Spanish Mountain Gold Announces Larger Scale Preliminary Economic Assessment With a Base Case NPV5% After-Tax of C$1.0 Billion, 18.2 % IRR and 3.4 Year Payback at US$ 2,450/Oz Gold Price; at US$3,300/Oz Spot Gold Price NPV5% C$2.3 Billion, 32.0%...
CSE - Canadian National Stock Exchange · Gold · Copper · Cobalt · Nickel · Arsenic · Canada
This press release features multimedia. View the full release here: https://www.businesswire.com/news/home/20250703677435/en/
Figure 5: PEA Mine Production Schedule Summary
Spanish Mountain Gold Announces Larger Scale Preliminary Economic Assessment With a Base Case NPV5% After-Tax of C$1.0 Billion, 18.2 % IRR and 3.4 Year Payback at US$ 2,450/Oz Gold Price; at US$3,300/Oz Spot Gold Price NPV5% C$2.3 Billion, 32.0% IRR and 2.0 Year Payback; Including an Updated Mineral Resource Estimate for Its Spanish Mountain Gold Project
Spanish Mountain Gold Ltd. (“Spanish Mountain” or the “Company”) (TSX-V: SPA; FSE: S3Y; OTCQB: SPAUF) is pleased to announce the results of a Preliminary Economic Assessment (“ PEA ”), including an updated mineral resource estimate (“MRE”), for the Spanish Mountain Gold Project (the “Project”), located within central British Columbia, Canada. The PEA is a conceptual study of the potential economic viability of the Main Deposit Mineral Resource, that includes the Main Zone and North Zone. The PEA will be published in an independent National Instrument (“NI”) 43-101 Technical Report within 45 days of this news release and filed on SEDAR+. Once filed on SEDAR+, the PEA will supersede the Spanish Mountain Gold Project Prefeasibility Study (“NI”) 43-101 Technical Report (PFS) dated May 31, 2021. The PEA study was commissioned by the Company and prepared by a consortium of consultants led by Ausenco Engineering Canada ULC (“ Ausenco ”). The PEA envisions a conventional open pit mining and milling operation with a projected 24.5-year life of mine (“LOM”) producing 3 million ounces (“Moz”) of payable gold, with a front weighted production profile and attractive economics. All currency amounts herein are in Canadian dollars unless otherwise indicated.
President and CEO, Peter Mah stated:
"The re-envisioned, larger scale Spanish Mountain Gold Project and the completion of a new robust, de-risked PEA with updated MRE marks a significant achievement for the Company’s transformation from explorer to developer. With over 235,000 metres (“m”) of drill information our confidence in the resource quality and proposed mine confirm our strategy to advance the Project towards feasibility and ultimately a build decision by 2027. Project upside is supported by drill success in 2024 to 2025 reinforcing the potential for new additional discoveries of high grade near surface gold mineralization in prospective gold host rocks over the 10 km long property wide corridor. With a regional setting of nearby experienced First Nations, communities, currently producing mines, a power interconnection point near William’s Lake, B.C. that is progressing through Stage 2 of B.C. Hydro’s system impact study, established mining infrastructure plus workforce, and year round paved road access to within 6 km of the Project site, the Project’s favourable location and jurisdiction speak volumes to the Project’s overall quality and likelihood to advance to production. Spanish Mountain’s commitment to create BC based jobs, business opportunities, and sustainable shared benefits for the First Nation’s and surrounding communities has been demonstrated during the 2024-25 drill programs. We’ve heard the First Nations’ and communities’ feedback regarding the environment and are pleased to have found a way to address those shared concerns to derisking tailings, waste, and water management. Considering the rising gold price environment supporting the need to rapidly advance gold projects in Canada, and alongside the amazing regional support we’ve received in British Columbia for the Project to date, we look forward to continuing to earn support for our Project, while conserving and improving the economic sustainable value for all stakeholders. Spanish Mountain Gold has a bright future ahead creating a new definition of responsible sustainable mining that generations of Canadians will be proud of!”
