# Forge Resources Drills 45.01 g/t Gold over a Core Length of 3.15 m Starting at 286.0 Metres at Payoff Zone at Alotta Project, Yukon *2025-11-20T08:30:00-05:00* Forge Resources Drills 45.01 g/t Gold over a Core Length of 3.15 m Starting at 286.0 Metres at Payoff Zone at Alotta Project, Yukon Vancouver, British Columbia--(Newsfile Corp. - November 20, 2025) - **Forge Resources Corp.**(CSE: FRG) (OTCQB: FRGGF) (FSE: 5YZ) ("**FRG**" or the "**Company**") is pleased to announce additional gold assay results from the Phase 2 diamond drill program, confirming the presence of significant gold mineralization at its Alotta Project, **intercepting 45.01 g/tonne gold over a core length of 3.15 metres**. Partial gold analysis of the first batch has been reported (_see News Release dated November 17, 2025)_with entire rushed batch now completed for gold analysis only; multi-element analysis results remain pending. Assay highlights of diamond drill hole ALT-25-012 pertaining to this News Release are found in Table 2. Due to prolonged assay laboratory delays, the Company requested rush analysis of the sample batch containing potentially high-grade gold from drill hole ALT-25-012. **Highlights:** - Gold analysis from selected rushed core samples from diamond drill hole **ALT-25-012**, at the Payoff Zone, have returned **45.01 g/tonne gold over a core length of 3.15 m starting at 286.0 m. **As shown in Table 2. The new composited interval is including the **105 g/tonne gold over a core length of 1.25 m starting at 286.0 metres **reported on November 17, 2025. - Typical gold enriched porphyry mineralization occurring around new composite area, most ranging between 0.03 - 1.0 grams/tonne gold from limited assay results received to date. - Mineralization at Alotta remains open in all directions with drilling to date confirming a mineralized footprint of approximately 4km by 1km (see Figure 1). All drill holes have encountered porphyry style, gold enriched, porphyry mineralization. - Alotta is a gold enriched porphyry system hosting both semi-massive polymetallic sulphide veins and quartz veins overprinting the porphyry mineralization. The first 80 metres of ALT-25-012 contains many of these veins with **assay results still pending**. To date, these veins have significantly contributed to the overall gold grade. - All drill core is orientated, providing critical information on both the sulphide and quartz vein potential orientations. Completion of the assay results and compilation of the structural data will be important in determining future drilling orientations in order to better test these critical vein systems within the porphyry system. **PJ Murphy, CEO of Forge Resources**, states: _"With the first__batch of gold assay results completed we continue to see exceptional high-grade gold results from hole ALT-25-012, which returned **45.01 g/tonne gold over a core length of 3.15 m, including 58.93 g/tonne gold over a core length of 2.4 m, including 105 g/tonne gold over a core length of 1.25 m.**We are extremely excited by these impressive results as these assays reinforce the strong high-grade gold potential at Alotta and complements the broader, bulk-tonnage style mineralization at the Payoff Zone. We look forward to receiving the multi-element results from the rushed samples of hole ALT-25-012, along with the remaining assays from our Phase 2 drilling program."_ [](https://images.newsfilecorp.com/files/8680/275268_2c6a88b9347e5b02_001full.jpg) _**Photo 1. **Photos of coarse visible gold and bismuthinite from a ~10 cm wide vein in drill hole ALT-25-012 (287.32 - 288.24 m)._ To view an enhanced version of this graphic, please visit: [https://images.newsfilecorp.com/files/8680/275268_2c6a88b9347e5b02_001full.jpg](https://images.newsfilecorp.com/files/8680/275268_2c6a88b9347e5b02_001full.jpg) [](https://images.newsfilecorp.com/files/8680/275268_2c6a88b9347e5b02_002full.jpg) _**Figure 1.**Overview Map of Completed Phase 1 and 2 Diamond Drill Holes._ To view an enhanced version of this graphic, please visit: [https://images.newsfilecorp.com/files/8680/275268_2c6a88b9347e5b02_002full.jpg](https://images.newsfilecorp.com/files/8680/275268_2c6a88b9347e5b02_002full.jpg) **Diamond Drilling ** A total of 1262.75 m of drilling in 4 drill holes were completed by the Company during the Phase 2 drill program in 2025. Drill hole location data for results reported in this news release are listed in Table I. **Table 1: Diamond Drill Hole Data** | **Hole ID** | **Easting (m)** | **Northing (m)** | **Elevation (m)** | **Azimuth** | **Dip** | **Length (m)** | | --- | --- | --- | ---