OreStocks

Bonterra Resources Inc. press release

Bonterra Intersects 79.9 g/t Au over 2.1 m; Including 333.0 g/t over 0.5 m at the Barry Underground Project and Provides Corporate Updates

TSXV - TSX Venture Exchange · Gold · Silver · Canada

Val-d'Or, Quebec--(Newsfile Corp. - November 15, 2022) - Bonterra Resources Inc. (TSXV: BTR) (OTCQX: BONXF) (FSE: 9BR2)("Bonterra" or the "Company") is pleased to announce the first results from the ongoing infill drilling campaign at the Barry underground project as well as the latest results of the open pit project, which are expected to be used for the grade interpolation of the mineralization at depth. The Company commenced a 125,000 metres ("m") drill program at the Barry underground deposit last August, which contains 0.5 million ounces of Measured and Indicated Mineral resources and 0.7 million ounces of Inferred Mineral resources, as stated in the last mineral resource estimate (the "2021 MRE", see press release dated June 23, 2021). To date, 15,900 m (33 holes) of infill drilling has been completed from the surface, mainly in the upper half of the Barry underground deposit.

Highlights include:

79.9 g/t Au over 2.1 m, including 333.0 g/t Au over 0.5 m in hole MB-22-529A 12.8 g/t Au over 7.9 m, including 29.1 g/t Au over 2.8 m in hole MB-22-433 10.7 g/t Au over 5.7 m, including 96.5 g/t Au over 0.5 m and 8.7 g/t Au over 0.5 m in hole MB-22-509A 10.2 g/t Au over 4.0 m, including 13.9 g/t Au over 1.1 m and 48.6 g/t Au over 0.5 m in hole MB-22-430 12.9 g/t Au over 3.3 m, including 31.3 g/t Au over 1.1 m in hole MB-22-539A

Marc André Pelletier, President and CEO, commented: "We are pleased with the recent results of the ongoing infill drilling campaign for the underground deposit at Barry. MB-22-529A drill hole results of 333.0 g/t over 0.5 m represents the highest reported interception ever at the Barry project. This campaign fits well with our strategy of moving the Barry asset toward a production re-start. Considering the magnitude of the underground mineral resources, the deposit has the potential to become a long-lived operation and the Company intends to further define its potential. Drilling at Barry will continue with two drill rigs on site. Also, the pre-feasibility study ("PFS") on the Barry open pit project is at an important juncture and an update is expected before year end."

Diamond Drilling Results Highlights:

[](https://images.newsfilecorp.com/files/1528/144192_a1af5409347dcb3a_001full.jpg)

Figure 1 - Barry Project -Surface Plan, holes and highlight's location

To view an enhanced version of this graphic, please visit: https://images.newsfilecorp.com/files/1528/144192_a1af5409347dcb3a_001full.jpg

[](https://images.newsfilecorp.com/files/1528/144192_a1af5409347dcb3a_002full.jpg)

Figure 2 - Barry Project - Zoomed-in Surface Plan, holes and highlight's location

To view an enhanced version of this graphic, please visit: https://images.newsfilecorp.com/files/1528/144192_a1af5409347dcb3a_002full.jpg

The Barry open pit drill program was designed to fill gaps in the drill spacing in and immediately around the pit shell from the 2021 MRE. Some holes have been extended below the pit scope to target high potential underground mineralization zones and will be used for the grade interpolation of the mineralization at depth. The results obtained from the in the pit mineralization depth range confirmed the strong southeast extension potential yielded by the H6 zone. Highlights include, from 25 to 40 m vertical depth, 10.7 g/t Au over 5.7 m including 96.5 g/t Au over 0.5 m and 8.7 g/t Au over 0.5 m in hole MB-22-509A, 1.5 g/t Au over 8.8 m in hole MB-22-518 and 5.4 g/t Au over 2.8 m including 23.7 g/t Au over 0.6 m in hole MB-22-516 (figure 3).

