i-80 Gold Corp. press release
K92 Mining Announces Major Regional Exploration Update: Significant Expansion of Arakompa Deposit, Discovery of Porphyry-Style Mineralization from Arakompa Southernmost Step-Out, and Substantial 3.5 km by 3.5 km New Mineralized System Discovered at Wera
TSX - Toronto Stock Exchange · Gold · Silver · United States
VANCOUVER, British Columbia, Sept. 11, 2025 (GLOBE NEWSWIRE) -- K92 Mining Inc . (“ K92 ” or the “ Company ”) (TSX : KNT; OTCQX : KNTNF) is pleased to announce its fifth set of drilling results consisting of 24 holes for total results of 67 holes released to date from its maiden surface diamond drill program at Arakompa, located approximately 4.5 km from the Kainantu Gold Mine Process Plant in Papua New Guinea. Additionally, K92 is pleased to report initial results from its maiden greenfields exploration program at the Wera prospect, outlining a large 3.5 km by 3.5 km mineralized system located approximately 10 km South-West of the Kora and Judd deposits.
Drillhole KARDD0065, stepping out approximately 250 metres to the south from the latest results at Arakompa, has discovered significant porphyry-style mineralization recording 690.4 metres at 0.30% Copper Equivalent (“CuEq”) ( 2 ) (0.17 g/t Au, 0.17% Cu, 2 g/t Ag) starting at 297.0 metres, including 395.3 metres at 0.38% CuEq (0.24 g/t Au, 0.20% Cu, 2 g/t Ag) starting at 349.7 metres. The hole was designed with two objectives: (i) to test the strike extension at Arakompa; and (ii) to be the first hole drilled to test a 600 metre by 600 metre copper-in-soil anomaly. Intersected mineralization occurred as disseminated sulphides, with vein-hosted and vein-controlled sulphide mineralization present. The sulphide mineralization is dominantly chalcopyrite, with minor bornite and molybdenite also observed. Porphyry-style B, D, and M-type quartz sulphide veins are also present. The intersection is interpreted to be distal to a porphyry potassic core, bottomed in mineralization, and represents a very significant vector for follow-up drilling, which is underway.
Significant extension of the Arakompa bulk tonnage zone strike extent to the north and the south, with the bulk zone now defined over approximately 1,100 metres and to a vertical depth of 800 metres, increasing 200 metres strike and 150 metres depth from the _February 20, 2025 _press release, respectively. Drill results to date have recorded an average true thickness of 39 metres, highlighting strong, near-surface bulk mining potential (see Figure 5 – Arakompa Bulk Interpretation Long Section) . The interpreted bulk zone consists of a thick, intensely altered mineralized halo surrounding the high-grade vein lodes and it remains open in multiple directions.
Latest drilling highlights include:
KARDD0061: 96.10 m at 2.64 g/t AuEq (2.48 g/t Au, 4 g/t Ag, 0.07% Cu) KARDD0046: 62.20 m at 1.08 g/t AuEq (0.87 g/t Au, 5 g/t Ag, 0.10% Cu) KARDD0067: 48.30 m at 1.34 g/t AuEq (0.80 g/t Au, 5 g/t Ag, 0.30% Cu) KARDD0052: 75.40 m at 1.04 g/t AuEq (0.58 g/t Au, 5 g/t Ag, 0.25% Cu) KARDD0041: 32.50 m at 1.73 g/t AuEq (1.06 g/t Au, 43 g/t Ag, 0.11% Cu) KARDD0056 (~100 m northern step-out along strike): 72.10 m at 1.00 g/t AuEq (0.80 g/t Au, 10 g/t Ag, 0.05% Cu) KARDD0065 (~250 m southern step-out along strike): 49.20 m at 1.15 g/t AuEq (0.82 g/t Au, 4 g/t Ag, 0.18% Cu)