Highlights
Robust Economics: Base case after-tax NPV5% of C$1,025 million with an after-tax IRR of 18.2% using a gold price assumption of US$2,450/ounce (“oz”). Using a spot gold price of US$3,300/oz gold, after-tax NPV5% increases to C$2,315 million and the after-tax IRR to 32.0%. Significant Production and Low Cost: 203,265 oz average annual gold production in the first 5 years at an all-in sustaining cost net of by-product credits (“AISC”) of US$1,024/oz and 122,041 oz average annual gold production over a 24.5-year LOM at an AISC of US$1,338/oz. Rapid Payback of Capital Expenditures: C$1,250 million initial capital paid back over 3.4 years at PEA base case and decreasing to 2.0 years at spot gold price of $3,300/oz gold. High Degree of Resource Confidence: Economic analysis is based on Measured and Indicated Resources sub-totalling 33.3% and 65.1% respectively or grand total of 98.4% but excludes potential upside opportunities from the 2025 drill results and MRE from the Phoenix deposit. Low Risk: Conventional open pit and milling operation with road access and hydro-electric power. New Innovative, De-risked Tailings Facility: Dry stack plus coarse free draining tailings, waste and water management facilities that are integrated and significantly reduce volume of tailings impacted runoff for treatment and discharge. The proposed tailings facility includes 100% reuse of process water, avoids discharge near the Cedar Point Provincial Park and minimizes the disturbance of fish bearing waters. The proposed tailings facility utilizes feedback obtained from the First Nations, nearby communities and industry to utilize best in class available environmental solutions that the Company anticipates will significantly reduce risks at closure and promote protection of the land and waterways to perpetuity. Significant Opportunities: Potential to further enhance Project economics and expand production rate have been identified with the addition of the maiden Phoenix deposit MRE, ongoing endowment potential extensions and preconcentration technologies such as mineralized material sorting to boost mill feed grade. Strong Discovery Growth Potential : Exploration diamond drill programs completed in 2024 and 2025 extended gold mineralization and intercepted higher-grade mineralization adjacent to Project infrastructure over a strike length in excess of 3 km.
Table 1: PEA Results Summary
| Open Pit PEA Study Results | 2025 PEA
Base Case | Spot Prices
(as of July 1, 2025) 1 | | After-Tax NPV (C$M, 5% discount rate) | $1,025 | $2,315 | | After-Tax IRR (%) | 18.2% | 32.0% | | Annual Average Free Cash Flow (C$M) 4 | $85 | $173 | | Annual Average Free Cash Flow Yr. 1-5 (C$M) 4 | $311 | $454 | | Initial Capex (C$M) | $1,250 | $1,250 | | Total Cash Cost (US$ / Au oz) 2 | $1,194 | $1,201 | | AISC (US$ / Au oz) 3 | $1,338 | $1,345 | | Payback Period (years) After-Tax | 3.4 | 2.0 | | Nominal Processing Throughput (tpd) | 26,000 | 26,000 | | Strip Ratio (waste:mill feed resource) | 2:1 | 2:1 | | Mine Life (years) | 24.5 | 24.5 | | Annual Average Throughput (Mtpa) | 9,340 | 9,340 | | Annual Average Production (koz/a) | 122 | 122 | | Average Gold Head Grade (g/t) | 0.46 | 0.46 | | Average Gold Recovery (%) | 89.3% | 89.3% | | Metal Prices (US$ / oz) | $2,450 Au
$28.50 Ag | $3,300 Au
$36.00 Ag | | Exchange Rate USD/CAD | 1.35 | 1.35 | | Total LOM Au ounces produced (Moz) | 3.0 | 3.0 | | Total LOM Ag ounces produced (Moz) | 2.1 | 2.1 | | Notes for Table 1 | | | | 1. Spot price is based on the LBMA gold price as of the close of business on July 1, 2025, rounded down to the nearest $100/oz for gold and $1/oz for silver.
2. Cash Costs consist of mining costs, processing costs, mine-level G&A, offsite charges, and royalties less by-product credits. Refer to the “Non-Gaap Financial Measures” section in Appendix B of this news release for more information.
