OreStocks

Copper Giant Resources Corp. press release

Wesdome Reports Fourth Quarter and Year-End 2024 Financial Results

TSXV - TSX Venture Exchange · Copper · Molybdenum · Gold · Silver · Zinc · Lead · Canada

TORONTO, March 19, 2025 (GLOBE NEWSWIRE) -- Wesdome Gold Mines Ltd. (TSX:WDO, OTCQX:WDOFF) (“Wesdome” or the “Company”) today announced its results for the three and twelve months ended December 31, 2024 (“Q4 2024” and “FY 2024”). Preliminary operating results for Q4 2024 and FY 2024 were disclosed in the Company’s press release dated January 14, 2025 . Management will host a conference call tomorrow, March 20, 2025 at 10:00 a.m. ET to discuss its results. All amounts are expressed in Canadian dollars unless otherwise indicated.

Q4 & FY 2024 Highlights

Improving health & safety performance : The Company’s lost time incident frequency rate declined to 0.10 in FY 2024 from 0.76 in FY 2023 (based on OHSA 200,000 hours frequency calculation). Record annual production : Consolidated gold production in Q4 2024 and FY 2024 increased year-over-year by 37% to 49,567 ounces and 39% to 172,033 ounces, respectively. Record annual revenue : FY 2024 revenue increased by 68% compared to FY 2023 to $558.2M driven by strong Q4 2024 revenue of $182.6M. Record annual net income : Q4 2024 net income of $56.6 million, or $0.38 earnings per share, drove FY 2024 net income of $135.7 million, or $0.91 earnings per share. Record net cash from operating activities and free cash flow 1 : Net cash from operating activities in FY 2024 was $241.0 million, or $1.61 per share, including $76.4 million, or $0.51 per share 3 , in Q4 2024. FY 2024 free cash flow 1 was $118.6 million, or $0.79 per share, reflecting a robust fourth quarter contribution of $39.9 million, or $0.27 per share. Debt-free balance sheet and significant growth in liquidity : Cash of $123.1 million as at December 31, 2024 nearly tripled since the end of the prior fiscal year. The balance on the Company’s revolving credit facility of $39.0 million as at December 31, 2023 was fully repaid in 2024, resulting in available liquidity of $273.1 million, including $123.1 million in cash and $150.0 million of undrawn full capacity available under the revolving credit facility. Driving organic growth initiatives: Commenced development of an exploration ramp at Kiena, which will establish a secondary mine egress and facilitate access to near-surface deposits, a crucial component of the fill-the-mill strategy. At Eagle River, completion of the first phase of the global resource model initiative has enhanced the Company’s understanding of the ore body and will support strategic life-of-mine planning. Mineral reserves grow 5% post depletion; resource confidence strengthened : The Company increased its total proven and probable gold reserves by 5% to 1.2 million ounces, successfully replacing depletion. Measured and indicated resources grew by 18%, reflecting a focus on conversion and delineation drilling in 2024. The Company’s 185,000 metre exploration program delivered strong results across both assets, expanding key zones close to existing infrastructure, identifying new targets and advancing geological understanding.

Anthea Bath, President and Chief Executive Officer, commented: “2024 marked a significant milestone for Wesdome, and I am extremely proud of the progress made. Our safety record has shown consistent improvement, and our achievements this year are a testament to the hard work of our team. We saw sequential growth in output throughout the year, which led to record annual production, margins and free cash flow. This financial success resulted in a clean year-end balance sheet, and a fast-growing cash balance in excess of $120 million.

“A key highlight of 2024 was achieving first ore production from the 129-level at Kiena and ramping-up production throughout the year with the fourth quarter marking the highest quarterly throughput since Kiena’s restart in 2021. We also made progress towards creating a two-mine structure at Kiena, completing the 33-level drift rehabilitation in 2024, which now provides drill access to several zones expected to be tested in 2025. In addition, the development of an exploration ramp began in Q2 and is progressing well, with first stope ore from the near-surface Presqu’île Zone expected by the end of 2025.

“At Eagle River, we had a stellar fourth quarter, exceeding the upper end of updated annual production guidance. Sequencing of higher-grade stopes and the exploration program delivered exciting results, including high-grade extensions and the identification of new targets. In addition to completing the digitization of historical data to support our global resource model initiative, induced polarization surveys yielded promising results, with the first anomaly drilled before the end of the year and the results to be considered in 2025.

