OreStocks

Ivanhoe Electric Inc. press release

Aya Gold & Silver Provides Year-End 2025 Exploration Update

NYSE - New York Stock Exchange · Copper · Gold · Silver · Zinc · Lead · Nickel · Cobalt · Platinum · Palladium · Vanadium · United States

Aya Gold & Silver Provides Year-End 2025 Exploration Update

MONTREAL, Jan. 21, 2026 (GLOBE NEWSWIRE) -- Aya Gold & Silver Inc. (TSX: AYA; OTCQX: AYASF) (“Aya” or the “Corporation”) provides a full-year 2025 exploration update, summarizing the results of it drilling programs at the Zgounder Silver Mine and the Boumadine Project in the Kingdom of Morocco.

“In 2025, our exploration programs at Zgounder and Boumadine demonstrated our exploration leadership, supported asset growth, produced outstanding intercepts, and underscored the potential to add significant high-grade ounces in the near term,” said Benoit La Salle, President & CEO. “Over 175,000 metres of drilling combined with advanced technology have been central to these results and to identifying new opportunities. With 16 new permits expanding our Moroccan footprint, we remain focused on creating shareholder value through the drill bit and building on this momentum into 2026.”

Highlights

Zgounder Mine Exploration1

Significant mineralization confirmed at depth toward the granite contact, with extension of the open pit and to the west near the fault: Hole DZG-SF-24-228 intercepted 3,794 grams per tonne (“g/t”) silver (“Ag”) over 10.0 metres (“m”).

Hole DZG-SF-24-412 intercepted 3,279 g/t Ag over 8.0 m, including 6,425 g/t Ag over 4.0 m.

Hole ZG-SF-24-259 intercepted 1,082 g/t Ag over 8.5 m, including 2,133 g/t Ag over 2.7 m.

Hole ZG-SF-25-290 intercepted 823 g/t Ag over 10.0 m and 2,055 g/t Ag over 4.5 m.

Hole ZG-RC-24-413 intercepted 1,001 g/t Ag over 28.0 m, including 2,787 g/t Ag over 7.0 m.

Hole ZG-RC-24-452 intercepted 1,364 g/t Ag over 14.0 m, including 2,433 g/t Ag over 6.0 m.

Completed 28,495 m of drilling at Zgounder near-mine and regionally exceeding full-year target of 20,000–25,000 m.

Six (6) exploration permits added expanding the Zgounder exploration footprint to 378.8 square kilometres (“km2”).

Net Reserve and Resource Growth – December 2025 update2: P&P Reserves: 73 Moz Ag at 145 g/t (15.7 million tonnes (“Mt”)), a 4% increase in silver ounces (“oz”) from the prior estimate, net of depletion, with reserves estimated using a silver price assumption of $26/oz.

Measure & Indicated Resources (“M&I Resources”)2: 100 Moz Ag at 165 g/t Ag (18.9 Mt), a 5% increase in total Ag ounces from the prior estimate, net of depletion.

Boumadine Exploration1,3,4

Significant mineralized intercepts in the Boumadine Main Trend: BOU-MP25-087 intercepted 2,323 g/t silver equivalent (“AgEq”) over 15.0 m (3.31 g/t Au, 1,900 g/t Ag, 4.8% zinc (“Zn”), 1.8% lead (“Pb”) and 0.03% copper (“Cu”)), including 3,858 g/t AgEq over 8.7 m (5.37 g/t Au, 3,208 g/t Ag, 6.3% Zn, 2.8% Pb and 0.05% Cu).

BOU-RC25-026 intercepted 3,336 g/t AgEq over 6.0 m (37.03 g/t Au, 334 g/t Ag, 2.8% Zn, 1.0% Pb and 0.2% Cu), including 8,163 g/t AgEq over 2.0 m (102.38 g/t Au, 94 g/t Ag, 2.4% Zn, 1.0% Pb and 0.1% Cu).

Extension of Tizi Zone to 2.2 km with intersection such as: BOU-DD25-550 intercepted 272 g/t AgEq over 4.6 m (1.33 g/t Au, 101 g/t Ag, 1.6% Zn, 1.1% Pb and 0.03% Cu).