3. All-In Sustaining Costs (AISC) includes cash costs plus sustaining capital, closure costs, and salvage credits. Refer to the “Non-GAAP Financial Measures” section in Appendix B of this news release for more information .
4. Free cash flow is calculated as after tax cash flow from mine-site operating activities less capital expenditures, including closure costs (net of salvage value). Refer to the “Non-GAAP Financial Measures” section in Appendix B of this news release for more information. | | |
The economic analysis contained in this news release is preliminary in nature and is based primarily on Measured and Indicated Mineral Resources totalling 33.3% and 65.1% respectively, and in part, Inferred Mineral Resources totalling 1.6% of the proposed mill feed from the Main deposit. Inferred Mineral Resources are considered too geologically speculative to have the economic considerations applied to them that would enable them to be categorized as Mineral Reserves. There is no certainty that economic forecasts on which this PEA is based will be realized. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. Table 2 lists the breakdown by resource category of the run of mine (“ROM”) mill feed for the PEA life of mine plan.
Table 2: ROM mill feed and ounces by resource category
| Category | ROM Mill Feed (Mt) | ROM Au (Moz.) | ROM Ag (Moz.) | | Measured | 76.2 | 1.22 | 1.62 | | Indicated | 148.9 | 2.10 | 3.09 | | Total M+I | 225.1 | 3.32 | 4.72 | | Inferred | 3.7 | 0.03 | 0.05 |
Mineral Resource Estimate for the Main Deposit
Note: The Main Deposit is included in the financial modelling for the 2025 PEA.
The updated MRE for the Main deposit is based on the amalgamation of what have been historically described as the Main Zone, North Zone, Slipper Zone, and K Zone, effective January 10, 2025, and it is reported at a 0.15 g/t gold cut-off (see Table 3). There is no certainty that Mineral Resources will be converted into Mineral Reserves. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. Mineral Resources include Inferred Mineral Resources which have had insufficient work to classify them as Indicated Mineral Resources. It is uncertain but reasonably expected that Inferred Mineral Resources could be uplifted to Indicated Mineral Resources with additional drilling.
Geological and resource domain modelling and estimation for the Project was completed using Leapfrog 2024.1. The lithological model was developed based on data from the extensive re-logging program of 170,000 m drill core that was completed in 2023 and 2024, in addition to geochemical classification of 56,550 previously sampled intervals. Mineralization domains are modelled by identifying zones with gold values greater than 0.3 g/t over a minimum width of 3 m. Two primary styles of mineralization were recognized. Early mineralization includes disseminated stratabound mineralization in argillite-bearing lithologies. Late mineralization includes gold associated with late-stage quartz veins. Three high-confidence faults were modelled, including the North Fault, South Fault, and Fault 1. The Main Block is bound by the North and South Faults, representing significant discontinuities in stratigraphy and mineralization. Within the Main Block, Fault 1 introduces a minor offset in the main block.
Reasonable prospects for eventual economic extraction were evaluated by performing a pit optimization using the Lerchs-Grossman algorithm with the following parameters: gold price of US$2,400/oz, silver price of US$30/oz, and gold selling costs of C$7/oz for offsite charges, and a 1.5% royalty. Mining costs for mineralized material and waste are C$3.75/t, with incremental mining costs of C$0.03/t. Processing costs are C$12/t for mill processing and include site G&A. Payability for gold is 99.8%, and payability for silver is 90%. Process recovery for gold is 90%, while process recovery for silver is 50%. The exchange rate used is C$0.73 to US$1.
Total Measured and Indicated Mineral Resources for the Main deposit includes 292.1 Mt at an average grade of 0.44 g/t gold and 0.66 g/t silver, for a total of 4.2 M contained ounces of gold and 6.2 M contained ounces of silver. Total Inferred Mineral Resources for the Main deposit includes 14.8 Mt at an average grade of 0.33 g/t gold and 0.95 g/t silver, for a total of 0.2 M ounces of gold and 0.5 M ounces of silver.
