Aris Mining Reports Q2 2026 Results

TSX - Toronto Stock Exchange · Gold · Silver · Lead · Zinc · Copper · Canada · Corporate Finance

Strong H1 2026 performance funds near-term growth

Aris Mining Corporation (Aris Mining or the Company) (TSX: ARIS; NYSE: ARIS) announces its financial and operating results for the three and six months ended June 30, 2026 (Q2 2026 & H1 2026). All amounts are in U.S. dollars unless otherwise indicated.

This press release features multimedia. View the full release here: https://www.businesswire.com/news/home/20260729659384/en/

Figure 1: Combined AISC and Realized Gold Price Trends ($/oz) – Segovia

Q2 2026 Financial Performance

Production of 73.7 thousand ounces (koz) of gold, consistent with Q1 2026. Gold revenue of $321 million , with an average realized gold price of $4,450. Adjusted EBITDA 1 of $179 million, on a trailing 12-month basis, Adjusted EBITDA of $690 million. Adjusted net earnings of $96 million or $0.47/share , on a trailing 12-month basis, Adjusted net earnings of $386 million or $1.89/share. Cash balance of $426 million as of June 30, 2026, after funding $121 million in capital projects in Q2 2026, including $78 million at Marmato and $31 million at Segovia.

Neil Woodyer, Chair and CEO, commented “Aris Mining delivered another strong quarter with our operations generating the cash required to fund more than $120 million of capital investments during the second quarter while maintaining a strong balance sheet.

At Marmato, underground access connecting the Bulk Mining Zone to the new plant area is complete, the SAG and ball mills are on site, and mechanical installation is underway. Construction of the 5,000 tpd CIP plant continues to advance toward first gold and is on schedule for Q4 2026. At Segovia, increased investment in underground development and haulage infrastructure is building the mining capacity required to support higher production from the expanded processing facilities.

We remain on track to achieve our 2026 production guidance. With Segovia and Marmato providing a clear path toward approximately 500,000 2 ounces of annual production, and Soto Norte and Toroparu continuing to advance, Aris Mining is well positioned to deliver its longer-term growth strategy.

At Soto Norte, the environmental studies and preparation of the environmental license application are nearing completion. At Toroparu, the prefeasibility study remains on schedule for completion in the second half of 2026.”

| | Q2 2026 | Q1 2026 | H1 2026 | H1 2025 | | Gold production (koz), total | 73.7 | 74.3 | 148.0 | 113.4 | | Gold sold (koz), total | 72.1 | 74.8 | 147.0 | 115.3 | | Segovia – AISC, Owner Mining ($/oz sold) | $1,767 | $1,492 | $1,623 | $1,503 | | Segovia – CMP 3 AISC Sales Margin | 46% | 40% | 43% | 41% | | EBITDA (US$M) | $163 | $182 | $344 | $71 | | Adjusted EBITDA (US$M) | $179 | $212 | $391 | $165 | | Adjusted EBITDA, last 12 months (US$M) | $690 | $610 | $690 | $264 | | Net earnings (loss) 4 (US$M) | $94 or $0.46/sh | $98 or $0.47/sh | $192 or $0.93/sh | ($15) or ($0.08)/sh | | Adjusted earnings 4 (US$M) | $96 or $0.47/sh | $124 or $0.60/sh | $220 or $1.07/sh | $75 or $0.43/sh | | Adjusted earnings 4 , last 12 months (US$M) | $386 or $1.89/sh | $337 or $1.71/sh | $386 or $1.89/sh | $113 or $0.64/sh |

Q2 & H1 2026 Operational Performance

Segovia produced 64.4 koz, bringing H1 2026 production to 131.0 koz . Q2 2026 production reflected higher throughput, with 202.5 thousand tonnes (kt) processed at an average gold grade of 10.23 g/t, compared with 175.4 kt at 12.41 g/t in Q1 2026. Segovia’s Q2 results reflect continued investment in underground development to support the ramp-up toward consistent utilization of the expanded 3,000 tonnes per day (tpd) processing capacity installed in June 2025. Tonnes processed increased by 15% quarter-over-quarter to 202.5 kt, while total Segovia investment, including sustaining and non-sustaining capital, increased to $31 million in Q2 2026 from $17 million in Q1 2026. This investment of $48 million in H1 2026 is advancing the development work required to increase mining rates and improve haulage efficiency, including new ramps and a main underground haulage circuit connecting the El Silencio, Providencia and Sandra K mines. This work is being supported with the order of an expanded mining fleet through a combination of purchase and leasing arrangements to renew aging equipment and advance the expansion plan. Once complete, these initiatives are expected to support increased mill feed, more efficient transport of workers, mill feed and waste, shorter cycle times, and reduced traffic through town. Segovia generated an AISC margin of $157 million in Q2 2026, supported by higher tonnes processed and continued strong gold prices, bringing H1 2026 AISC margin to $356 million. Owner-operated mining contributed 67% of mill feed, while Contract Mining Partner (CMP) sourced material contributed 33%, consistent with Q1 2026. Owner-operated mining AISC was $1,767/oz for Q2 2026, bringing H1 2026 owner-operated mining AISC to $1,623/oz, below the full-year 2026 guidance range of $1,700 to $1,800/oz. The increase from Q1 2026 partly reflected higher sustaining capital as the Company increased investment in underground development to support higher mining capacity. CMP-sourced gold delivered an AISC sales margin of 46% in Q2 2026, bringing H1 2026 CMP AISC sales margin to 43%, above the top-end of the full-year 2026 guidance range of 35% to 40%. Combined AISC is $1,974/oz for H1 2026.