Updated Mineral Resources Estimate (“MRE”) 2,3 – February 2025: Indicated Mineral Resource: 5.2 Mt at 91 g/t Ag, 2.78 g/t Au, 2.8% Zn and 0.85% Pb containing an estimated 15.1 Moz of Ag, 449 thousand ounces (“koz”) of Au, 145 thousand tonnes (“kt”) of Zn and 44 kt of Pb, an increase of 19% from the prior estimate.

Inferred Mineral Resource: 29.2 Mt containing an estimated 76.8 Moz of Ag, 2.4 Moz of Au, 615 kt of Zn and 237 kt of Pb.

Upside Potential: The updated MRE was effective February 24, 2025 and does not include most of the 2025 drilling campaign, highlighting potential for additional resources.

10 exploration permits added, expanding the Boumadine exploration footprint to 340.7 km2.

Completion of 569 drillholes totalling 150,325 m within the Boumadine main trend and other targets.

1. All intersections are in core lengths.

2. Mineral Reserves as of September 30, 2025 were estimated using a silver price assumption of $26/oz. Mineral Resources are inclusive of Mineral Reserves. The Mineral Resource Estimate for Zgounder is effective June 30, 2025 and was estimated using a silver price assumption of $28/oz. See Aya’s December 16, 2025 press release for additional information.

3. Ag equivalent is based on a silver price of US$24/oz with a process recovery of 89%, a gold price of US$2,200/oz with a process recovery of 85%, a zinc price of US$1.20/lb with a process recovery of 72%, a lead price of US$1.00/lb with a process recovery of 85%, and a copper price of US$4.00/lb with a process recovery of 75% resulting in the following ratios: 1g/t Au: 77.9 g/t Ag; 1% Cu: 85.4 g/t Ag; 1% Pb: 24.2 g/t Ag; and 1% Zn: 24.6 g/t Ag.

4. As at February 24, 2025. Mineral Resources that are considered too speculative geologically to have economic considerations applied to them that would enable them to be categorized as mineral reserves, and there is no certainty that the PEA will be realized.

Summary of 2025 Exploration Results

Zgounder Exploration

The Zgounder Mine is an Ag mineralization sediment hosted deposit, currently interpreted as epithermal, underground and open pit mine in the central Anti-Atlas Mountains of Morocco. Best intercepts for 2025 are shown in Table 1.

For the period of January to December 2025, a total of 23,866 m was completed on the deposit. (Figure 1).

Infill drilling, underground and surface, on the high-grade mineralization at the main orebody confirmed the mineralization and extended underground production zones. Results include: DZG-SF-24-228 with 3,794 g/t Ag over 10.0 m, DZG-SF-25-422 with 5,297 g/t Ag over 4.0 m, and DZG-SF-25-412 with 3,279 g/t Ag over 8.0 m with 6,425 g/t Ag over 4.0 m.

Silver mineralization near the granite contact was confirmed and extended 250 m along strike in the west-extension and up to 400 m vertical depth with results including: ZG-SF-25-290 with 823 g/t Ag over 10.0m and 2,055 g/t Ag over 4.5 m, and ZG-SF-24-209 with 1,756 g/t Ag over 4.5m including 6,800 g/t Ag over 1.0 m.

The open pit area is a key contributor to production, reverse circulation (“RC”) drilling on the area, at east of the deposit confirmed the continuity of the mineralization at south and at north. Results include ZG-RC-24-413 with 1,001 g/t Ag over 28.0 m including 2,787 g/t Ag over 7.0 m, and ZG-RC-24-452 with 1,364 g/t Ag over 14.0 m, including 2,433 g/t Ag over 6.0 m.

Table 1 – Best Intercepts at Zgounder in 2025 (core lengths)

DDH No.FromToAgLength*Ag x width

(m)(m)(g/t)(m)