[](https://images.newsfilecorp.com/files/1528/144192_a1af5409347dcb3a_003full.jpg)

Figure 3 - Barry Project - Long section 35m, H6 zone results, Looking Northwest

To view an enhanced version of this graphic, please visit: https://images.newsfilecorp.com/files/1528/144192_a1af5409347dcb3a_003full.jpg

The definition drilling program of the Barry underground project is designed to convert inferred resources from the 2021 MRE in indicated resources by decreasing the drill spacing to 25 m. The program especially aims to delineate and expand high grades mineralization shoots identified in the 2021 MRE. The results from the H1 zone, 200m below the surface, demonstrated the continuity of these mineralized shoots over more than 150 m. Best results includes : 12.8 g/t Au over 7.9 m including 29.1 g/t Au over 2.8 m in hole MB-22-433, 10.2 g/t Au over 4,0 m including 13.9 g/t Au over 1.1 m and 48.6 g/t Au over 0.5 m in hole MB-22-430 and 12.9 g/t Au over 3.3 m including 31.3 g/t Au over 1.1 m in hole MB-22-539A (figure 4).

[](https://images.newsfilecorp.com/files/1528/144192_a1af5409347dcb3a_004full.jpg)

Figure 4 - Barry Project - Longitudinal Section 35m, H1 Zone, looking northwest

To view an enhanced version of this graphic, please visit: https://images.newsfilecorp.com/files/1528/144192_a1af5409347dcb3a_004full.jpg

As winter conditions allow access to drill sites, the upcoming infill program will be focused on the prolific sub-vertical 800 Zone and its surrounding H-series zones. Preliminary results from accessible drill site returned good results in accordance with 2021 MRE block model prediction. Highlights include 2.5 g/t Au over 13.8 m including 5.3 g/t Au over 2.9 m in hole MB-22-534, and 9.5 g/t Au over 2.1 m in hole MB-22-529A. In addition to these results the highest drill hole sample ever reported at the Barry project has returned 333.0 g/t Au over 0.5 m included in a mineralized interval of 79.9 g/t Au over 2.1 m in hole MB-22-529A from a newly interpreted H series zone nearby the 800 zone (figure 5).

[](https://images.newsfilecorp.com/files/1528/144192_a1af5409347dcb3a_005full.jpg)

Figure 5 - Barry Project - Cross Section 25m, Hole MB-22-528A, MB-22-529A, MB-22-534, looking southwest

To view an enhanced version of this graphic, please visit: https://images.newsfilecorp.com/files/1528/144192_a1af5409347dcb3a_005full.jpg

Barry Deposit Geology

The Barry gold deposit is characterized by three dominant sets of structures, all dipping to the southeast. The sub-vertical shear zones and the H-Series shear zones dipping 25 to 40 degrees are hosted within intermediate to mafic volcanics and tuffs with local felsic intrusions. Contact zones dip at 50-65 degrees along the lower and upper contacts of the D1, D2 and D3 felsic intrusions with mafic volcanics. Gold mineralization is associated with disseminated sulfides within shear zones and veins with local visible gold. The Barry deposit has been delineated over 1.4 kilometre along strike and 700 m vertical and remains open for expansion.

Corporate Updates

The Company is also pleased to announce that it has retained PI Financial Corp. ("PI") to provide marketing services in accordance with TSX Venture Exchange ("TSX") policies. PI will trade the securities of Bonterra on the TSX for the purposes of maintaining an orderly market. In consideration of the services provided by PI, the Company will pay PI a monthly cash fee of $5,000 for a minimum term of three months and renewable thereafter. Bonterra and PI are unrelated and unaffiliated entities. PI will not receive shares or options as compensation. The capital used for market making will be provided by PI.

In addition, the Company also announces that at the annual and special meeting of its shareholders held on June 22, 2022 (the "Meeting"), the shareholders approved the adoption of Bonterra's new omnibus equity incentive plan (the "Omnibus Plan") and reserved common shares of Bonterra ("Common Shares") for issuance under the Omnibus Plan. The Omnibus Plan allows the Company to issue stock options, restricted share units, performance share units and deferred share units (the "Awards"). The Omnibus Plan is a "rolling up to 10% plan" (as that term is used by the TSX) and replaces the Company's previous rolling 10% stock option plan. The maximum aggregate number of Common Shares that may be reserved for issuance under the Omnibus Plan at any point in time is 10% of the outstanding Common Shares in the capital of the Company at the time of the grant of an Award and the Common Shares reserved and currently available for issuance under the Omnibus Plan is 12,619,550 Common Shares (such number being equal to approximately 10% of the issued and outstanding Common Shares). On November 24, 2021, the TSX adopted a new policy governing security-based compensation (the "New Policy 4.4"). In accordance with the New Policy 4.4, the Company has adopted a number of these amendments in the Omnibus Plan. These changes include allowing option holders to exercise options on a "cashless exercise" or "net exercise" basis, as now expressly permitted by the New Policy 4.4. "Cashless exercise" is a method of exercising stock options in which a securities dealer loans funds to the option holder or sells the same shares as those underlying the option, prior to or in conjunction with the exercise of options, to allow the option holder to fund the exercise of some or all of their options. "Net exercise" is a method of option exercise under which the option holder does not make any payment to the issuer for the exercise of their options and receives on exercise a number of shares equal to the intrinsic value (current market price less the exercise price) of the option valued at the current market price. Under the New Policy 4.4, the current market price must be the 5-day volume weighted average trading price prior to option exercise. "Net exercise" may not be utilized by persons performing investor relations services. The Omnibus Plan, is further described in the Company's information circular, a copy of which can be found on the Company's SEDAR profile at www.sedar.com.

