Stria Lithium reports promising assays from first at-depth drilling on Quebec Pontax property; depth of known mineralization doubles
TSXV - TSX Venture Exchange
(TheNewswire)
| [](https://strialithium.com/) | | | | | | | | | [](https://www.instagram.com/strialithium/) | |
[]()
OTTAWA, Canada- TheNewswire – Feb. 17, 2023 - Stria Lithium Inc. (TSXV:SRA) (OTC:SRCAF) an emerging resource exploration company developing Canadian lithium reserves to meet legislated demand for electric vehicles and their rechargeable lithium-ion batteries, is pleased to announce promising assay results from the first two drill holes at depth on the Pontax Lithium Project (“Pontax”) in the James Bay region of []()Québec , Canada.
Assays include 10.2 m (true width) at 1.34% Li 2 O , and a doubling of the depth of known mineralization to 230m. These results further confirm previous exploration activities on the site and are only the first results of 14 holes drilled to date, totalling 3,858 metres, as part of an aggressive 15,000-metre definition and exploration drilling program now under way on Stria’s Pontax property in the west-central Eeyou Istchee James Bay (EIJB) Territory. A winter road has been opened from the main highway to the Pontax site, and m utiple drill rigs are now on site with the aim of establishing a maiden resource by mid - 2023. Assays from the remaining 12 holes are currently pending at the laboratories.
The drilling program at Stria’s Pontax property is being financed and conducted by Stria’s project partner, Cygnus Gold Ltd. of Australia, and has been designed to systematically step out from known mineralisation at Pontax Central - an extensive spodumene-bearing pegmatite swarm which outcrops over 700m of strike.
Significant intersection results from the latest drilling include;
-
DDH975-22-027:
-
2.82 m* (4.3m of core length) @ 1.84% Li O at a depth of 158 metres(from 227.6m to 231.9m)
-
6.04 m* (9.21m core length) @ 1.44% Li O at a depth of 172 metres (from 247.1m to 256.3m)
-
Five (5) minor intervals of true width between 1.51m* and 2.02m* @ 0.84% to 1.46% Li O
-
Cumulative true thickness of mineralized dyke of 21.4 metres
-
DDH975-22-028:
-
3.44 m* (5.7m of core length) @ 1.35% Li O at a depth of 144 metres (from 194.3m to 200.0m)
-
8.54 m* (13.3m of core length) @ 1.34% Li O at a depth of 212 metres (from 300.2m to 313.5m)
-
Three (3) minor intervals of true width between 1.08m* and 1.55m* @ 0.67% to 0.82% Li O
-
Cumulative true thickness of mineralized dyke of 17.9 metres
*: True thickness, assuming the dykes are dipping -85 o to the NNW
: Weighted average using a cut-off grade of 0.5% Li 2 O on spudumene dyke only, excluding lithium bearing wallrock (FeO > 5%), a minimum true thickness of 1 metre, no external dilution, and wallrock internal dilution set at 0% Li 2 O.
Drilling was conducted with a single heliportable rig by RJLL Drilling Co. from Rouyn-Noranda and supervised by IOS Services Geoscientifiques Inc. Collar location was measured with a high resolution GPS Geode device, while downhole deviation was measured with the use of a Reflex device. Core, NQ in diameter, has been logged on site and expedited by road carrier to IOS facilities in Saguenay, Quebec, for sampling and storage. Core samples were cut in half with a diamond saw, tagged and bagged to be shipped to SGS Lakefield laboratory by road carrier for preparation. Core samples were crushed (75% <2mm) and pulverized (85% <75 μ m). Assaying has been conducted by SGS Burnaby with the use of ICP-OES and ICP-MS after sodium peroxide fusion (GE_ICM91A50). SGS-Canada is an ISO/IEC 17025 accredited laboratory. Quality control has been monitored by an IOS certified chemist through the insersion of 7 sample blanks, 7 preparation blanks, 5 certified reference material Oreas-147, 4 certified reference material Oreas-148 and 5 certified reference material Orea-149, for a total of 28 insertions (15%).
Dean Hanisch, CEO of Stria Lithium, said today: “We are excitied to be finally getting an aggressivce drilling program at depth under way, and are very encouraged by the promising results of the first two holes of 14 drilled to date. The winter road is open and providing economical access to several additional heavy drill rigs. We look forward to reporting more assay results as they become available.”
The latest drilling has stepped out 50m to 100m below existing mineralisation to a vertical depth of 230m, effectively doubling the depth of known mineralisation which remains open in all directions.