Surface DDH

ZG-24-12826.032.09606.05 760

Underground DDH

ZG-SF-24-203176.0186.091110.09 106

Including180.5182.04 8551.57 282

ZG-SF-24-209299.0303.51 7564.57 900

Including300.0301.06 8001.06 800

ZG-SF-24-21965.070.01 1475.05 734

Including65.067.52 1742.55 434

ZG-SF-24-25966.074.51 0828.59 197

Including67.570.22 1332.75 760

ZG-SF-25-290275.0285.082310.08 228

ZG-SF-25-290297.5302.02 0554.59 246

DZG-SF-24-2286.016.03 79410.037 940

DZG-SF-24-32552.058.01 1136.06 675

DZG-SF-24-35346.559.557213.07 430

ZG-SF-24-123276.5289.11 64012.620 660

Including278.0279.010 1041.010 104

Including277.5284.52 7477.019 230

DZG-SF-25-40923.026.03 0423.09 125

Including23.525.54 4562.08 913

DZG-SF-25-41256.564.53 2798.026 231

Including56.560.56 4254.025 700

DZG-SF-25-42248.052.05 2974.021 188

DZG-SF-25-46535.536.57 2201.07 220

DZG-SF-25-55735.740.01 5344.36 597

DZG-SF-25-7153.87.01 9723.26 311

Surface RC

ZG-RC-24-1550.013.075513.09 812

ZG-RC-24-1690.017.048417.08 220

ZG-RC-24-2320.011.01 05411.011 596

Including0.05.02 0635.010 316

ZG-RC-24-35419.031.066412.07 969

Including22.025.01 7933.05 380

ZG-RC-24-39963.070.01 2987.09 085

Including64.068.02 0814.08 324

ZG-RC-24-40117.020.03 5653.010 696

ZG-RC-24-41310.038.01 00128.028 026

Including26.033.02 7877.019 512

ZG-RC-24-42442.044.03 7332.07 466

ZG-RC-24-45239.053.01 36414.019 100

Including45.051.02 4336.014 596

ZG-RC-24-4710.07.08267.05 780

ZG-RC-24-4910.015.053815.08 068

Including4.010.09496.05 692

ZG-RC-25-41227.037.074510.07 452

ZG-RC-25-44911.015.01 3474.05 388

ZG-RC-24-5930.06.01 1236.06 740

ZG-RC-24-30322.028.01 9706.011 820

ZG-RC-25-46211.022.050211.05 527

ZG-RC-25-4783.018.067715.010 155

Including3.06.02 1383.06 415

Underground T28

T28-24-5257.212.01 3974.86 706

T28-25-6281.28.48457.26 080

T28-25-66614.425.266410.87 169

Including14.419.21 3444.86 450

T28-25-67112.025.275113.29 910

Including18.024.01 2446.07 464

T28-25-7393.616.852513.26 928

T28-25-81613.219.21 3056.07 828

T28-25-8947.213.21 3396.08 035

T28-25-8998.414.48856.05 312

T28-25-9048.415.61 6317.211 744

Including8.412.03 1003.611 160

T28-25-94220.426.41 9476.011 682

Including21.626.42 3594.811 324

T28-25-94612.021.65619.65 383

T28-25-9619.612.02 4652.45 916

Underground YAK

YAK-24-1431.221.638220.47 784

YAK-24-14413.225.252012.06 238

YAK-24-1523.69.61 5326.09 192

YAK-25-3328.410.82 3802.45 712

YAK-25-38410.824.040013.25 275

YAK-25-38521.628.88857.26 372

YAK-25-3869.615.62 0216.012 127

Including13.215.64 8802.411 712

* True width remains undetermined at this stage; all values are uncut.

Figure 1: Location of Drill Hole at Zgounder

Zgounder Regional Exploration

Regional exploration drilling was conducted on four targets including one near-mine 500 m north of the Zgounder deposit with a total of 4,415 m drilled.

Zgounder North Target: Drilling targeted a rhyolite-sediment contact mapped on surface north of the Zgounder deposit. Drilling intersected the rhyolite up to 200 m depth; assay results are still pending for this area.

Ait Nebdas East and Ait Nebdas West: Drilling targeted NS mineralization trend hosted into a diorite porphyry intrusion. The surface Ag-Cu mineralization was identified by rock samples. Drill holes intercepted anomalous Ag intervals with lower grades than the ones in surface.

Tachakchte: Drilling targeted an ENE contact between a felsic intrusion and a volcanic unit aiming Ag-Cu anomalies shown by rock surface sampling. Assay results do not show continuity of mineralization at depth.

Iriri: Drilling targeted a N10 alteration corridor hosted in Proterozoic intermediate volcanic rocks. The alteration bears Au anomalies identified by surface rock sampling. Drill holes were realized in 2 phases; a RC campaign and a follow up DDH to better understand the continuity of the mineralization at depth. Assays results received by the end of 2025 intercepted anomalous Au intersections. Further follow up is planned for 2026.

Additional work includes:

Geological mapping and prospecting, focusing on the Zgounder Far East, Touchkal and Zgounder Nord properties, the last acquired in 2025.

