# Freegold Intersects 1.7 g/t Au over 70.1m at Golden Summit *2025-11-20T08:02:00-05:00* Freegold Intersects 1.7 g/t Au over 70.1m at Golden Summit Canada NewsWire **_Highlights:_** | •**GS2519** | **1.08 g/Au over 110.7m one of the most western ** | | --- | --- | | | **holes drilled to date in the WOW Zone.** | | •**GS2521** | **1.7g/t Au over 70.1m** | | •**GS2522** | **1.44 g/t Au over 22.5m from 4.5m** | | •**GS2526** | **0.9 g/t Au over 182.9m** | | | | --- | | **_The width refers to drill hole intercepts; true width cannot be determined due to the uncertain geometry of mineralization_** | **2025 PROGRAM** - Drilling is expected to remain ongoing until mid-December - _Conversion of inferred resources into indicated & further exploration drilling and geotechnical drilling._ - 54 holes ( ~35,000m) completed - Ongoing metallurgical work, focusing on flowsheet optionality with sulphide oxidation is a key part of our strategy to maximize the potential of the resource. - Commencement of a Pre-Feasibility Study (PFS) VANCOUVER, BC, Nov. 20, 2025/CNW/ -**Freegold Ventures Limited **(TSX: FVL) (OTCQX: FGOVF) pleased to announce the results from eight additional drill holes at the Golden Summit project which further demonstrate the project's resource potential. To date, the company has completed 54 drill holes, and the drilling of 36,231mincluding ongoing holes. A substantial number of assay results are still pending with results expected to be reported as they are finalized. [](https://mma.prnewswire.com/media/2828524/Freegold_Ventures_Limited_Freegold_Intersects_1_7_g_t_Au_over_70.html) **Objectives of the 2025 Drill Program **The 2025 drill program aims to upgrade resources, expand mineralization, and define boundaries in the Dolphin and Cleary Zones. This involves exploration, geotechnical, and metallurgical test holes. Significant exploration potential remains both to the west and east of the current deposit. **Cleary Zone** | **Hole ** | **Depth** | **Dip** | **Azimuth** | **From ** | **To** | **Interval ** | **Au ** | | --- | --- | --- | --- | --- | --- | --- | --- | | **Number** | **(m)** | **(m)** | **(m)** | **g/t** | | | | | GS2510 | 492.9 | -75 | 360 | 35.7 | 63.1 | 27.4 | 0.89 | | | | | | 297.8 | 316.1 | 18.3 | 0.82 | | | | | | 370.9 | 377 | 6.1 | 7.50 | | | | | | **425.8** | **459.3** | **33.5** | **1.49** | | GS2513 | 448.1 | -80 | 360 | **35.7** | **60** | **24.3** | **1.43** | | | | | | **261.2** | **268.5** | **7.3** | **5.98** | | _incl_ | | | | 263.3 | 264.3 | 1.0 | 31.74 | | | | | | 353.6 | 383.1 | 29.5 | 1.06 | | | | | | 407.5 | 422.8 | 15.3 | 0.96 | | GS2521 | 577.3 | -75 | 360 | **249** | **319.1** | **70.1** | **1.7** | | | | | | 416.7 | 481.3 | 64.6 | 0.73 | | | | | | **535.5** | **577.3** | **41.8** | **1.29** | | | | --- | | _The width refers to drill hole intercepts; true width cannot be determined due to the uncertain geometry of mineralization__._ | GS2510 had a planned depth of 600mbut reached only 492.9mdue to difficult drilling conditions. In the target zone, the hole intersected 1.49g/t Au over 32.5mat a depth of 425.8m. GS2513 and GS2521 were both infill holes and part of the 10-hole groundwater investigation program conducted to measure the hydraulic properties of lithologies within the potential proposed pit volume (i.e., schist, granodiorite, and tonalite) through packer testing. The results will provide hydraulic conductivities to inform the conceptual hydrogeologic model and help estimate dewatering needs. Vibrating Wire Piezometers (VWPs) were installed in these 8 of these holes to measure groundwater levels within the potential pit area, including vertical and horizontal gradients, to identify potential fault-block compartmentalization, and to monitor long-term groundwater levels. VWP depths were chosen to target various schist units, granodiorite, and tonalite in each hole. GS2513 intersected higher-grade mineralization closer to surface, with 1.43g/t Au over 24.3mfrom 35.7m. It was also planned for a depth of 600mbut was terminated at 448mdue to difficult conditions. GS2521 intersected 1.7g/t Au over 70.1mat 259mand an additional 1.29g/t Au at 535.5m; however, the hole was lost in the mineralized zone before reaching the planned depth of 700m. **Dolphin Zone** | **Hole ** | **Depth** | **Dip** | **Azimuth** | **From ** | **To ** | **Interval ** | **Au ** | | --- | --- | --- | --- | --- | --- | --- | --- | | **Number** | **(m)** | **(m)** | **(m)** | **g/t** | | | | | GS2518 | 656.2 | -75 | 360 | **142** | **169.1** | **27.1** | **1.17** | | | | | | 262.7 | 307.8 | 45.1 | 0.86 | | | | | | 364.8 | 370 | 5.2 | 1.35 | | | | | | 507.5 | 569.1 | 61.6 | 0.96 | | | | | | 611.7 | 617.8 | 6.1 | 4.14 | | GS2526 | 603.6 | -80 | 360 | 24.2 | 25.6 | 1.4 | 12.19 | | | | | | 37.5 | 53.9 | 16.4 | 1.26 | | | | | | 104.2 | 1