[](https://www.thenewswire.com/data/tnw/clients/img/ae9c9585cfe652f107032ca35de3c301.png) Click Image To View Full Size
Figure 1: Plan view of Pontax Central with the location of all drilling to date. Highlighting recent significant intersections including 8.54m @ 1.34% Li 2 O and 6.04 @ 1.44% Li 2 O
[](https://www.thenewswire.com/data/tnw/clients/img/8d6a3f796f88a36e22769f887d11fe51.png) Click Image To View Full Size
Figure 2: Cross section though Pontax Central looking towards the NE, showing both historic drillholes and the recent deeper drillholes completed by Cygnus with results recived to date, including 4.3m @ 1.8% Li 2 O and 16.5m @ 1.1% Li 2 O . Interval length expressed as true thickness and depth as vertical depth. The recent drilling is the deepest drilling on the project to date stepping out over 100m from exisiting drilling with mineralisation remaining open in all directions.
[]()[]()About Stria Lithium
Stria Lithium (TSX-V: SRA) is an emerging resource exploration company developing Canadian lithium reserves to meet legislated demand for electric vehicles and their rechargeable lithium-ion batteries.
Lithium is a rare metal and an indispensable component of rechargeable lithium-ion batteries, one of the safest and most efficient energy storage technologies available today, used in everything from cellphones and power tools to electric cars and industrial-scale energy storage for renewable power sources such as wind and solar generation.
Stria’s Pontax Lithium Project covers 36 square kilometres, including 8 kilometres of strike along the prospective Chambois Greenstone Belt. The region, known as the Canadian “Lithium Triangle,” is one of only a few known sources of lithium available for hardrock mining in North America.
Stria’s Pontax property is situated close to an industrial powerline and a major paved highway, about 310 km north of the North American rail network leading to industrial heartland.
As momentum builds for the green energy revolution and the shift to electric vehicles, governments in Canada and the U.S. are aggressively supporting the North American lithium industry, presenting the industry and its investors with a rare, if not unprecedented, opportunity for growth and prosperity well into the next decade and beyond.
Cygnus Gold is committed to fully funding and managing the current two-stage exploration and drilling program up to $10 million at Stria’s Pontax property, and will also pay Stria up to $6 million in cash. In return, Cygnus may acquire up to a 70% interest in the property.
Stria is committed to exceeding industry’s environmental, social and governance standards. A critical part of that commitment is forging meaningful, enduring and mutually beneficial relationships with the James Bay Cree Nation (Eeyouch), and engaging openly and respectfully as neighbors and collaborators in an exciting project with the potential to create lasting jobs and prosperity for Eeyou Istchee and its people.
The technical content disclosed in the current press release was reviewed and approved by Réjean Girard, P.Geo and president of IOS Services Geoscientifiques Inc, a qualified person as defined under National Instrument NI-43-101.
For more information about Stria Lithium and the Pontax Lithium project, please visit https://strialithium.com
Follow us on:
-
Twitter @StriaLithium
-
Instagram @strialithium
-
-
For more information on Stria Lithium Inc., please contact:
Dean Hanisch
CEO Stria Lithium
dhanisch@strialithium.com
+1(613) 612-6060
Kimberly Darlington
Communications, Stria Lithium Inc.
kdarlington@strialithium.com
514-771-3398
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the accuracy or adequacy of this release.
Cautionary Note Regarding Forward-Looking Information
Except for statements of historical fact, this news release contains certain “forward-looking information” within the meaning of applicable securities law. Forward-looking information is frequently characterized by words such as “plan”, “expect”, “project”, “intend”, “believe”, “anticipate”, “estimate” and other similar words, or statements that certain events or conditions “may” or “will” occur. Although we believe that the expectations reflected in the forward-looking information are reasonable, there can be no assurance that such expectations will prove to be correct. We cannot guarantee future results, performance or achievements. Consequently, there is no representation that the actual results achieved will be the same, in whole or in part, as those set out in the forward-looking information.
Forward-looking information is based on the opinions and estimates of management at the date the statements are made and are subject to a variety of risks and uncertainties and other factors that could cause actual events or results to differ materially from those anticipated in the forward-looking information. Please refer to the risk factors disclosed under our profile on SEDAR at www.sedar.com. Readers are cautioned that this list of risk factors should not be construed as exhaustive.
The forward-looking information contained in this news release is expressly qualified by this cautionary statement. We undertake no duty to update any of the forward-looking information to conform such information to actual results or to changes in our expectations except as otherwise required by applicable securities legislation. Readers are cautioned not to place undue reliance on forward-looking information.
The technical aspects of the current press release have been reviewed by Réjean Girard, géo. (QC), President of IOS Services Géoscientifiques Inc., a consultant to the Company and a Qualified Person as defined under National Instrument (NI) 43 – 101 Standards of Disclosure for Mineral Projects has reviewed and approved the technical content of this news release.