“As we move into 2025, Wesdome has established clear initiatives to support our organic growth strategy to fill-the-mills, while demonstrating the long mine life potential of our assets. Our focus remains on operational execution, progressing the global resource model initiative and advancing our long-term strategic exploration program. We plan to incorporate the various strategic initiatives across our portfolio into updated technical reports, which are expected to be released in Q1 2026.”

Consolidated Financial and Operating Highlights

| In 000s, except per unit and per share amounts | Q4 2024 | Q4 2023 | FY 2024 | FY 2023 | | Financial results | | | | | | Revenue 2 | $ 182,611 | $102,221 | $ 558,184 | $333,173 | | Cost of sales | $ 57,974 | $54,645 | $ 216,049 | $200,234 | | Gross profit | $ 95,589 | $23,715 | $ 241,861 | $37,751 | | Cash margin 1 | $ 124,637 | $47,576 | $ 342,135 | $132,939 | | EBITDA 1 | $ 114,868 | $38,256 | $ 308,006 | $99,333 | | Net income (loss) | $ 56,629 | $2,420 | $ 135,471 | ($6,187) | | Earnings (loss) per share | $ 0.38 | $0.02 | $ 0.91 | ($0.04) | | Adjusted net income (loss) 1 | 56,629 | 2,420 | 135,668 | (1,910) | | Adjusted net income (loss) per share 1 | $ 0.38 | $0.02 | $ 0.91 | ($0.01) | | Net cash from operating activities | $ 76,411 | $37,176 | $ 240,972 | $101,351 | | Operating cash flow per share 3 | $ 0.51 | $0.25 | $ 1.61 | $0.69 | | Net cash (used in) from financing activities | (884 ) | (1,946) | (39,934 ) | 5,421 | | Net cash used in investing activities | (34,945 ) | (25,441) | (119,312 ) | (98,586) | | Free cash flow 1 | 39,874 | 7,799 | 118,597 | (6,405) | | Free cash flow per share 1 | $ 0.27 | $0.05 | $ 0.79 | ($0.04) | | | | | | | | Average 1 USD → CAD exchange rate | $ 1.3990 | $1.3619 | $ 1.3700 | $1.3495 | | | | | | | | Operating results | | | | | | Gold produced (ounces) | 49,567 | 36,216 | 172,033 | 123,336 | | Gold sold (ounces) | 48,700 | 37,620 | 167,300 | 126,620 | | | | | | | | Per ounce of gold sold 1 | | | | | | Cost of sales 4 ($/oz) | $ 1,190 | $1,453 | $ 1,291 | $1,581 | | Cost of sales 4 (US$/oz) | $ 851 | $1,067 | $ 943 | $1,172 | | Cash costs 1 ($/oz) | $ 1,187 | $1,451 | $ 1,288 | $1,579 | | Cash costs 1 (US$/oz) | $ 848 | $1,065 | $ 940 | $1,170 | | AISC 1 ($/oz) | $ 1,920 | $2,082 | $ 1,999 | $2,231 | | AISC 1 (US$/oz) | $ 1,373 | $1,529 | $ 1,459 | $1,653 | | Average realized price 1 ($/oz) | $ 3,746 | $2,715 | $ 3,333 | $2,629 | | Average realized price 1 (US$/oz) | $ 2,678 | $1,994 | $ 2,433 | $1,948 | | | | | | | | Financial position | | | | | | Cash | $ 123,097 | $41,371 | $ 123,097 | $41,371 | | Working capital 5 | $ 131,261 | ($6,894) | $ 131,261 | ($6,894) | | Total assets | $ 746,654 | $618,956 | $ 746,654 | $618,956 | | Current liabilities | $ 53,883 | $89,115 | $ 53,883 | $89,115 | | Total liabilities | $ 175,836 | $191,656 | $ 175,836 | $191,656 |

