# Cabral Gold Announces Additional Results of Infill Drilling at the MG Gold Deposit, Cuiú Cuiú Gold District, Brazil. Doubles Number of Drill Rigs on Site to Six *2026-05-07T06:31:00-04:00* Cabral Gold Announces Additional Results of Infill Drilling at the MG Gold Deposit, Cuiú Cuiú Gold District, Brazil. Doubles Number of Drill Rigs on Site to Six Vancouver, British Columbia--(Newsfile Corp. - May 7, 2026) - **Cabral Gold Inc. (TSXV: CBR) (OTCQX: CBGZF) ("Cabral" or the "Company")**is pleased to announce results from 30 additional shallow reverse circulation ("RC") holes drilled targeting gold-in-oxide material at the MG starter pit within the Cuiú Cuiú Gold District, Brazil. **Highlights** - Results have been received on an additional 30 infill RC holes targeting the gold-in-oxide material in the eastern and central parts of the MG starter pit. The program of infill drilling is aimed at improving the confidence around the current mine plan at MG and upgrading the current reserve. A total of 133 infill RC holes totalling 4,800m from a planned total of 155, have been completed at MG to date - Notable results from this batch of RC drill results from MG include; - **48m @ 0.65 g/t gold **from surface in RC647 - **23m @ 1.43 g/t gold **from surface in RC650 - **24m @ 0.65 g/t gold **from surface in RC651 - **29m @ 0.90 g/t gold **from surface in RC652 - **30m @ 1.45 g/t gold **from surface in RC653 - **19m @ 1.80 g/t gold **from surface in RC657 - **40m @ 0.70 g/t gold **from 3m depth in RC662 - **31m @ 0.62 g/t gold **from surface in RC665 - **46m @ 1.25 g/t gold **from surface in RC671 - **21m @ 0.65 g/t gold **from surface in RC672 - **21m @ 0.66 g/t gold **from surface in RC673 - The Company announces that it is in the process of doubling its exploration drilling effort and adding three additional drill rigs on site bringing the total rig count to 6 (2 RC rigs and 4 diamond drill rigs) Alan Carter, Cabral's President and CEO commented,_"These infill drill results at MG confirm the presence of good gold grades over significant widths within weathered saprolite material and the overlying blanket sediments at or near surface. As we advance with the construction of our Phase 1 gold-in-oxide heap leach operation, which is now 70% complete, these data will allow us to further refine our mine plan for the starter pit and update the reserve base for the MG gold-in-oxide deposit. This in turn will provide us with greater confidence during the initial year of mining at MG. We are also very pleased to announce the decision to add one RC rig and two diamond rigs at Cuiu Cuiu bringing the total number of rigs on site to 6. The bulk of this drilling will be directed to exploration and expansion of the global resource inventory."_ **MG RC Infill Drill Results ** The MG gold deposit is one of the two main gold deposits that currently comprise the Indicated and Inferred resource base at Cuiú Cuiú (see Figure 1). As with the nearby Central gold deposit, the upper portion of the subvertical MG gold deposit is extensively weathered resulting in a vertical profile of highly weathered basement saprolite extending to 60m depth. This saprolite together with the overlying blanket sediments and soils, which are also mineralized, will form the starter pit for the Phase 1 gold-in-oxide mining operation which is due to commence production in Q4 2026. [](https://images.newsfilecorp.com/files/3900/296427_7feec89544da2b1a_002full.jpg) _Figure 1: Map showing location of known gold deposits at MG, Central, and JB. The location of new discoveries at PDM, Machichie NE and Machichie Main and Jerimum Cima discovery are also shown._ To view an enhanced version of this graphic, please visit: [https://images.newsfilecorp.com/files/3900/296427_7feec89544da2b1a_002full.jpg](https://images.newsfilecorp.com/files/3900/296427_7feec89544da2b1a_002full.jpg) The objective of the ongoing RC infill drill program at MG is to provide greater confidence on the grade and continuity of the current reserve base at MG ahead of mining and to further refine the mine plan that was developed as part of the PFS study release in July 2025 (see press release dated July 29, 2026). Results have been received on an additional 30 infill RC holes targeting the gold-in-oxide material in the eastern and central parts of the MG starter pit. These follow the receipt of results from an initial 24 infill RC holes at MG reported on April 7, 2026. The program of infill drilling is aimed at improving the confidence around the Year 1 mine plan at MG and upgrading the current reserve by the end of this month. A total of 68 RC holes totalling 3,174m have been completed to date on a 25 x 25m spacing. Infill drilling in areas of higher grade is ongoing on a 12.5 x 12.5m spacing bringing the total infill dri