Diamond drill hole results table:

The following table shows the significant intersections of the drill holes presented in this press release.

| Program | Hole ID | | From (m) | To (m) | Length (m) | Grade (g/t Au) | Metal Factor (length * grade) | Zone | | Pit Extension NE /Underground | MB-21-407 | | 275.5 | 276.5 | 1.0 | 6.4 | 6.4 | New H | | Pit Extension NE /Underground | MB-22-421 | | 236.1 | 238.5 | 2.4 | 8.1 | 19.4 | H18 | | Pit Extension NE /Underground | MB-22-421 | Including | 237.0 | 238.0 | 1.0 | 18.2 | 18.2 | H18 | | Pit Extension NE /Underground | MB-22-423 | | 467.5 | 474.5 | 7.0 | 0.9 | 6.6 | H12 | | Depth Extension | MB-22-429 | | 657.9 | 665.4 | 7.5 | 1.1 | 8.1 | New Vertical | | Depth Extension | MB-22-429 | Including | 657.9 | 658.6 | 0.7 | 7.2 | 5.0 | New Vertical | | Depth Extension | MB-22-429 | | 786.5 | 789.6 | 3.1 | 3.3 | 10.1 | H12 | | Depth Extension | MB-22-429 | Including | 788.6 | 789.6 | 1.0 | 9.8 | 9.8 | H12 | | Depth Extension | MB-22-429 | | 801.6 | 807.6 | 6.0 | 1.3 | 8.0 | H12 | | Depth Extension | MB-22-429 | Including | 803.6 | 806.1 | 2.5 | 2.8 | 7.0 | H12 | | Pit Infill / Underground | MB-22-430 | | 271.9 | 275.9 | 4.0 | 10.2 | 40.7 | H1 | | Pit Infill / Underground | MB-22-430 | Including | 272.9 | 274.0 | 1.1 | 13.9 | 15.3 | H1 | | Pit Infill / Underground | MB-22-430 | and Including | 275.4 | 275.9 | 0.5 | 48.6 | 24.3 | H1 | | Pit Infill | MB-22-431 | | 91.0 | 93.9 | 2.9 | 4.4 | 12.9 | H8 | | Pit Infill | MB-22-431 | and Including | 92.1 | 93.3 | 1.2 | 6.0 | 7.2 | H8 | | Pit Infill / Underground | MB-22-433 | | 274.7 | 282.6 | 7.9 | 12.8 | 101.5 | H1 | | Pit Infill / Underground | MB-22-433 | Including | 276.5 | 279.3 | 2.8 | 29.1 | 81.6 | H1 | | Pit Infill / Underground | MB-22-435 | | 290.2 | 297.2 | 7.0 | 1.0 | 6.8 | H1 | | Pit Infill / Underground | MB-22-435 | Including | 292.8 | 295.4 | 2.6 | 2.1 | 5.5 | H1 | | Pit Infill | MB-22-438 | | 180.3 | 182.7 | 2.4 | 5.8 | 14.0 | H8 | | Pit Infill | MB-22-438 | Including | 181.2 | 181.7 | 0.5 | 15.8 | 7.9 | H8 | | Pit Infill / Underground | MB-22-444 | | 281.5 | 289.4 | 7.9 | 2.1 | 16.4 | H1 | | Pit Infill / Underground | MB-22-444 | Including | 284.5 | 286.4 | 1.9 | 6.6 | 12.5 | H1 | | Pit Infill / Underground | MB-22-447 | | 212.7 | 214.4 | 1.7 | 3.8 | 6.4 | 1000 | | Pit Infill / Underground | MB-22-447 | Including | 212.7 | 213.9 | 1.2 | 5.2 | 6.2 | 1000 | | Pit Infill / Underground | MB-22-447 | | 274.3 | 277.9 | 3.6 | 4.7 | 16.9 | New H | | Pit Infill / Underground | MB-22-447 | Including | 276.9 | 277.9 | 1.0 | 15.5 | 15.5 | New H | | Pit Infill / Underground | MB-22-449 | | 270.7 | 278.5 | 7.8 | 2.1 | 16.3 | H1 | | Pit Infill / Underground | MB-22-449 | Including | 274.8 | 276.3 | 1.5 | 8.8 | 13.1 | H1 | | Pit Infill / Underground | MB-22-453 | | 221.6 | 227.3 | 5.7 | 2.8 | 16.1 | New H | | Pit Infill / Underground | MB-22-453 | Including | 221.6 | 223.1 | 1.5 | 7.0 | 10.5 | New H | | Pit Infill / Underground | MB-22-455 | | 387.9 | 389.4 | 1.5 | 3.6 | 5.4 | 1000 | | Pit Infill | MB-22-458 | | 116.6 | 118.8 | 2.2 | 3.3 | 7.4 | H8 | | Pit Infill | MB-22-466 | | 29.0 | 31.0 | 2.0 | 3.1 | 6.2 | D5 | | Pit Infill | MB-22-466 | | 127.8 | 129.0 | 1.2 | 21.2 | 25.4 | 1001 | | Pit Infill | MB-22-466 | Including | 127.8 | 128.3 | 0.5 | 40.9 | 20.5 | 1001 | | Pit Infill | MB-22-469 | | 147.0 | 148.0 | 1.0 | 7.7 | 7.7 | 1004 | | Pit Infill / Underground | MB-22-472 | | 280.5 | 294.7 | 14.2 | 1.7 | 23.8 | H1 | | Pit Infill / Underground | MB-22-472 | Including | 287.0 | 288.0 | 1.0 | 18.4 | 18.4 | H1 | | Pit Infill | MB-22-475 | | 90.1 | 92.7 | 2.6 | 2.1 | 5.6 | H23 | | Pit Infill | MB-22-475 | Including | 92.2 | 92.7 | 0.5 | 10.2 | 5.1 | H23 | | Pit Infill | MB-22-476 | | 84.3 | 85.2 | 0.9 | 18.5 | 16.7 | New Vertical | | Pit Infill | MB-22-480 | | 197.7 | 199.7 | 2.0 | 33.8 | 67.6 | D2B | | Pit Infill | MB-22-480 | Including | 198.2 | 198.7 | 0.5 | 127.5 | 63.8 | D2B | | Pit Infill / Underground | MB-22-485 | | 231.5 | 236.8 | 5.3 | 1.6 | 8.5 | New H | | Pit Infill / Underground | MB-22-485 | Including | 232.5 | 233.1 | 0.6 | 10.5 | 6.3 | New H | | Pit Infill / Underground | MB-22-485 | | 272.5 | 274.2 | 1.7 | 13.6 | 23.1 | H1 | | Pit Infill / Underground | MB-22-485 | Including | 273.2 | 273.7 | 0.5 | 42.2 | 21.1 | H1 | | Pit Infill | MB-22-492 | | 145.9 | 151.2 | 5.3 | 1.1 | 5.8 | H8 | | Pit Infill / Underground | MB-22-494 | | 230.8 | 231.8 | 1.0 | 44.9 | 44.9 | H1 | | Pit Infill / Underground | MB-22-494 | Including | 230.8 | 231.3 | 0.5 | 89.6 | 44.8 | H1 | | Pit Infill | MB-22-495 | | 152.0 | 157.0 | 5.0 | 1.0 | 5.2 | D2 | | Pit Infill | MB-22-495 | | 163.0 | 166.4 | 3.4 | 4.1 | 14.0 | D2 | | Pit Infill | MB-22-495 | Including | 164.0 | 165.7 | 1.7 | 8.1 | 13.8 | D2 | | Pit Infill / Underground | MB-22-495 | | 225.4 | 228.3 | 2.9 | 2.0 | 5.7 | New H | | Pit Infill | MB-22-497 | | 60.7 | 61.3 | 0.6 | 42.6 | 25.6 | 1003 | | Pit Infill | MB-22-498 | | 36.8 | 37.8 | 1.0 | 5.5 | 5.5 | D2 | | Pit Infill | MB-22-498 | | 45.8 | 47.6 | 1.8 | 4.1 | 7.5 | D2 | | Pit Infill | MB-22-500 | | 106.2 | 106.7 | 0.5 | 13.8 | 6.9 | D2 | | Barry Pit Sud-Ouest Ext | MB-22-509A | | 17.9 | 23.6 | 5.7 | 10.7 | 60.8 | H6 | | Barry Pit Sud-Ouest