A stream sediment campaign on Zgounder Nord, and follow-up on previous stream sediment results from Touchkal property.

Geochemical campaign on outcrop samples over Zgounder deposit and Zgounder regional, coupled with core-samples from the deposit to better characterize alteration halo and compositions of intrusive units.

Execution of a ground-geophysical survey (IP and MT) over the eastern Zgounder permit targeting the Zgounder sedimentary sequence underneath the Proterozoic sedimentary cover.

Completion of a machine learning–based geoanalytics analysis across the Zgounder deposit and regional exploration permits within a 30 km radius of the deposit. Targets generated from the study will be followed up in 2026 (Figure 4).

Calibration of previously acquired World-View 3 hyperspectral imagery using samples collected from the concerned areas.

Acquisition of 6 exploration permits (Zgounder Nord), expanding the Zgounder exploration footprint to 378.8 km2.

Figure 2: Location of Drill Hole at Zgounder Surface

Figure 3: Location of Drill Holes at Zgounder Regional Exploration

Figure 4: AI Generated Near-Mine Targets

Boumadine Exploration

Boumadine contains a large polymetallic deposit (Ag, Au, Pb, Zn) located in the Anti-Atlas Mountains, 80km south-west of the city of Errachidia. The main mineralization generally consists of 1m to 4m wide (locally reaching over a 10m width) N340- oriented massive sulphide lenses/veins sharply dipping eastward (> 70°). The massive sulphide veins (>80%) are mainly composed of pyrite, with variable proportions of arsenopyrite, sphalerite, galena, and chalcopyrite. The Tizi and Imarriren zones share the same characteristics as the main mineralization except for their N000 orientation. Best intercepts for 2025 are shown in Table 2.

The updated estimated mineral resources, as published on March 31, 2025, contain: An indicated Mineral Resource of 5.2Mt at 91 g/t Ag, 2.78 g/t Au, 2.8% Zn and 0.85% Pb containing an estimated 15.1Moz of Ag, 449koz of Au, 145kt of Zn and 44kt of Pb, an increase of 19%, and;

An inferred Mineral Resource of 29.2Mt at 82 g/t Ag, 2.63 g/t Au, 2.11% Zn and 0.82% Pb containing an estimated 76.8Moz of Ag, 2.4Moz of Au, 615kt of Zn and 237kt of Pb, an increase of 120%.

In 2025, A total of 569 drillholes totaling 150 325 m were completed on the Boumadine project and satellite prospects 273 drillholes totaling 119,887 m were drilled on the deposit (Figure 5).

136 drillholes totaling 29,765 m were drilled on different regional exploration targets (Figure 6).

160 definition drillholes totaling 674 m were drilled on the two existing tailings.

Best mineralized intercept to date: BOU-MP25-087 intercepted 2,323 g/t AgEq over 15.0 m (3.31 g/t Au, 1,900 g/t Ag, 4.8% Zn, 1.8% Pb and 0.03% Cu), including 3,858 g/t AgEq over 8.7 m (5.37 g/t Au, 3,208 g/t Ag, 6.3% Zn, 2.8% Pb and 0.05% Cu).

Polymetallic mineralization of the Tizi zone was extended to 2.2km in length. BOU-DD25-547 intercepted 248 g/t AgEq over 9.0 m (0.42 g/t Au, 80 g/t Ag, 3.6% Zn, 1.8% Pb and 0.04% Cu); BOU-DD24-540 intercepted 480 g/t AgEq over 2.0 m (3.27 g/t Au, 53 g/t Ag, 1.1% Zn, 5.2% Pb and 0.2% Cu).

Increasing Imarriren strike length to 1.2 km. BOU-DD25-503 intercepted 876 g/t AgEq over 1.0 m (9.92 g/t Au, 49 g/t Ag, 1.6% Zn, 0.2% Pb and 0.1% Cu); BOU-DD25-529 intercepted 365 g/t AgEq over 2.0 m (3.66 g/t Au, 52 g/t Ag, 0.5% Zn, 0.5% Pb and 0.1% Cu).