Eagle River – Ontario

| Eagle River Operating Results | Q4 2024 | Q4 2023 | FY 2024 | FY 2023 | | | | | | | | Ore milled (tonnes) | | | | | | Eagle River | 60,358 | 54,669 | 222,526 | 222,627 | | Mishi | - | - | - | 6,150 | | Total ore milled | 60,358 | 54,669 | 222,526 | 228,777 | | | | | | | | Head grade (grams per tonne or g/t) | | | | | | Eagle River | 14.3 | 14.1 | 13.7 | 12.6 | | Mishi | - | - | - | 2.3 | | Average head grade | 14.3 | 14.1 | 13.7 | 12.4 | | | | | | | | Average mill recoveries (%) | | | | | | Eagle River | 96.5 | 97.0 | 96.8 | 96.9 | | Mishi | - | - | - | 72.5 | | Average gold recovery | 96.5 | 97.0 | 96.8 | 96.7 | | | | | | | | Gold production (oz) | | | | | | Eagle River | 26,702 | 24,072 | 94,561 | 87,467 | | Mishi | - | - | - | 332 | | Total gold production | 26,702 | 24,072 | 94,561 | 87,799 | | | | | | | | Gold sold (oz) | | | | | | Eagle River | 27,500 | 25,600 | 93,700 | 91,359 | | Mishi | - | - | - | 341 | | Total gold sold | 27,500 | 25,600 | 93,700 | 91,700 | | | | | | | | Production costs per tonne milled 1 ($) | 509 | 526 | 554 | 502 | | | | | | | | Costs per ounce of gold sold ($/oz) | | | | | | Cash margin 1 | 2,514 | 1,462 | 1,942 | 1,275 | | Cost of sales 4 | 1,249 | 1,263 | 1,374 | 1,349 | | Cash costs 1 | 1,245 | 1,261 | 1,370 | 1,347 | | All-in sustaining costs 1 | 2,116 | 1,902 | 2,109 | 2,001 | | | | | | | | Costs per ounce of gold sold (US$/oz) | | | | | | Cash margin 1 | 1,797 | 1,073 | 1,417 | 944 | | Cost of sales 4 | 893 | 928 | 1,003 | 1,000 | | Cash costs 1 | 890 | 926 | 1,000 | 998 | | All-in sustaining costs 1 | 1,512 | 1,397 | 1,540 | 1,483 |

_ Operating Highlights _

Eagle River produced 26,702 and 94,561 ounces of gold in Q4 and FY 2024, respectively. The operation exceeded the upper end of its updated 2024 production guidance range of between 89,000 and 93,000 ounces primarily due to high processed grades that exceeded guidance. Average head grade processed in Q4 2024 was 14.3 g/t and 13.7 g/t for FY 2024. During 2024, 85% of the processed ore was sourced from the high-grade 300, 311 and 720F zones.

In Q4 2024, mill throughput increased by 10% to 60,358 tonnes at a production cost per tonne of $509, a decrease of 3% over Q4 2023. In FY 2024, ore milled was 222,526 tonnes while production costs per tonne milled increased by 10% to $554 compared to FY 2023. Costs per tonne milled for FY 2024 increased mainly due to higher labour and maintenance costs.

Financial Highlights

Revenue at Eagle River increased by 48% to $103.4 million in Q4 2024 and by 29% to $310.3 million for FY 2024 compared to Q4 2023 and FY 2023, respectively. The increase in both Q4 2024 and FY 2024 is due to a higher average realized price of gold sold and an increase in ounces sold compared to the prior year periods.

Cost of sales in Q4 2024 was $34.3 million, an increase of 6% compared to the corresponding period in 2023 primarily due to a $1.7 million increase in mine operating costs driven by an 11% increase in ounces produced and a 10% increase in throughput. Cost of sales in FY 2024 was higher by 4% compared to FY 2023 primarily due to an 8% increase in ounces produced driven by a 10% increase in head grade offset by slightly lower throughput.

In Q4 2024, cash costs per ounce of gold sold were $1,245 (US$890), compared to $1,261 (US$926) in Q4 2023 primarily due to an increase in ounces sold. Cash costs per ounce of gold sold in FY 2024 were $1,370 (US$1,000), an increase of 2%, compared to $1,347 (US$998) in FY 2023, primarily due to an increase in mine operating costs driven by higher ounces produced.

In Q4 2024, AISC per ounce of gold sold were $2,116 (US$1,512), a 11% increase, compared to $1,902 (US$1,397) in Q4 2023. This was primarily due to an increase in mine operating costs driven by higher ounces produced and higher sustaining capital expenditures. AISC per ounce of gold sold in the FY 2024 were $2,109 (US$1,540), an increase of 5%, compared to $2,001 (US$1,483) in FY 2023, primarily due to higher operating costs driven by higher ounces produced and an increase in sustaining capital expenditures.