The latest drilling results have enabled the reinterpretation of multiple historic drill holes, enhancing our confidence in the continuity of the bulk zone. Reinterpreted historic bulk intercepts include: 004AD92: 55.50 m at 2.57 g/t AuEq (2.43 g/t Au, 3 g/t Ag, 0.07% Cu) 016AD92: 37.20 m at 3.56 g/t AuEq (3.00 g/t Au, 9 g/t Ag, 0.29% Cu) 010AD92: 38.00 m at 2.83 g/t AuEq (2.66 g/t Au, 3 g/t Ag, 0.08% Cu) 014AD92: 36.00 m at 2.76 g/t AuEq (2.61 g/t Au, 7 g/t Ag, 0.04% Cu) 005AD92: 41.90 m at 2.20 g/t AuEq (2.12 g/t Au, 2 g/t Ag, 0.04% Cu) 013AD92: 24.00 m at 3.65 g/t AuEq (3.53 g/t Au, 3 g/t Ag, 0.06% Cu) 001AD92: 36.80 m at 2.38 g/t AuEq (2.31 g/t Au, 2 g/t Ag, 0.03% Cu)
Significant expansion of potential high-grade thick zone by ~100 metres vertical (see Figure 2 Long Section), with the latest intercept recording: KARDD0061: 7.06 m at 27.92 g/t AuEq (27.48 g/t Au, 18 g/t Ag, 0.15% Cu), including 2.60 m at 65.50 g/t AuEq (64.60 g/t Au, 42 g/t Ag, 0.27% Cu) When combined with the three intersections previously reported and shown below, the zone has a substantial average true thickness of 7.3 metres with a vertical extent of 200 metres. Intersections from previous releases include: KARDD0038: 14.50 m at 17.33 g/t AuEq (17.17 g/t Au, 4 g/t Ag, 0.07% Cu), including 6.90 m at 34.99 g/t AuEq (34.73 g/t Au, 7 g/t Ag, 0.11% Cu) KARDD0029: 20.60 m at 9.87 g/t AuEq (8.90 g/t Au, 29 g/t Ag, 0.38% Cu), including 10.70 m at 14.97 g/t AuEq (13.81 g/t Au, 25 g/t Ag, 0.53% Cu) KARDD0025: 12.00 m at 11.16 g/t AuEq (10.49 g/t Au, 11 g/t Ag, 0.33% Cu)
Multiple other high-grade intersections recorded at both the AR1 Vein and AR2 Vein, including: AR1 Vein: KARDD0041: 8.00 m at 5.65 g/t AuEq (3.28 g/t Au, 170 g/t Ag, 0.25% Cu) KARDD0052: 2.20 m at 8.12 g/t AuEq (4.71 g/t Au, 51 g/t Ag, 1.81% Cu) within 6.60 m at 3.66 g/t AuEq (2.31 g/t Au, 19 g/t Ag, 0.72% Cu)
AR2 Vein: KARDD0048: 1.60 m at 11.24 g/t AuEq (11.15 g/t Au, 2 g/t Ag, 0.04% Cu) KARDD0054: 1.20 m at 10.21 g/t AuEq (9.85 g/t Au, 8 g/t Ag, 0.17% Cu) within 6.40 m at 2.42 g/t AuEq (2.21 g/t Au, 4 g/t Ag, 0.10% Cu)
KARDD0056: 7.70 m at 6.02 g/t AuEq (5.25 g/t Au, 61 g/t Ag, 0.04% Cu), including 1.50 m at 24.90 g/t AuEq (22.29 g/t Au, 224 g/t Ag, 0.01% Cu)
Maiden greenfields exploration program initially focused on rock chips and trenching at Wera has defined a large ~3.5 kilometre by ~3.5 kilometre low-sulphidation epithermal gold system located approximately 10 km south-west of the Kora and Judd deposits, with several interpreted mineralized structures and high-grade rock chip samples including 26.30 g/t Au, 25.06 g/t Au, 23.97 g/t Au, 22.06 g/t Au, 19.69 g/t Au, 19.23 g/t Au, 18.40 g/t Au, 18.40 g/t Au, 18.03 g/t Au, 16.05 g/t Au, 13.83 g/t Au, 11.09 g/t Au, 10.88 g/t Au, and 10.21 g/t Au (See Figure 8 Wera Plan Map). Importantly, this area was not accessed or tested by previous owners and lies within the major NNE regional mineralized structural corridor that hosts the Kora, Judd and Arakompa deposits. Drilling is now underway.
Notes:
(1) Drill highlights presented above are core lengths (not true widths). (2) Gold equivalent (AuEq) and Copper Equivalent (CuEq) exploration results are calculated using longer-term commodity prices with a copper price of US$4.50/lb, a silver price of US$27.5/oz and a gold price of US$2,000/oz. For AuEq, the following recoveries were applied in-line with the Updated Definitive Feasibility Study: Au – 92.6%, Cu – 94.0%, and; Ag – 78.0%. For CuEq, Metallurgical recoveries and net smelter returns are not considered.