Table 3: Mineral Resource for the Main deposit
| Category | Cut-off Grade | Tonnes (kt) | Au Avg. Grade | Au (koz) | Ag Avg. Grade | Ag (koz) | | Measured | 0.15 | 77,370 | 0.53 | 1,321 | 0.68 | 1,701 | | Indicated | 0.15 | 214,702 | 0.41 | 2,842 | 0.65 | 4,463 | | Measured & Indicated | 0.15 | 292,072 | 0.44 | 4,163 | 0.66 | 6,163 | | Inferred | 0.15 | 14,830 | 0.33 | 155 | 0.95 | 454 | | Notes for Table 3: | | | | | | | | 5. The qualified person responsible for the Main deposit MRE, with an effective as of as of January 10, 2025, is Bahram Bahrami, P.Geo of Equity Exploration Consultants Ltd.
6. Mineral Resources are classified in accordance with CIM (2014) definition standards
7. Bulk density assigned on a block per block basis
8 . Mineral Resources are reported using a 0.15 g/t gold cut-off grade
9. Metal price assumptions include US$2,400/oz Au and US$30/oz Ag
10. Metallurgical recoveries assumptions are 90% recovery for gold and 50% for silver.
11. 99.8 payability for gold and 90% for silver
12. Numbers may not add due to rounding
13. Mineral resources are not Mineral reserves and do not have demonstrated economic viability.
14. The qualified persons responsible for this section of the technical report are not aware of any environmental, permitting, legal, title, taxation, socio-economic, marketing, political, or other relevant factors that could materially affect the Mineral Resource estimate other than those disclosed in this news release and in the PEA Technical Report. | | | | | | |
Mineral Resource Estimate for the Phoenix Deposit
Note: The Phoenix Deposit is not included in the financial modelling for the 2025 PEA .
The inaugural MRE for the Phoenix deposit is reported at a 0.20 g/t gold cut-off. Total Indicated Mineral Resources for the Phoenix deposit include 0.05 Mt at an average grade of 0.35 g/t Au, for a total of 0.6 thousand ounces (koz) of contained gold. Inferred Mineral Resources include 25.4 Mt at an average grade of 0.44 g/t Au, for a total of 357 koz of contained gold (see Table 4).
Table 4: Mineral Resources for the Phoenix deposit
| Resource Classification | Cut-off Grade (Au, g/t) | Tonnes (kt) | Gold Grade (Au, g/t) | Contained Gold (Au, koz) | | Indicated | 0.2 | 52 | 0.35 | 0.57 | | Inferred | 0.2 | 25,426 | 0.44 | 357 |
| Notes for Tables 4 and 5: | | 1. The qualified person responsible for the Phoenix deposit MRE, with an effective as of as of June 17, 2025, is Bahram Bahrami, P.Geo of Equity Exploration Consultants Ltd.
2. Mineral Resources are classified in accordance with CIM (2014) definition standards
3. Mineral Resources are reported using a 0.20 g/t gold cut-off grade
4. Metal price assumptions include US$2,400/oz Au
5. Metallurgical recoveries assumptions are 90% recovery for gold
6. 99.8 payability for gold
7. Numbers may not add due to rounding
8. Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability.
9. The qualified persons responsible for this section of the technical report are not aware of any environmental, permitting, legal, title, taxation, socio-economic, marketing, political, or other relevant factors that could materially affect the Mineral Resource estimate other than those disclosed in this news release and in the PEA Technical Report
10. Refer to Appendix C for the estimation methodology |
Geological and resource modelling for the Phoenix deposit was completed using Leapfrog 2024.1 and Micromine Origin & Beyond 2025. The lithological model was developed based solely on geochemical classification, with six principal stratigraphic units identified: Upper Mafic Tuff, Upper Sedimentary Sequence, Lower Mafic Tuff, Intermediate Sedimentary Sequence, Intermediate Tuff, and Lower Sedimentary Sequence. These units generally dip gently to the northeast. A steeply dipping north-south trending fault divides the Phoenix deposit into eastern and western blocks. The eastern block contains the full stratigraphic sequence, while the western block includes only the two lowermost stratigraphic units found in the eastern block.