Growth Opportunities

Fill-the-Mill Strategy

Wesdome’s organic growth strategy aims to fully utilize available mill capacity at both operations. The mills were originally built decades ago when the profile of the ore fed into them were lower grade and higher tonnage, in contrast to the current primarily high-grade feed. In 2024, the Eagle River mill operated at an average capacity of 610 tonnes per day, representing 51% of its permitted capacity of 1,200 tonnes per day.

Global Model Initiative

To enhance both the mine life and throughput at Eagle River, the Company has launched a multi-phase global resource modeling initiative. The first phase, which was completed in 2024, involved digitizing all of Eagle River’s exploration data, providing an enhanced view for resource estimation, mine planning and exploration targeting. In 2025, the Company aims to create a comprehensive unconstrained geological model for the entire Eagle River mine and conduct confirmation and conversion drilling to support a new technical study, which is underway.

Exploration

Exploration of its largely unexplored 100 km 2 land package is the second pillar of Eagle River’s fill-the-mill strategy. In recent years, the majority of Eagle River’s exploration budget has been allocated towards infill and conversion drilling. In 2025, as part of a strategic long-term exploration plan, the Company is undertaking a 120,000-metre exploration program at Eagle River, approximately 60% of which will be directed to brownfield and greenfield activities.

Cost Optimization

In addition to the benefits of leveraging its high fixed cost base as mill capacity utilization increases, cost structure reviews at Eagle River are ongoing, focusing on productivity and planning, supply chain and contractor management as well as technology and automation.

Kiena – Quebec

| Kiena Operating Results | Q4 2024 | Q4 2023 | FY 2024 | FY 2023 | | | | | | | | Ore milled (tonnes) | 62,421 | 49,649 | 216,755 | 191,148 | | Head grade (g/t) | 11.5 | 7.7 | 11.2 | 5.9 | | Average mill recoveries (%) | 99.1 | 98.5 | 98.9 | 98.3 | | Mill availability (%) | 97.6 | 93.5 | 93.0 | 94.4 | | Gold production (oz) | 22,865 | 12,144 | 77,472 | 35,537 | | Gold sold (oz) | 21,200 | 12,020 | 73,600 | 34,920 | | | | | | | | Production costs per tonne milled 1 ($) | 392 | 417 | 415 | 405 | | | | | | | | Costs per ounce of gold sold ($/oz) | | | | | | Cash margin 1 | 2,618 | 845 | 2,176 | 460 | | Cost of sales 4 | 1,115 | 1,856 | 1,187 | 2,192 | | Cash costs 1 | 1,111 | 1,854 | 1,183 | 2,189 | | All-in sustaining costs 1 | 1,667 | 2,466 | 1,859 | 2,834 | | | | | | | | Costs per ounce of gold sold (US$/oz) | | | | | | Cash margin 1 | 1,871 | 620 | 1,589 | 341 | | Cost of sales 4 | 797 | 1,362 | 866 | 1,624 | | Cash costs 1 | 794 | 1,361 | 863 | 1,622 | | All-in sustaining costs 1 | 1,191 | 1,811 | 1,357 | 2,100 |

_ Operating Highlights _

In Q4 2024, Kiena produced 22,865 ounces of gold as compared to 12,144 ounces in Q4 2023, an increase of 88%, driven by a 49% increase in head grade due to the ramp-up in the mining and processing of high-grade Kiena Deep ore from the 129-level horizon in mid-April and a 26% increase in throughput. For the full year 2024, Kiena produced 77,472 ounces of gold, a 118% increase over FY 2023 due to a 90% increase in head grade and a 13% increase in throughput.

Mill throughput increased 26% in the fourth quarter relative to the prior year period, with 62,421 tonnes processed as compared to 49,649 tonnes in Q4 2023. In 2024, the mill processed 216,755 tonnes, a 13% increase from 2023. Processing of higher-grade Kiena Deep material from the 129-level horizon continued for the duration of 2024 achieving three full quarters of production. In 2025, it is expected that the 121-level to 129-level mining block will be the primary source of ore together with some material being sourced from Presqu’ile Zone at the end of the year.