APPENDIX A – Drillholes with Results
Coordinates given in UTM NAD83 (Zone 18)
| Hole ID | Easting | Northing | RL | Azimuth | Dip | Depth | | 975-22-027 | 362939 | 5754676 | 250 | 325 | -50 | 309 | | 975-22-028 | 363023 | 5754731 | 248 | 325 | -50 | 333 |
APPENDIX B – Significant Intercepts
Significant intersections use a cut-off grade of 0.5% Li 2 O in pegmatite, no external dilution and internal dilution from wallrock accounted as 0%. Intercept lengths may not add up due to rounding to the appropriate reporting precision.
| Hole ID | From (m) | To (m) | Length (m) | Depth (m) | True width (m) | Li2O % | | 975-22-027 | 143.00 | 143.75 | 1.50 | 101.12 | 0.96 | 0.87 | | 155.96 | 1 56.75 | 1.47 | 110.28 | 0.94 | 1.16 | | | 180.54 | 181.35 | 2.30 | 125.41 | 1.51 | 1.79 | | | 197.64 | 198.50 | 2.59 | 137.29 | 1.70 | 0.60 | | | 204.42 | 205.12 | 1.38 | 142.00 | 0.91 | 1.01 | | | 227.59 | 228.59 | 4.30 | 158.10 | 2.82 | 1.08 | | | 239.84 | 240.84 | 3.00 | 166.61 | 1.97 | 2.38 | | | 247.11 | 248.11 | 9.21 | 171.66 | 6.04 | 0.94 | | | 268.19 | 268.91 | 3.00 | 182.91 | 2.02 | 0.79 | | | 279.70 | 280.32 | 1.24 | 190.75 | 0.83 | 0.68 | | | 976-22-028 | 173.82 | 174.55 | 1.48 | 129.17 | 0.89 | 2.07 | | 180.60 | 181.44 | 2.58 | 134.21 | 1.55 | 0.93 | | | 188.70 | 189.50 | 1.60 | 140.23 | 0.96 | 1.54 | | | 194.32 | 195.00 | 5.72 | 144.41 | 3.44 | 0.96 | | | 242.10 | 243.00 | 1.80 | 179.92 | 1.08 | 1.04 | | | 267.45 | 268.20 | 2.25 | 195.60 | 1.39 | 1.08 | | | 300.15 | 301.00 | 13.30 | 212.24 | 8.55 | 2.51 | |
APPENDIX C
Pontax Project Drilling - 2012 JORC Table 1
Section 1 Sampling Techniques and Data
| Criteria | JORC Code explanation | Commentary | | Sampling techniques | Nature and quality of sampling (eg cut channels, random chips, or specific specialised industry standard measurement tools appropriate to the minerals under investigation, such as down hole gamma sondes, or handheld XRF instruments, etc). These examples should not be taken as limiting the broad meaning of sampling. | -
Diamond holes were completed by NQ-diameter diamond core drilling. | | Include reference to measures taken to ensure sample representivity and the appropriate calibration of any measurement tools or systems used. | -
QAQC samples were inserted in the sample runs, comprising lithium standards (CRM’s or Certified Reference Materials) and sourced blank material | | | Aspects of the determination of mineralisation that are Material to the Public Report.
In cases where ‘industry standard’ work has been done this would be relatively simple (eg ‘reverse circulation drilling was used to obtain 1 m samples from which 3 kg was pulverised to produce a 30 g charge for fire assay’). In other cases more explanation may be required, such as where there is coarse gold that has inherent sampling problems. Unusual commodities or mineralisation types (eg submarine nodules) may warrant disclosure of detailed information. | -
Sampling was nominally at 1 m intervals however over narrow zones of mineralisation it was as short as 0.3m.
-
Sampling practice is appropriate to the geology and mineralisation of the deposit and complies with industry best practice. | | | Drilling techniques | Drill type (eg core, reverse circulation, open-hole hammer, rotary air blast, auger, Bangka, sonic, etc) and details (eg core diameter, triple or standard tube, depth of diamond tails, face-sampling bit or other type, whether core is oriented and if so, by what method, etc). | -
Diamond core was drilled using surface diamond rigs with industry recognised contractors RJLL Drilling
-
Drilling was conducted using NQ core size
-
Directional surveys have been taken at 50m intervals | | Drill sample recovery | Method of recording and assessing core and chip sample recoveries and results assessed.
Measures taken to maximise sample recovery and ensure representative nature of the samples.
Whether a relationship exists between sample recovery and grade and whether sample bias may have occurred due to preferential loss/gain of fine/coarse material. | -
Diamond core recovery was measured for each run and calculated as a percentage of the drilled interval. Overall, the core recoveries are excellent with fresh rock from near surface | | Logging | Whether core and chip samples have been geologically and geotechnically logged to a level of detail to support appropriate Mineral Resource estimation, mining studies and metallurgical studies. | -
All core was geologically and geotechnically logged. Lithology, veining, alteration and mineralisation are recorded in multiple tables of the drillhole database. | | Whether logging is qualitative or quantitative in nature. Core (or costean, channel, etc) photography. | -
Geological logging of core is qualitative and descriptive in nature. | | | The total length and percentage of the relevant intersections logged. | -
642 metres (100%) has been logged | | | Sub-sampling techniques and sample preparation | If core, whether cut or sawn and whether quarter, half or all core taken.