John Lewins, K92 Chief Executive Officer and Director, stated, “We are extremely pleased with the progress achieved through our latest regional exploration results, delivering multiple high-grade intersections at Arakompa, significantly expanding the bulk zone, and on the first deep drill hole discovering a potential porphyry within a 600 m x 600 m copper-in-soils anomaly. The large 3.5 km x 3.5 km mineralized system discovered from our maiden greenfields fieldwork at Wera has also created yet another sizeable target-rich area to explore, and it’s only 10 km from Kora.
These new discoveries align well with the arrival of two new surface diamond drill rigs scheduled for late-Q4/early-Q1 2026 delivery. The additional drilling capacity will support our strategy to significantly ramp up exploration over the next two years and potentially beyond. A second hole targeting the potential porphyry is now underway, and in addition, a contractor rig has been brought in to expand our fleet and has already commenced drilling at Wera. We look forward to providing updates in due course.”
Robert Smillie, K92 Vice President of Exploration, stated, “ We are very excited by the continued exploration success at Arakompa as we advance towards a maiden mineral resource. Drilling so far has only tested just over half of the +2 km strike length of the Arakompa corridor and we are very encouraged by the porphyry potential to the south from the latest drill results from hole KARDD0065. Follow-up drilling to the south of KARDD0065 is underway, which is designed to vector towards a potential higher grade potassic core of the system.
_Furthermore, we are beginning to drill test the large newly discovered mineralized vein system identified at Wera following the high-grade rock chip and trench samples, which is open along strike in both directions. We are excited by the potential of this new greenfields discovery by the K92 Exploration Team supported by the demonstrated regional prospectivity of the mineralized corridor which also hosts the Kora, Judd and Arakompa deposits. _”
Arakompa Vein System Background
The Arakompa project is interpreted to be an intrusive related gold-copper-silver epithermal vein system with similarities to the producing Kora and Judd vein systems. A significant difference at Arakompa is that it is hosted in tonalite to dioritic rock, whereas Kora and Judd are hosted predominantly in metasediments (phyllite).
Mineralization at Arakompa is in pronounced vein lodes but is also widespread across a very broad envelope, hosted in strongly altered tonalite and diorite. This has been interpreted to have resulted from collapsing argillic and advanced argillic alteration, and the propylitic alteration of the basement tonalite are interpreted to originate from the intrusion of a large magmatic porphyry body. Phyllic alteration appears to be associated with gold mineralization, providing a large halo (at least 100 m wide) around the vein corridor. There has likely been an upwelling of phyllic alteration from the porphyry into the high-grade veins. This has resulted in mineralization between the veins, providing the potential for bulk mining.
Multi-stage mineralizing events with several phases of quartz-sulphide development are apparent within the veins themselves. The sequence of early quartz deposited from a mesothermal dilute fluid followed by pyrite-copper-gold ± Bi-Te-Pb-Zn-Sn mineralization at Arakompa has many similarities to the same events encountered at Kora and Judd.
The main sulphides are pyrite, chalcopyrite, bornite and bismuthinite. As at Kora, chalcopyrite forms late, overprinting early phases of pyrite. Gold is documented in petrological reports and shown in photomicrographs as occurring in quartz, or often as inclusions overgrown by chalcopyrite.
Porphyry evidence is widespread at Arakompa. Localized, high-level B veins (quartz with centerline pyrite) are present, typical of the upper parts of a porphyry system. Magnetite-epidote alteration represents classic prograde porphyry assemblages, indicative of the inner propylitic shell. Chalcocite is also locally present, suggesting an underlying copper-enriched body.
Surface field work completed historically and by K92 has demonstrated that the target size of Arakompa is significant, with mineralization observed from drill holes, rock samples and surface workings for at least 2.0 km of strike, hosted within an approximately 400 metre wide mineralized intense phyllic altered package, and a vertical extent of over 800 metres.
Wera Vein System Background
The Wera Project is interpreted as a gold-bearing, low-sulphidation epithermal system hosted within diorite-tonalite intrusives. It is accessible by road and located approximately 10 kilometres southwest of Kora.
K92 Mining identified Wera as a target area following results from a Mobile MT survey and a review of historic exploration data. Field programs commenced in July 2024 and have included geological mapping, rock chip sampling, soil sampling, and trenching.