Gold mineralization was modelled based on downhole structural data measured from oriented drill core. This interpretation includes identifying two principal sets of mineralized structures: flat to gently east-dipping and steeper northeast-dipping orientations. These define three mineralized lenses—two upper, gently dipping zones and a deeper, steeper-dipping zone.
Capping values for the Phoenix deposit were determined using decile analysis and log-scaled probability plots of length-weighted gold assays. Outlier restrictions were applied to lithological domains during the second estimation pass, excluding samples above 0.2 g/t gold where search distances exceeded 30% of the variogram range. No outlier restrictions were applied to mineralized domains. A semi-hard boundary approach was applied to specific lithological contacts reflecting gradational contacts of lithological units. These included the Lower Mineralized Zone (Domain 630) with a distance threshold of 5 m, the Lower Mafic Tuff with 15 m, and the Lower Sedimentary unit with 50 m. This approach was used to reduce artefacts and better represent grade continuity in stratigraphically complex or sparsely drilled areas.
The block model was constructed using a parent block size of 5m x 5m x 5m, with sub-blocks refined down to 1.25 m to accurately honor geological boundaries and minimum mining widths. Grade estimation was conducted using a combination of Ordinary Kriging (OK) and inverse distance cubed (ID3) methods. OK was used for all mineralized domains where variograms could be reliably modelled; ID3 was applied to other domains where variogram stability could not be achieved. Locally varying anisotropy (LVA) was applied within mineralized domains to reflect observed structural controls.
Resource classification followed the CIM Definition Standards (2014) and was guided by geological confidence, data spacing, and estimation support. The current drilling density supports predominantly Inferred classification. These are supported by at least two drill holes within a spacing of ≤155 m. Indicated Mineral Resources are supported by drill hole spacing of ≤70 m with minimum of 3 drill holes used for estimation.
Reasonable prospects for eventual economic extraction were applied by performing a resource pit optimization and applying the following parameters: a gold price of US$2,400/oz, gold selling costs of C$7/oz for offsite charges, a 1.5% royalty, Mining costs of C$3.75/t with incremental costs of C$0.03/t, and combined processing and site G&A costs of C$12/t. Gold payability was assumed to be at 99.8%, with a metallurgical recovery of 90%. The exchange rate used was C$0.73 to US$1.00. No by-product metals were included in the estimate.
For Phoenix, a cutoff grade of 0.20 g/t gold is used due to limited metallurgical data compared to the Main deposit. This higher cut-off accounts for increased geological and metallurgical uncertainty for the Phoenix deposit. Cut-off sensitivities of the Phoenix deposit mineral resource are summarized in Table 5.
Table 5: Mineral Resource for the Phoenix deposit at varying gold cut-off grades
| Resource Classification | Cut-off Grade (Au, g/t) | Tonnes (kt) | Gold Grade (Au, g/t) | Contained Gold (Au, koz) | | Indicated | 0.15 | 96 | 0.27 | 0.8 | | 0.2 | 52 | 0.35 | 0.6 | | | 0.25 | 35 | 0.41 | 0.5 | | | 0.3 | 23 | 0.47 | 0.4 | | | Inferred | 0.15 | 33,451 | 0.37 | 402 | | 0.2 | 25,426 | 0.44 | 357 | | | 0.25 | 20,152 | 0.49 | 319 | | | 0.3 | 16,827 | 0.54 | 290 | |
Notes: See Table 4
Spanish Mountain Project Consolidated Mineral Resources
Total combined Mineral Resources for the Spanish Mountain Gold Project are summarized in Table 6. Total Measured and Indicated mineral resources include 292.1 Mt at 0.44 g/t gold for total 4.16 M contained gold ounces. Total inferred mineral resources include 40.3 Mt at 0.40 g/t gold for total 512 k contained gold ounces.