Ext | MB-22-509A | Including | 19.2 | 19.7 | 0.5 | 96.5 | 48.3 | H6 | | Barry Pit Sud-Ouest Ext | MB-22-509A | and Including | 22.0 | 22.5 | 0.5 | 8.7 | 4.4 | H6 | | Pit Infill | MB-22-513 | | 31.6 | 36.0 | 4.4 | 2.1 | 9.3 | H6 | | Pit Infill | MB-22-513 | Including | 32.8 | 33.3 | 0.5 | 13.6 | 6.8 | H6 | | Barry Pit Sud-Ouest Ext | MB-22-514 | | 39.1 | 48.5 | 9.4 | 1.1 | 10.5 | H6 | | Barry Pit Sud-Ouest Ext | MB-22-514 | Including | 40.3 | 41.1 | 0.8 | 8.4 | 6.7 | H6 | | Barry Pit Sud-Ouest Ext | MB-22-515 | | 40.9 | 46.5 | 5.6 | 0.9 | 5.3 | H6 | | Pit Infill | MB-22-516 | | 32.8 | 35.6 | 2.8 | 5.4 | 15.1 | D2 | | Pit Infill | MB-22-516 | Including | 33.9 | 34.5 | 0.6 | 23.7 | 14.2 | D3 | | Pit Infill | MB-22-516 | | 46.3 | 50.0 | 3.7 | 3.2 | 11.8 | D2 | | Pit Infill | MB-22-516 | Including | 46.9 | 47.4 | 0.5 | 18.5 | 9.3 | D3 | | Barry Pit Sud-Ouest Ext | MB-22-517 | | 99.6 | 106.0 | 6.4 | 1.3 | 8.0 | H8 | | Barry Pit Sud-Ouest Ext | MB-22-517 | Including | 100.2 | 101.0 | 0.8 | 7.2 | 5.8 | H8 | | Barry Pit Sud-Ouest Ext | MB-22-518 | | 19.2 | 28.0 | 8.8 | 1.5 | 13.2 | H6 | | Underground Infill | MB-22-524 | | 121.6 | 126.9 | 5.3 | 2.5 | 13.0 | D4 | | Underground Infill | MB-22-524 | Including | 122.2 | 124.1 | 1.9 | 6.1 | 11.5 | D4 | | Underground Infill | MB-22-524 | | 277.5 | 279.7 | 2.2 | 2.7 | 5.9 | D2 | | Underground Infill | MB-22-525 | | 469.6 | 470.4 | 0.8 | 11.7 | 9.4 | H12 | | Underground Infill | MB-22-526A | | 172.2 | 194.4 | 22.2 | 1.3 | 27.9 | D4 | | Underground Infill | MB-22-526A | Including | 180.4 | 183.1 | 2.7 | 5.1 | 13.8 | D4 | | Underground Infill | MB-22-526A | | 322.2 | 324.7 | 2.5 | 2.1 | 5.2 | D4 | | Underground Infill | MB-22-526A | | 507.9 | 515.7 | 7.8 | 2.6 | 20.6 | H12 | | Underground Infill | MB-22-526A | Including | 508.4 | 510.9 | 2.5 | 7.3 | 18.3 | H12 | | Underground Infill | MB-22-527A | | 289.3 | 297.4 | 8.1 | 2.2 | 17.9 | H13 | | Underground Infill | MB-22-527A | Including | 289.3 | 293.9 | 4.6 | 3.5 | 16.2 | H13 | | Underground Infill | MB-22-527A | | 425.9 | 430.4 | 4.5 | 1.3 | 5.7 | H3 | | Underground Infill | MB-22-527A | | 522.6 | 524.7 | 2.1 | 3.8 | 8.0 | H12 | | Underground Infill | MB-22-528A | | 442.5 | 443.5 | 1.0 | 5.6 | 5.6 | H3 | | Underground Infill | MB-22-528A | Including | 443.0 | 443.5 | 0.5 | 10.8 | 5.4 | H3 | | Underground Infill | MB-22-528A | | 530.4 | 535.4 | 5.0 | 2.4 | 12.1 | H12 | | Underground Infill | MB-22-528A | Including | 531.7 | 532.3 | 0.6 | 14.1 | 8.5 | H12 | | Underground Infill | MB-22-529A | | 155.9 | 158.9 | 3.0 | 6.0 | 18.0 | AB16 | | Underground Infill | MB-22-529A | Including | 156.9 | 157.9 | 1.0 | 17.8 | 17.8 | AB16 | | Underground Infill | MB-22-529A | | 196.3 | 198.6 | 2.3 | 4.9 | 11.4 | AB23 | | Underground Infill | MB-22-529A | | 239.4 | 241.5 | 2.1 | 79.9 | 167.8 | New H | | Underground Infill | MB-22-529A | Including | 239.4 | 239.9 | 0.5 | 333.0 | 166.5 | New H | | Underground Infill | MB-22-529A | | 267.8 | 269.9 | 2.1 | 9.5 | 20.0 | 800 | | Underground Infill | MB-22-529A | | 423.0 | 429.0 | 6.0 | 1.8 | 11.0 | H3 | | Underground Infill | MB-22-529A | Including | 424.5 | 426.0 | 1.5 | 5.1 | 7.6 | H3 | | Underground Infill | MB-22-530A | | 339.9 | 346.5 | 6.6 | 3.6 | 23.9 | H1 | | Underground Infill | MB-22-531 | | 246.7 | 250.4 | 3.7 | 3.5 | 12.9 | 800 | | Underground Infill | MB-22-531 | Including | 248.9 | 249.9 | 1.0 | 10.3 | 10.3 | 800 | | Underground Infill | MB-22-531 | | 484.0 | 487.8 | 3.8 | 3.1 | 12.0 | H10 | | Underground Infill | MB-22-531 | Including | 485.5 | 487.1 | 1.6 | 6.8 | 10.9 | H10 | | Underground Infill | MB-22-532 | | 132.9 | 138.6 | 5.7 | 0.9 | 5.4 | H26 | | Underground Infill | MB-22-532 | | 152.0 | 164.0 | 12.0 | 1.6 | 19.5 | D4 | | Underground Infill | MB-22-532 | Including | 155.6 | 156.2 | 0.6 | 10.2 | 6.1 | D4 | | Underground Infill | MB-22-534 | | 185.0 | 198.8 | 13.8 | 2.5 | 34.0 | 800 | | Underground Infill | MB-22-534 | Including | 185.0 | 187.9 | 2.9 | 5.3 | 15.5 | 800 | | Underground Infill | MB-22-534 | | 395.4 | 398.7 | 3.3 | 4.3 | 14.1 | H3 | | Underground Infill | MB-22-534 | Including | 396.1 | 396.9 | 0.8 | 13.8 | 11.0 | H3 | | Underground Infill | MB-22-537 | | 48.8 | 51.6 | 2.8 | 1.9 | 5.4 | New H | | Underground Infill | MB-22-537 | | 111.0 | 112.8 | 1.8 | 2.9 | 5.3 | AB16 | | Underground Infill | MB-22-537 | | 165.0 | 168.5 | 3.5 | 2.5 | 8.7 | AB23 | | Underground Infill | MB-22-537 | | 200.2 | 202.3 | 2.1 | 4.8 | 10.2 | 800 | | Underground Infill | MB-22-537 | Including | 201.8 | 202.3 | 0.5 | 11.4 | 5.7 | 800 | | Underground Infill | MB-22-537 | | 480.2 | 481.2 | 1.0 | 6.0 | 6.0 | H12 | | Underground Infill | MB-22-538 | | 197.5 | 198.5 | 1.0 | 15.5 | 15.5 | H17 | | Underground Infill | MB-22-538 | | 202.5 | 204.1 | 1.6 | 6.8 | 10.9 | H6 | | Underground Infill | MB-22-538 | | 208.9 | 209.5 | 0.6 | 11.5 | 6.9 | H6 | | Underground Infill | MB-22-539A | | 70.0 | 72.3 | 2.3 | 2.5 | 5.7 | AB15 | | Underground Infill | MB-22-539A | | 147.7 | 148.2 | 0.5 | 14.1 | 7.1 | AB05 | | Underground Infill | MB-22-539A | | 278.2 | 281.5 | 3.3 | 12.9 | 42.5 | H1 | | Underground Infill | MB-22-539A | Including | 279.4 | 280.5 | 1.1 | 31.3 | 34.4 | H1 |

Earlier from Bonterra Resources Inc.