If non-core, whether riffled, tube sampled, rotary split, etc and whether sampled wet or dry.
For all sample types, the nature, quality and appropriateness of the sample preparation technique.
Quality control procedures adopted for all sub-sampling stages to maximise representivity of samples.
Measures taken to ensure that the sampling is representative of the in-situ material collected, including for instance results for field duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain size of the material being sampled. | -
Core was cut in half, one half retained as a reference and the other sent for assay
-
Samples were submitted to SGS preparation lab in Lakefield, Ontario.
-
At Lakefield the samples are dried at 105°C, crushed to 75% passing 2 mm, riffle split 250 g, and pulverize 85% passing 75 microns.
-
Laboratory QC procedures involve the use of internal certified reference material as assay standards, along with blanks, duplicates and replicates.
-
The pulps were shipped by air to SGS Canada’s laboratory in Burnaby, BC. | | Quality of assay data and laboratory tests | The nature, quality and appropriateness of the assaying and laboratory procedures used and whether the technique is considered partial or total. | -
The samples were analysed at SGS Canada laboratory in Burnaby, BC.
-
Industry standard assay quality control techniques were used for lithium related elements.
-
The samples were homogenized and subsequently analysed for multi-element (including Li and Ta) using sodium peroxide fusion with ICP-AES/MS finish (codes GE_ICP91A50 and GE_IMS91A50). | | For geophysical tools, spectrometers, handheld XRF instruments, etc, the parameters used in determining the analysis including instrument make and model, reading times, calibrations factors applied and their derivation, etc. | -
None used | | | Nature of quality control procedures adopted (eg standards, blanks, duplicates, external laboratory checks) and whether acceptable levels of accuracy (i.e. lack of bias) and precision have been established. | -
Laboratory QC procedures involve the use of internal certified reference material as assay standards, along with blanks, duplicates and replicates.
-
The company also submitted certified reference material and blanks with one in every 10 samples.
-
Results for both met QAQC tolerances | | | Verification of sampling and assaying | The verification of significant intersections by either independent or alternative company personnel. | -
Verification was made by Cygnus Metals other professional consultant geologists. | | The use of twinned holes. | -
No drillholes were twinned | | | Documentation of primary data, data entry procedures, data verification, data storage (physical and electronic) protocols. | -
All data was received in electronic format has been reviewed, documented by IOS Services Geoscientifiques Inc, a professional exploration services company based out of Saguenay, Québec. The data has then been validated by Cygnus Metals and stored by the company | | | Discuss any adjustment to assay data. | -
There were no adjustments to the assay data | | | Location of data points | Accuracy and quality of surveys used to locate drill holes (collar and down-hole surveys), trenches, mine workings and other locations used in Mineral Resource estimation. | -
The location of the drillholes and the aiming points for the orientation of the drillholes were indicated on the ground using identified stakes. The stakes marking the location of the drillholes were set up and located with a Garmin GPS model “GPSmap 62s” (4m accuracy) | | Specification of the grid system used. | -
The grid system used is UTM NAD83 (Zone 18) | | | Quality and adequacy of topographic control. | -
Located with a Garmin hand held GPS model “GPSmap 62s” | | | Data spacing and distribution | Data spacing for reporting of Exploration Results. | -
Reported drill holes are on 100m spaced sections and approximately 50m centres
-
The spacing is considered appropriate for this type of exploration | | Whether the data spacing and distribution is sufficient to establish the degree of geological and grade continuity appropriate for the Mineral Resource and Ore Reserve estimation procedure(s) and classifications applied. | -
No resource estimation is made. | | | Whether sample compositing has been applied. | -
No sample compositing has been applied | | | Orientation of data in relation to geological structure | Whether the orientation of sampling achieves unbiased sampling of possible structures and the extent to which this is known, considering the deposit type. | -
Drill lines are orientated approximately at right angles to the currently interpreted strike of the known outcropping mineralisation. | | If the relationship between the drilling orientation and the orientation of key mineralised structures is considered to have introduced a sampling bias, this should be assessed and reported if material. | -
Earlier from
- Stria reports positive outcrop mapping and sampling results from Pontax North and Pontax Central targets at its Pontax Lithium Project, Quebec
- Helicopter Borne Drilling Resumes at Stria's Pontax project as Winter Road Construction Blazes Forward Making Way for the 12000-metre Winter Drill Program
- Stria Completes Initial 2,000-Metre Drilling Program at its Pontax-Lithium Project, Quebec