Mineralization at Wera occurs within quartz veins exhibiting classic low-sulphidation epithermal textures. Alteration is largely restricted to narrow halos around the veins, dominated by phyllic and silica assemblages. Rock chip, soil, and trench samples have returned anomalous levels of arsenic, antimony, thallium, molybdenum, and tungsten, pathfinder elements typically found near the upper levels of low-sulphidation systems.
A scout diamond drilling program is currently underway. This marks the first major drill campaign at Wera, designed to test the interpreted vein system near surface and provide critical information to guide subsequent, deeper drilling.
Figures
A plan map for Arakompa is provided in Figure 1 . A cross section showing KARDD0025, KARDD0029, KARDD0038 and KARDD0061 at Arakompa is provided in Figure 2 . A cross section showing KARDD0056 and KARDD0059 at Arakompa is provided in Figure 3 . A cross section showing KARDD0030, KARDD0033, KARDD0048 and KARDD0067 at Arakompa is provided in Figure 4 . A long section showing Arakompa bulk intercepts and gram metre contours is provided in Figure 5 . Long sections of AR1 and AR2 Veins showing the location of the latest drill holes are provided in Figures 6 and 7 , respectively. A plan map for Wera showing rock chip samples is provided in Figure 8 . A regional location map is provided in Figure 9 . Core photograph of drill hole KARDD0061 is provided in Figure 10 . Photograph of Wera rock chip samples is provided in Figure 11 .
Table 1 Significant Intercepts from Arakompa Diamond Drilling
| Hole ID | From
(m) | To
(m) | Interval
(m) | True width (m) | Gold
g/t | Silver
g/t | Copper % | Gold Eq | Vein | | KARDD0041 | 407.50 | 440.00 | 32.50 | 19.50 | 1.06 | 43 | 0.11 | 1.73 | Bulk Intersection | | KARDD0041 | 373.00 | 374.60 | 1.60 | 0.96 | 4.77 | 4 | 0.05 | 4.89 | AR2 | | KARDD0041 | 407.50 | 415.50 | 8.00 | 4.80 | 3.28 | 170 | 0.25 | 5.65 | AR1 | | including | 407.50 | 411.00 | 3.50 | 2.10 | 5.74 | 385 | 0.51 | 10.99 | AR1 | | KARDD0041 | 519.30 | 521.60 | 2.30 | 1.38 | 1.68 | 15 | 1.00 | 3.42 | | | KARDD0045 | 462.10 | 475.40 | 13.30 | 9.71 | 0.84 | 4 | 0.10 | 1.03 | Bulk Intersection | | KARDD0045 | 470.50 | 474.15 | 3.65 | 2.66 | 2.31 | 8 | 0.16 | 2.65 | AR1 | | KARDD0046 | 329.40 | 391.60 | 62.20 | 49.76 | 0.87 | 5 | 0.10 | 1.08 | Bulk Intersection | | KARDD0046 | 332.80 | 338.30 | 5.50 | 4.40 | 2.88 | 5 | 0.15 | 3.17 | AR1 | | KARDD0046 | 346.00 | 348.60 | 2.60 | 2.08 | 2.56 | 16 | 0.59 | 3.66 | | | KARDD0046 | 369.50 | 375.60 | 6.10 | 4.88 | 2.12 | 3 | 0.09 | 2.29 | | | KARDD0047 | 123.90 | 185.90 | 62.00 | 42.78 | 0.19 | 13 | 0.02 | 0.37 | Bulk Intersection | | KARDD0047 | 294.20 | 319.60 | 25.40 | 17.53 | 1.23 | 8 | 0.13 | 1.52 | Bulk Intersection | | KARDD0047 | 154.80 | 155.80 | 1.00 | 0.69 | 0.09 | 540 | 0.25 | 6.73 | AR1 | | KARDD0047 | 307.60 | 311.40 | 3.80 | 2.62 | 6.38 | 44 | 0.61 | 7.84 | | | KARDD0048 | 378.00 | 423.42 | 45.42 | 32.25 | 0.99 | 1 | 0.03 | 1.05 | Bulk Intersection | | KARDD0048 | 215.10 | 216.30 | 1.20 | 0.85 | 11.80 | 3 | 0.00 | 11.84 | | | KARDD0048 | 234.20 | 235.10 | 0.90 | 0.64 | 13.65 | 3 | 0.01 | 13.70 | | | KARDD0048 | 393.70 | 395.30 | 1.60 | 1.14 | 11.15 | 2 | 0.04 | 11.24 | AR2 | | KARDD0048 | 413.00 | 417.80 | 4.80 | 3.41 | 3.11 | 1 | 0.06 | 3.22 | AR1 | | KARDD0049 | 320.60 | 351.80 | 31.20 | 22.15 | 1.17 | 3 | 0.11 | 1.38 | Bulk Intersection | | KARDD0049 | 334.00 | 342.50 | 8.50 | 6.04 | 1.13 | 6 | 0.23 | 1.55 | | | KARDD0049 | 345.10 | 351.80 | 6.70 | 4.76 | 3.35 | 2 | 0.11 | 3.55 | AR1 | | including | 345.10 | 346.20 | 1.10 | 0.78 | 14.45 | 6 | 0.19 | 14.80 | AR1 | | KARDD0050 | 612.00 | 637.30 | 25.30 | 18.98 | 0.61 | 5 | 0.21 | 1.00 | Bulk Intersection | | KARDD0050 | 93.70 | 98.70 | 5.00 | 3.75 | 1.17 | 11 | 0.11 | 1.48 | | | KARDD0050 | 290.10 | 297.30 | 7.20 | 5.40 | 0.41 | 14 | 0.20 | 0.88 | | | KARDD0050 | 351.70 | 358.00 | 6.30 | 4.73 | 1.26 | 6 | 0.05 | 1.40 | | | KARDD0050 | 409.10 | 410.20 | 1.10 | 0.82 | 2.94 | 1 | 0.02 | 2.97 | | | KARDD0050 | 466.00 | 467.40 | 1.40 | 1.05 | 2.69 | 21 | 0.21 | 3.26 | | | KARDD0050 | 530.10 | 537.40 | 7.30 | 5.47 | 0.98 | 6 | 0.14 | 1.27 | AR2 | | KARDD0050 | 580.00 | 586.10 | 6.10 | 4.58 | 1.11 | 5 | 0.32 | 1.68 | AR1 | | KARDD0050 | 622.00 | 626.20 | 4.20 | 3.15 | 1.12 | 9 | 0.35 | 1.76 | | | KARDD0050 | 633.00 | 634.40 | 1.40 | 1.05 | 3.11 | 28 | 1.06 | 5.10 | | | KARDD0051 | 394.30 | 409.20 | 14.90 | 11.18 | 0.59 | 5 | 0.23 | 1.01 | Bulk Intersection | | KARDD0051 | 388.40 | 389.20 | 0.80 | 0.60 | 0.79 | 6 | 0.44 | 1.55 | | | KARDD0051 | 395.30 | 398.10 | 2.80 | 2.10 | 1.48 | 6 | 0.52 | 2.37 | AR2 | | KARDD0051 | 403.20 | 408.00 | 4.80 | 3.60 | 0.68 | 10 | 0.34 | 1.33 | | | KARDD0051 | 501.20 | 501.70 | 0.50 | 0.38 | 2.39 | 6 | 0.01 | 2.47 | | | KARDD0051 | 509.70 | 510.70 | 1.00 | 0.75 | 2.82 | 45 | 0.83 | 4.65 | | | KARDD0051 | 524.00 | 525.10 | 1.10 | 0.83 | 2.34 | 29 | 0.33 | 3.20 | | | KARDD0052 | 533.00 | 608.40 | 75.40 | 45.24 | 0.58 | 5 | 0.25 | 1.04 | Bulk Intersection | | KARDD0052 | 111.10 | 112.20 | 1.10 | 0.66 | 2.37 | 22 | 0.17 | 2.88 | | | KARDD0052 | 372.00 | 375.00 | 3.00 | 1.80 | 0.91 | 17 | 0.22 | 1.45 | | | KARDD0052 | 542.40 | 546.30 | 3.90 | 2.34 | 0.74 | 35 | 0.20 | 1.46 | AR2 | | KARDD0052 | 557.70 | 562.00 | 4.30 | 2.58 | 0.73 | 4 | 0.45 | 1.47 | | | KARDD0052 | 590.20 | 592.00 | 1.80 | 1.08 | 1.02 | 5 | 0.18 | 1.37 | | | KARDD0052 | 601.80 | 608.40 | 6.60 | 3.96 | 2.31 | 19 | 0.72 | 3.66 | AR1 | | including | 606.20 | 608.40 | 2.20 | 1.32 | 4.71 | 51 | 1.81 | 8.12 | AR1 | | KARDD0053 | 480.40 | 490.00 | 9.20 | 6.90 | 0.88 | 1 | 0.11 | 1.06 | Bulk Intersection | | KARDD0053 | 130.00 | 132.10 | 2.10 | 1.58 | 1.80 | 35 | 0.27 | 2.62 | | | KARDD0053 | 461.30 | 466.00 | 4.70 | 3.53 | 0.97 | 3 | 0.08 | 1.12 | AR1 | | KARDD0053 | 480.80 | 489.00 | 8.20 | 6.15 | 0.93 | 1 | 0.11 | 1.12 | | | KARDD0054 | 310.40 | 328.40 | 18.00 | 13.50 | 0.90 | 2 | 0.04 | 1.00 | Bulk Intersection | | KARDD0054 | 182.60 | 184.90 | 2.30 | 1.73 | 0.69 | 16 | 0.11 | 1.04 | | | KARDD0054 | 317.90 | 324.30 | 6.40 | 4.80 | 2.21 | 4 | 0.10 | 2.42 | AR2 | | including | 323.10 | 324.30 | 1.20 | 0.90 | 9.85 | 8 | 0.17 | 10.21 | AR2 | | KARDD0055 | 572.20 | 592.00 | 19.80 | 13.86 | 0.88 | 2 | 0.08 | 1.02 | Bulk Intersection | | KARDD0055 | 643.40 | 659.80 | 16.40 | 11.48 | 0.54 | 4 | 0.27 | 1.02 | Bulk Intersection | | KARDD0055 | 299.00 | 300.30 | 1.30 | 0.91 | 2.15 | 24 | 0.38 | 3.03 | | | KARDD0055 | 572.20 | 575.80 | 3.60 | 2.52 | 3.80 | 3 | 0.13 | 4.05 | AR2 | | KARDD0055 | 617.40 | 618.00 | 0.60 | 0.42 | 1.39 | 14 | 0.90 | 2.96 | AR1 | | KARDD0055 | 644.40 | 647.10 | 2.70 | 1.89 | 0.63 | 3 | 0.27 | 1.09 | | | KARDD0055 | 650.90 | 656.10 | 5.20 | 3.64 | 1.03 | 10 | 0.56 | 2.02 | | | KARDD0055 | 658.60 | 659.80 | 1.20 | 0.84 | 1.15 | 2 | 0.14 | 1.39 | | | KARDD0056 | 345.50 | 417.60 | 72.10 | 51.91 | 0.80 | 10 | 0.05 | 1.00 | Bulk Intersection | | KARDD0056 | 345.50 | 346.90 | 1.40 | 1.01 | 1.51 | 32 | 0.25 | 2.27 | | | KARDD0056 | 353.50 | 361.20 | 7.70 | 5.54 | 5.25 | 61 | 0.04 | 6.02 | AR2 | | including | 353.50 | 355.00 | 1.50 | 1.08 | 22.29 | 224 | 0.01 | 24.90 | AR2 | | KARDD0056 | 375.60 | 377.70 | 2.10 | 1.51 | 1.54 | 34 | 0.19 | 2.23 | | | KARDD0056 | 410.20 | 412.30 | 2.10 | 1.51 | 0.73 | 7 | 0.34 | 1.35 | AR1 | | KARDD0056 | 481.50 | 485.30 | 3.80 | 2.74 | 0.91 | 14 | 0.20 | 1.38 | | | KARDD0056 | 528.60 | 534.60 | 6.00 | 4.32 | 0.34 | 24 | 0.38 | 1.21 | | | KARDD0057 | 588.80 | 711.10 | 122.30 | 88.06 | 0.16 | 2 | 0.18 | 0.46 | Bulk Intersection | | KARDD0057 | 127.90 | 133.10 | 5.20 | 3.74 | 5.06 | 26 | 0.14 | 5.57 | | | KARDD0057 | 317.20 | 319.00 | 1.80 | 1.30 | 1.69 | 31 | 0.44 | 2.74 | | | KARDD0057 | 493.60 | 495.30 | 1.70 | 