New high-grade parallel structure with a long, continuous mineralized interval: BOU-DD25-623 intercepted 540 g/t AgEq over 47.3 m (0.94 g/t Au, 399 g/t Ag, 1.4% Zn, 1.2% Pb and 0.03% Cu), including 681 g/t AgEq over 10.6 m (1.84 g/t Au, 489 g/t Ag, 1.3% Zn, 0.6% Pb and 0.04% Cu) and 1,286 g/t AgEq over 11.7 m (1.55 g/t Au, 1,002 g/t Ag, 3.0% Zn, 3.5% Pb and 0.1% Cu).

Discovery of New Asirem Gold Zone: BOU-DD25-629 intercepted 1.52 g/t Au over 4.3 m, 1.49 g/t Au over 1.0 m and 1.95 g/t over 1.0 m; BOU-DD25-632 intercepted 4.53 g/t Au over 1.0 m, 2.05 g/t Au over 1.0 m, 1.82 g/t Au over 1.0 m, 1.47 g/t Au over 1.0 m and 0.98 g/t Au over 2.0 m.

10 additional exploration permits and a 600 km2 Exploration Authorization, expanding the Boumadine exploration footprint to 340.74km2. (Figure 7).

Completion of a satellite mapping and spectral study on Boumadine using WorldView-3 data over 1,500km2. Identification of numerous clay alteration halos similar to Boumadine.

Over 22,000 assays are still pending at Boumadine.

Table 2 – Best Intercepts at Boumadine in 2025 (core lengths)

DDH No.

FromToAuAgLength*CuPbZnAg Eq**AgEq *m

(m)(m)(g/t)(g/t)(m)(%)(%)(%)(g/t)

