusive and volcanics.
Reasonable Prospects of Economic Extraction
The gold mineralization in the Monument Bay Project is considered to be primarily amenable to open pit extraction. To determine the quantities of material offering "reasonable prospects for economic extraction" by an open pit, SRK used a pit optimizer and reasonable mining assumptions to evaluate the proportions of the block model that could be "reasonably expected" to be extracted from an open pit.
Tungsten: An Under-Evaluated Critical Mineral Opportunity
Tungsten was not included in the 2026 MRE. ONGold believes tungsten represents an important additional exploration opportunity at Monument Bay because tungsten occurs within the broader hydrothermal system associated with gold mineralization and has historically been under-evaluated across portions of the drill database.
Tungsten occurs primarily as scheelite associated with quartz and quartz-albite veining, fractures and stockwork vein systems and has been observed across multiple host lithologies. Recent geological and assay work indicates that higher-grade tungsten can occur in association with higher-grade gold mineralization domains in portions of the deposit.
ONGold's 2025-2026 re-logging, infill sampling and pulp re-analysis program added approximately 13,900 tungsten assays to the Monument Bay database, materially improving the Company's understanding of tungsten distribution across the approximately 4.2-kilometre deposit. The program was designed primarily to obtain tungsten analyses from historical samples that had previously been assayed for gold but had not been systematically analyzed for tungsten.
Recent results include coincident gold and tungsten mineralization in several of the principal gold-mineralized shoots associated with high-grade gold domains; as illustrated by the examples presented in Table 2.
With the updated gold block model now available, ONGold can conduct a targeted "gap analysis" of higher-grade gold domains to identify historical drill holes with missing tungsten assays. Future work will focus on higher-grade gold-tungsten intercepts and on improving the understanding of the structural controls and distribution of the associated metals. This work, together with additional structural studies of historical and new drill core, is intended to determine whether sufficient continuity can be established to support future tungsten domain modelling and resource evaluation.
Table 2: Examples of New Tungsten Assays from Historical Samples within High-Grade Gold Domains (>1.0 g/t Au)
| Shoot | Hole | Sample No. | From (m) | To (m) | Interval (m) | Au (g/t) | W (ppm) | | Lake | TL-11-377 | 843533 | 222.00 | 223.00 | 1.00 | 2.81 | 744 | | TL-20-714 | A0770622 | 131.90 | 132.45 | 0.55 | 5.14 | 4,590 | | | TL-20-714 | A0770629 | 137.60 | 138.00 | 0.40 | 1.82 | 5,480 | | | TL-20-714 | A0769558 | 143.50 | 144.00 | 0.50 | 1.79 | 560 | | | Camp | TL-20-703 | A0769561 | 144.90 | 145.55 | 0.65 | 22.30 | 2,700 | | TL-20-703 | A0769566 | 147.00 | 147.30 | 0.30 | 9.55 | 4,530 | | | TL-20-703 | A0769570 | 147.80 | 148.30 | 0.50 | 7.09 | 569 | | | TL-20-703 | A0769548 | 136.00 | 136.70 | 0.70 | 1.82 | 1,260 | | | TL-20-703 | A0769559 | 144.00 | 144.45 | 0.45 | 3.02 | 1,050 | | | TL-20-703 | A0769568 | 147.30 | 147.80 | 0.50 | 2.76 | 1,110 | | | TL-20-703 | A0769571 | 148.30 | 148.77 | 0.47 | 4.60 | 3,650 | | | TL-20-703 | A0769572 | 148.77 | 149.07 | 0.30 | 2.83 | 6,350 | | | TL-03-143 | A563508 | 146.80 | 147.40 | 0.60 | 1.78 | 509 | | | TL-03-132 | 318116 | 107.00 | 108.00 | 1.00 | 1.09 | 704 | | | Simmons West | TL-20-708 | A0769946 | 41.56 | 41.88 | 0.32 | 9.09 | 1,800 | | TL-20-708 | A0769948 | 41.88 | 42.42 | 0.54 | 4.09 | 6,270 | | | TL-20-708 | A0769560 | 144.45 | 144.90 | 0.45 | 5.19 | 3,150 | | | TL-11-419 | 1011799 | 89.00 | 90.00 | 1.00 | 2.82 | 1,410 | |
Notes: All reported intervals are downhole core lengths. True widths are unknown at this time and will be refined with additional structural modeling.
Historical metallurgical testing conducted in 2015 by Thibault & Associates Inc. indicated that the Monument Bay gold-tungsten samples tested were amenable to flotation, as summarized in the technical report on the Monument Bay Project dated May 30, 2025 (Barber, 2025). The historical testing was preliminary in nature and may not be representative of mineralization across the deposit.
Tungsten is designated by the Government of Canada as a critical mineral, with applications including defense, advanced manufacturing and other strategic industries.
Potential Resource Expansion or Conversion and Future Exploration
SRK has proposed an initial Phase I diamond drilling program consisting of approximately 20 holes totaling 11,150 metres to test the continuity and extent of higher-grade gold domains in the central and eastern parts of the deposit, including areas below and beyond the current conceptual open-pit shell. Some of the high-grade domains fall outside of the open pit shell and could form the basis of a future pit expansion at depth. ONGold will review this proposed drill program and other drill targets within the deposit to prepare a final drill program to advance the Monument Bay gold deposit.