1.22 | 1.13 | 14 | 0.28 | 1.72 | AR2 | | KARDD0057 | 551.20 | 551.70 | 0.50 | 0.36 | 5.17 | 38 | 2.17 | 9.01 | AR1 | | KARDD0057 | 616.10 | 617.60 | 1.50 | 1.08 | 0.67 | 35 | 0.35 | 1.62 | | | KARDD0058 | 427.10 | 483.80 | 56.70 | 40.82 | 0.39 | 2 | 0.08 | 0.54 | Bulk Intersection | | KARDD0058 | 141.50 | 142.70 | 1.20 | 0.86 | 5.34 | 29 | 0.25 | 6.06 | | | KARDD0058 | 361.80 | 363.60 | 1.80 | 1.30 | 0.96 | 3 | 0.04 | 1.06 | | | KARDD0058 | 427.10 | 428.70 | 1.60 | 1.15 | 1.09 | 2 | 0.20 | 1.42 | AR2 | | KARDD0058 | 441.20 | 442.50 | 1.30 | 0.94 | 0.87 | 1 | 0.13 | 1.10 | | | KARDD0058 | 480.20 | 483.80 | 3.60 | 2.59 | 1.04 | 3 | 0.10 | 1.22 | AR1 | | KARDD0059 | 476.00 | 498.20 | 22.20 | 15.98 | 0.72 | 5 | 0.16 | 1.02 | Bulk Intersection | | KARDD0059 | 281.30 | 283.40 | 2.10 | 1.51 | 0.78 | 29 | 0.46 | 1.83 | | | KARDD0059 | 353.80 | 357.20 | 3.40 | 2.45 | 0.93 | 12 | 0.02 | 1.11 | | | KARDD0059 | 459.50 | 460.20 | 0.70 | 0.50 | 4.18 | 39 | 1.00 | 6.21 | AR2 | | KARDD0059 | 489.60 | 493.30 | 3.70 | 2.66 | 3.34 | 22 | 0.84 | 4.92 | AR1 | | KARDD0060 | 608.70 | 633.60 | 24.90 | 16.19 | 0.45 | 8 | 0.30 | 1.01 | Bulk Intersection | | KARDD0060 | 462.00 | 466.60 | 4.60 | 2.99 | 1.34 | 10 | 0.16 | 1.70 | | | KARDD0060 | 476.70 | 478.50 | 1.80 | 1.17 | 1.97 | 46 | 0.83 | 3.80 | AR1 | | KARDD0060 | 501.10 | 503.00 | 1.90 | 1.24 | 3.72 | 21 | 0.52 | 4.78 | | | KARDD0060 | 541.50 | 543.70 | 2.20 | 1.43 | 0.48 | 14 | 0.31 | 1.14 | | | KARDD0060 | 614.00 | 618.40 | 4.40 | 2.86 | 1.39 | 24 | 0.54 | 2.51 | | | KARDD0061 | 343.00 | 439.10 | 96.10 | 76.88 | 2.48 | 4 | 0.07 | 2.64 | Bulk Intersection | | KARDD0061 | 343.00 | 345.00 | 2.00 | 1.60 | 3.78 | 3 | 0.03 | 3.86 | | | KARDD0061 | 374.30 | 375.50 | 1.20 | 0.96 | 0.80 | 5 | 1.24 | 2.80 | AR2 | | KARDD0061 | 414.60 | 421.66 | 7.06 | 5.65 | 27.48 | 18 | 0.15 | 27.92 | AR1 | | including | 416.50 | 419.10 | 2.60 | 2.08 | 64.60 | 42 | 0.27 | 65.50 | AR1 | | KARDD0061 | 431.10 | 431.50 | 0.40 | 0.32 | 14.90 | 5 | 0.02 | 14.99 | | | KARDD0061 | 437.20 | 438.10 | 0.90 | 0.72 | 13.01 | 48 | 1.36 | 15.70 | | | KARDD0062 | 334.60 | 367.40 | 11.90 | 9.52 | 0.69 | 7 | 0.15 | 1.00 | Bulk Intersection | | KARDD0062 | 334.60 | 337.80 | 3.20 | 2.56 | 1.25 | 17 | 0.08 | 1.57 | AR2 | | KARDD0062 | 341.70 | 346.50 | 4.80 | 3.84 | 0.76 | 5 | 0.28 | 1.25 | | | KARDD0062 | 362.20 | 367.40 | 5.20 | 4.16 | 0.79 | 11 | 0.28 | 1.35 | AR1 | | KARDD0062 | 493.70 | 495.60 | 1.90 | 1.52 | 0.74 | 11 | 0.03 | 0.92 | | | KARDD0063 | 503.80 | 514.50 | 10.70 | 7.49 | 0.97 | 4 | 0.11 | 1.20 | Bulk Intersection | | KARDD0063 | 