BOU-DD24-387378.3381.00.372972.70.03.73.24971 343

BOU-DD24-392465.0466.71.501 1231.70.15.36.91 5512 637

BOU-DD24-399195.0196.019.2441.00.00.00.01 5061 506

BOU-DD24-413190.4191.416.7211.00.00.00.01 3051 305

BOU-DD24-43666.673.41.21896.80.00.51.32301 561

BOU-DD24-43692.0101.30.51509.30.11.74.42522 342

BOU-DD24-43791.3100.00.52878.70.02.03.72762 398

BOU-DD24-440135.3152.11.399816.80.01.83.23345 606

Including148.0152.12.931574.10.00.82.64761 951

BOU-DD24-440163.6181.40.557417.80.11.55.32935 220

Including172.3176.41.311754.10.13.810.96492 662

BOU-DD24-45094.8105.43.763510.60.20.10.13493 703

Including94.8101.45.57516.60.30.10.15123 378

BOU-DD24-450163.3172.41.43489.10.10.71.42181 981

Including163.3168.12.38414.80.10.61.22831 358

BOU-MP24-015475.0476.60.057741.60.10.10.17881 261

BOU-DD24-387378.3381.00.372972.70.03.73.24971 343

BOU-DD24-442173.7178.30.20734.60.11.34.92481 141

BOU-DD24-453164.4169.62.68385.20.20.20.72841 476

Including164.4168.13.44453.70.20.10.23411 263

BOU-DD24-472125.8128.73.78292.90.10.71.83941 143

BOU-DD24-473282.7288.11.48545.40.11.11.72431 314

BOU-DD24-47448.052.02.38374.00.00.62.53021 208

BOU-DD24-475405.4407.15.622571.70.40.33.58201 394

BOU-DD24-478459.4462.74.61753.30.10.10.54601 517

BOU-DD24-487483.1486.53.362253.40.10.10.05021 707

BOU-MP24-015475.0476.60.057741.60.10.10.17881 261

BOU-DD25-497184.6190.81.93186.20.10.10.92011 244

BOU-DD25-50193.099.01.73486.00.10.20.52101 261

BOU-DD25-504141.0147.63.69466.60.00.20.33492 307

Including141.0142.210.34371.20.00.10.18511 022

BOU-DD25-506297.3302.33.19485.00.10.10.13121 559

BOU-DD25-509282.1291.42.18629.30.10.71.52962 754

Including289.8291.47.162151.60.50.23.28971 436

BOU-DD25-511311.1316.01.952704.90.10.10.64492 201

BOU-DD25-512338.0339.015.8611.00.00.10.31 2471 247

BOU-DD25-513365.3367.15.191181.80.50.21.05911 063

BOU-DD25-513374.8377.75.521092.90.30.25.26982 025

BOU-DD25-516648.5649.066.661110.50.11.01.65 3732 687

BOU-DD25-547117.0126.00.42809.00.01.83.62482 233

BOU-MP25-026238.5243.20.58364.70.11.37.22961 392

BOU-MP25-028392.1396.43.27194.30.10.10.32861 232

BOU-DD25-500537.0543.62.41506.60.10.20.12551 682

Including540.1543.63.11603.50.10.20.13211 123

BOU-DD25-55054.959.51.331014.60.01.11.62721 253

BOU-DD25-569544.0546.00.036902.00.00.60.17101 420

BOU-DD25-572351.8364.02.602312.20.10.10.02322 835

Including352.6354.85.28492.20.10.10.14731 042

Including359.3361.76.29482.40.10.10.05511 323

BOU-DD25-572381.6388.12.66216.50.00.20.42461 599

Including383.0385.06.49252.00.00.20.25441 089

BOU-DD25-572573.0574.89.77651.80.20.72.89291 673

BOU-DD25-584325.7334.74.04419.00.10.10.13693 325

Including327.0331.25.98514.20.20.10.15352 248

BOU-DD25-589341.0351.22.902910.20.10.10.12712 763

Including345.4348.07.46712.60.40.10.16921 799

BOU-DD25-602280.2286.22.22306.00.10.20.72361 414

BOU-DD25-606274.4276.47.71652.00.30.10.17001 399

BOU-DD25-608384.5386.55.212442.00.20.70.77041 408

BOU-DD25-613170.0173.19.82513.10.20.11.28622 672

Including170.0171.223.66821.20.30.11.21 9832 379

BOU-DD25-623182.9230.20.9439947.30.01.21.454025 539

Including189.0199.61.8448910.60.00.61.36817 223

Including216.5228.21.551 00211.70.13.53.01 28615 041

BOU-DD25-633275.8282.00.552936.20.04.32.14983 090

BOU-DD25-633314.3319.01.45694.70.10.85.33391 595

BOU-MP25-08183.090.00.602577.00.14.14.05063 541

BOU-MP25-081183.0185.01.732402.00.03.25.16021 204

BOU-MP25-081196.0201.00.553495.00.11.62.34992 494

BOU-MP25-087112.0117.00.692095.00.02.03.23961 978

BOU-MP25-087138.4153.43.311 90015.00.01.84.82 32334 850

Including142.0150.75.373 2088.70.02.86.33 85833 564

BOU-MP25-087160.0164.81.183114.80.04.04.46142 947

BOU-MP25-088539.5543.51.24574.00.10.53.62611 044

BOU-MP25-092320.0322.30.783612.30.03.13.66101 403

BOU-RC25-02650.056.037.033346.00.21.02.83 33620 019

Including50.052.0102.38942.00.11.02.48 16316 325

BOU-RC25-027133.0137.02.10944.00.21.05.34321 726

BOU-RC25-043152.0161.02.69459.00.10.10.12682 414

Including154.0159.04.44675.00.20.10.14322 158

* True width remains undetermined at this stage; all values are uncut.

** Ag equivalent is based on a silver price of US$24/oz with a process recovery of 89%, a gold price of US$2,200/oz with a process recovery of 85%, a zinc price of US$1.20/lb with a process recovery of 72%, a lead price of US$1.00/lb with a process recovery of 85%, and a copper price of US$4.00/lb with a process recovery of 75% resulting in the following ratios: 1g/t Au: 77.9 g/t Ag; 1% Cu: 85.4 g/t Ag; 1% Pb: 24.2 g/t Ag; and 1% Zn: 24.6 g/t Ag.

Figure 5: Location of Drill Holes at Boumadine

Figure 6: Location of Drill Holes at Boumadine regional exploration

Figure 7: Location of New Permits at Boumadine

Technical Information

Aya has implemented a quality control program to comply with best practices in sampling and analysis of drill core and RC chips. For core drilling, all individual samples represent approximately one metre in length of core, which is halved. Half of the core is kept on site for reference, and its counterpart is sent for preparation and assaying to African Laboratory for Mining and Environment (“Afrilab”) in Marrakech, Morocco. For drilling using RC, all individual samples represent 1.0m in length and a representative portion is kept for every metre in some chip trays stored on site. A split samples representing 1/16th, ranging from 2 to 4 kilogram is sent for preparation and assaying to African Laboratory for Mining and Environment (“Afrilab”) in Marrakech, Morocco.

Earlier from Ivanhoe Electric Inc.