Financial Highlights

Revenue at Kiena was $79.1 million in Q4 2024, a 144% increase compared to Q4 2023 due to higher ounces sold and a higher average realized Canadian dollar gold price. Revenue for the full year was $247.2 million, a 167% increase over 2023. Ounces of gold sold increased by 76% and 111% compared to the fourth quarter and full-year 2023, respectively.

Cost of sales in Q4 2024 was $23.6 million, an increase of 6% over the corresponding period in 2023 primarily due to a $3.1 million increase in mine operating costs, which was due to 26% higher throughput partially offset by a change in inventory levels of $1.8 million. Cost of sales for FY 2024 was $87.3 million, 14% higher than the corresponding period in 2023 primarily due to an increase in aggregate mine operating costs as a result of a 13% increase in throughput.

Cash costs per ounce of gold sold in Q4 2024 were $1,111 (US$794), a decrease of 40% from Q4 2023 primarily due to a 76% increase in ounces sold. Cash costs per ounce of gold sold in FY 2024 decreased by 46% to $1,183 (US$863) relative to FY 2023.

AISC per ounce of gold sold decreased by 32% in Q4 2024 to $1,667 (US$1,191) relative to Q4 2023 primarily due to a 76% increase in ounces sold, partially offset by an increase in mine operating costs and sustaining capital expenditures. For the full-year 2024, AISC per ounce of gold sold decreased by 34% to $1,859 (US$1,357) relative to 2023.

Growth Opportunities

Fill-the-Mill Strategy

The fill-the-mill strategy at Kiena continues to advance with drilling programs in 2024 confirming the geological model at Dubuisson and testing other near-surface areas potentially accessible from the 33-level drift. Rehabilitation of 33-level was completed in Q4 2024, marking the first milestone in the development of the two-mine structure at Kiena, providing a platform for ore movement to surface and for drilling from underground. Kiena’s mill has a permitted capacity of 2,040 tonnes per day.

Global Model Initiative

The global model initiative at Kiena will follow a similar approach to that at Eagle River, starting with data digitization, flowing through to an unconstrained resource model workflow. While this initiative at Kiena is in early stages, the plan is to progress the program in 2025.

Exploration

Exploration at Kiena in 2025 will take advantage of the newly rehabilitated 33-level track drift, as well as the 109-level exploration drift completed in 2024, to drill deposits from underground. Drill access to the Dubuisson deposit will be available year-round from underground, and the 109-level drift will allow for testing of the VC Zone, a zone with limited drilling to date, but which has returned high-grades in the past. Approximately 5,000 metres of drilling is planned at Dubuisson, Shawkey and other near-surface targets in 2025.

Cost Optimization

Kiena will also aim to leverage its high fixed cost base as capacity utilization increases to enhance operating margins. Cost optimization initiatives focused on productivity and planning, supply chain, contractor management, technology and automation are also underway.

Exploration Update

Eagle River

Drilling Continues to Delineate 300 Zone at Depth and Expand 6 Central Zone

In 2024 more than 105,000 metres were drilled as part of the exploration program at Eagle River, focused on surface and underground drilling, delineating and expanding key zones close to existing infrastructure, as well as identifying new targets and advancing geological understanding. Several high-priority areas were tested in 2024, including the 6 Central Zone, 300 Zone, Falcon 7 Zone, 311 Zone, 5 Zone and 711 Zone, with the primary objective of resource conversion and infill drilling in support of the 2025 production plan.

Drilling in the 6 Central Zone was successful in extending the resource envelope down-plunge by approximately 70%, or 250 metres, while also identifying a parallel structure now known as the 6 Central Parallel Zone. Located near existing development with strong grades and continuity and open down-plunge, the 6 Central Zone offers the opportunity to establish a new mining front at intermediate depths in support of Eagle River’s fill-the-mill strategy.

In 2024, the exploration focus at the 300 Zone, which accounts for the majority of Eagle River’s high-grade reserves, has been on infill drilling and testing continuity down-plunge below the 1,400 m level. Drilling confirmed the continuity of high-grade mineralization and provided critical geological insights regarding the zone’s structural controls at depth. Furthermore, step-out drilling down-plunge targeting the northeast-dipping extension of the structure successfully demonstrated continuity of mineralization, reinforcing the 300 Zone's continued exploration and resource conversion potential.

Earlier from Copper Giant Resources Corp.