ONGold generated an updated longitudinal section illustrating the revised geological interpretation of the principal gold-mineralized shoots along the approximately 4.2-kilometre strike length of the deposit (Figure 4). The interpretation identifies areas where historical drilling density is relatively limited and which may warrant additional exploration drilling as depicted on the longitudinal section by red stars, which depict examples of drill targets generated by ONGold, and blue stars, which depict the targeted intercepts of drill holes proposed by SRK.
The section illustrates selected 10-metre drill-hole gold composites projected onto the longitudinal section and the geological framework by ONGold; the line of section (A-B) represents an east-west plane dipping 63 degrees to the north. The figure is intended to illustrate the current geological interpretation and exploration targets and should not be interpreted as representing a Mineral Resource Estimate or predicting the results of future resource estimation.
Principal Exploration Observations
Six principal east-plunging mineralized shoots have been interpreted along the deposit, including the Simmons Shoot West, Simmons Shoot, River Shoot, Camp Shoot, Lake Shoot West and Lake Shoot (Figure 4).
Significant portions of the deposit remain largely untested by drilling below approximately 300 metres vertical depth from surface (Figure 4).
The eastern extension of the deposit remains relatively sparsely tested by historical drilling (Figure 4)
Areas of relatively sparse drilling along strike, down plunge and at depth provide targets for future drilling to further evaluate the continuity and extent of mineralization (Figure 4).
Gold mineralization has been interpreted to extend to surface in portions of the Simmons Shoot, Camp Shoot and Lake Shoot West (Figure 4).
[](https://images.newsfilecorp.com/files/10770/313830_7cf716cda4bb7a77_004full.jpg)
Figure 4: Longitudinal Section with Potential Drill Targets (ONGold, 2026)
To view an enhanced version of this graphic, please visit: https://images.newsfilecorp.com/files/10770/313830_7cf716cda4bb7a77_004full.jpg
Selected Historical Drill Result
In the eastern portion of the deposit, historical drill hole TL16-575 returned 6.15 g/t Au over a core length of 132.0 metres (151.00 to 283.00), including 163.92 g/t Au over 2.75 metres (171.25 to 174.00) as previously disclosed in the Company's news release dated March 2, 2026 (Figure 5). These reported intervals are core lengths and true widths have not been determined. This historical result is one of the drill intersections supporting the geological interpretation of the eastern portion of the deposit. SRK has proposed that approximately half of its recommended initial drilling program be directed to the eastern portion of the deposit, where historical drilling has identified higher-grade gold mineralization. Additional drilling is also being considered by ONGold to further evaluate the continuity and extent of gold mineralization.
[](https://images.newsfilecorp.com/files/10770/313830_7cf716cda4bb7a77_005full.jpg)
Figure 5: Drill Section 506350E - Lake Shoot, Eastern Monument Bay Deposit (ONGold, 2026)
To view an enhanced version of this graphic, please visit: https://images.newsfilecorp.com/files/10770/313830_7cf716cda4bb7a77_005full.jpg
References:
Rodney Barber of ONGold Resources Ltd. and Karen Mathers of Stantec Consulting Ltd. (2025): "Technical Report on the Monument Bay Project, Manitoba", dated May 30, 2025, prepared for ONGold Resources Ltd., published by the Company on its profile on SEDAR+ at www.sedarplus.ca, 118 pages. The technical report also summarizes metallurgical testing conducted by Thibault & Associates Inc. in 2015.
Sampling, QA/QC and Analytical Methods
Quality assurance and quality control ("QA/QC") procedures were implemented to ensure all work is conducted in accordance with best practices. Drill core of various sizes was logged and sampled by Company personnel.
Sample sizes respect both geological and mineralized contacts and generally range from 0.3m to a maximum length of 1.0 m. Drill core is cut in half or, in the case of certain historical core, quartered. One portion is retained for future verification and the sampled portion is placed in a durable plastic sample bag together with a sample tag. Each bag is marked with the applicable sample number. Coarse blanks and OREAS certified reference materials are inserted by the geologist into the sample stream every 10th sample. Each bag is then individually sealed using strong zip ties. Sample batches of ten (10) are placed in security tag-sealed rice bags for shipment to the laboratory. Sample submission forms are completed as a part of the chain-of-custody tracking process with sample dispatched to the laboratory under chain-of-custody with ONGold personnel, sub-contractors or contracted courier services.
Earlier from Newcore Gold Ltd.
More resource estimate releases
- Silver X Files NI 43-101 Technical Report for the Updated Nueva Recuperada Mineral Resource: 10.4 Mt Measured and Indicated at 202 g/t AgEq (67.3 Moz AgEq) and 21.6 Mt Inferred at 260 g/t AgEq (184.3 Moz AgEq) Silver X Mining Corp. (AGX.V),
- OUTCROP SILVER ANNOUNCES FILING OF NI 43-101 TECHNICAL REPORT AND UPDATED MINERAL RESOURCE ESTIMATE FOR THE SANTA ANA PRIMARY SILVER PROJECT Outcrop Silver & Gold Corporation (OCG.TO),
- Eclipse Metals Limited (EPMFF) Quarterly Report - Reports Maiden Ivigtut Resource and Advances Gronnedal Exploration Evolution Petroleum Corporation (EPM),