291.00 | 292.10 | 1.10 | 0.77 | 5.84 | 10 | 0.11 | 6.12 | | | KARDD0063 | 471.60 | 473.00 | 1.40 | 0.98 | 2.83 | 7 | 0.11 | 3.09 | AR1 | | KARDD0063 | 476.40 | 476.90 | 0.50 | 0.35 | 8.25 | 16 | 0.15 | 8.68 | | | KARDD0063 | 510.50 | 514.50 | 4.00 | 2.80 | 2.12 | 5 | 0.16 | 2.44 | | | KARDD0064 | 387.70 | 414.00 | 26.30 | 19.99 | 0.62 | 6 | 0.17 | 0.96 | Bulk Intersection | | KARDD0064 | 355.60 | 356.90 | 1.30 | 0.99 | 2.16 | 18 | 0.32 | 2.86 | | | KARDD0064 | 387.70 | 390.00 | 2.30 | 1.75 | 4.49 | 18 | 0.57 | 5.59 | AR1 | | KARDD0064 | 408.30 | 410.00 | 1.70 | 1.29 | 0.76 | 13 | 0.27 | 1.33 | | | KARDD0065 | 297.00 | 987.4 | 690.40 | 641.30 | 0.17 | 2 | 0.17 | 0.30% CuEq | Bulk Porphyry-style Intersection | | including | 349.70 | 745.00 | 395.30 | 363.38 | 0.24 | 2 | 0.20 | 0.38% CuEq | Bulk Porphyry-style Intersection | | including | 429.80 | 479.00 | 49.20 | 37.39 | 0.82 | 4 | 0.18 | 1.15 | Bulk Intersection | | KARDD0065 | 429.80 | 435.90 | 6.10 | 4.64 | 3.33 | 21 | 0.36 | 4.14 | AR1 | | KARDD0065 | 446.10 | 452.80 | 6.70 | 5.09 | 1.31 | 2 | 0.16 | 1.59 | | | KARDD0065 | 476.70 | 479.00 | 2.30 | 1.75 | 2.96 | 8 | 1.05 | 4.70 | | | KARDD0066 | 435.80 | 484.60 | 48.80 | 37.09 | 0.26 | 3 | 0.02 | 0.32 | Bulk Intersection | | KARDD0066 | 221.60 | 223.20 | 1.60 | 1.22 | 0.79 | 6 | 0.06 | 0.96 | | | KARDD0066 | 379.60 | 381.40 | 1.80 | 1.37 | 0.73 | 8 | 0.16 | 1.07 | AR2 | | KARDD0066 | 405.20 | 406.80 | 1.60 | 1.22 | 0.46 | 8 | 0.01 | 0.56 | AR1 | | KARDD0066 | 443.00 | 445.00 | 2.00 | 1.52 | 2.09 | 2 | 0.01 | 2.13 | | | KARDD0066 | 473.50 | 475.20 | 1.70 | 1.29 | 1.05 | 7 | 0.01 | 1.15 | | | KARDD0066 | 479.30 | 480.50 | 1.20 | 0.91 | 0.68 | 13 | 0.08 | 0.96 | | | KARDD0067 | 554.90 | 603.20 | 48.30 | 36.71 | 0.80 | 5 | 0.30 | 1.34 | Bulk Intersection | | KARDD0067 | 272.40 | 274.30 | 1.90 | 1.44 | 0.49 | 9 | 0.20 | 0.89 | | | KARDD0067 | 557.40 | 575.00 | 17.60 | 13.38 | 1.64 | 9 | 0.50 | 2.53 | AR1 | | KARDD0067 | 561.30 | 563.00 | 1.70 | 1.29 | 5.49 | 17 | 0.32 | 6.18 | | | KARDD0067 | 584.30 | 585.60 | 1.30 | 0.99 | 1.49 | 16 | 0.64 | 2.67 | | | KARDD0067 | 601.90 | 603.20 | 1.30 | 0.99 | 1.09 | 24 | 1.41 | 3.57 | |
Earlier from i-80 Gold Corp.
- K92 Mining Strengthens Community Affairs and External Relations Leadership with Key Appointments
- K92 Mining Announces Q2 2025 Financial Results - Commissioning of Stage 3 1.2 mtpa Process Plant on Track for Completion in First Half of Q4 2025
- K92 Mining Announces Strong Q2 Production Results - 34,816 oz AuEq Produced, and Commenced Commissioning of 1.2 Mtpa Stage 3 Process Plant in June