Marmato produced 9.3 koz, bringing H1 2026 production to 17.1 koz. Q2 2026 production reflected the processing of 84.6 kt at an average gold grade of 3.79 g/t, compared to 77.0 kt at 3.53 g/t in Q1 2026. This increased production reflects the operating capacity of the existing flotation plant together with mill feed sourced primarily from ore development and stopes in the Bulk Mining Zone and CMPs operating in the Narrow Vein Zone. Throughput is expected to increase materially following commissioning of the new 5,000 tpd carbon-in-pulp (CIP) plant, with first gold expected in Q4 2026. Aris Mining plans to exit 2026 operating the new CIP plant at approximately 3,000 tpd, before ramping up through 2027 to approximately 4,000 tpd by mid-2027 and the full 5,000 tpd design capacity by the end of 2027, following commissioning of the paste backfill plant.

2026 Outlook Aris Mining remains on track to achieve its 2026 production guidance of 300,000 to 350,000 ounces of gold. H1 2026 production of 148 koz represents approximately 49% of the low end and 46% of the midpoint of the full-year guidance range, with production expected to be weighted to the second half of the year. Segovia is expected to continue increasing mining capacity and production through the second half of the year. Marmato's new 5,000 tpd design-capacity CIP plant remains on schedule for first gold in Q4 2026, supporting the Company's 2026 production guidance for Marmato of 35,000 to 50,000 ounces. The lower end of the Marmato guidance range is expected to be achievable through the existing flotation plant, while the upper end assumes successful commissioning of the new CIP plant in Q4 2026.

Project Development Highlights

Marmato expansion advancing toward commissioning and first gold Construction of the new 5,000 tpd design-capacity CIP plant remains on schedule for first gold in Q4 2026. The SAG and ball mills are on site and mechanical installation is underway. The Bulk Mining Zone is prepared to support the initial ramp-up of the new CIP plant. The underground connection completed earlier this year established direct access between the Bulk Mining Zone and the new process plant area, improving access, ventilation and haulage, and supporting the planned production ramp-up. As at July 1, 2026, the estimated capital required to achieve first gold from the Marmato CIP plant in Q4 2026 is approximately $118 million. After the final $42 million installment expected from Wheaton Precious Metals in Q3 2026, the net funding requirement of approximately $76 million will be funded from the Company’s cash balance and operating cash flow.

Toroparu Project progressing toward a potential early 2027 construction decision The Prefeasibility Study (PFS) remains on schedule for completion in H2 2026, supporting a construction decision targeted for early 2027. Project optimization work in support of the PFS includes updated mine scheduling, engineering studies and other activities to advance to construction readiness. Pre-construction activities underway, including construction of the Puruni River bridge, camp expansion, road improvements and other site infrastructure. The project team has grown to 100 employees in Guyana, with several key leadership appointments made during the quarter to support project development and execution. Aris Mining continues active engagement with the Government of Guyana and the Guyana Geology and Mines Commission (GGMC) to obtain the mining license and keep stakeholders informed of project progress. Preliminary Economic Assessment (PEA) completed in October 2025, outlining an attractive project with average annual gold production of 235 koz and an after-tax NPV 5% of $1.8 billion, IRR of 25%, and 3.0-year payback at an assumed gold price of $3,000/oz. 5

Soto Norte Project nearing completion of environmental studies and environmental license application preparation The project incorporates industry-leading environmental and social design features, including a metallurgical process free of cyanide and mercury, together with a CMP program that allocates approximately 750 tpd of processing capacity to local miners, over 20% of Soto Norte’s 3,500 tpd processing capacity. The environmental studies and preparation of the environmental license application are nearing completion. PFS completed in September 2025, demonstrating robust economics with average annual gold production (years 2 to 10) of 263 koz and an after-tax NPV 5% of $2.7 billion, IRR of 35%, and 2.3-year payback at an assumed gold price of $2,600/oz. 6 Strong leverage to higher gold prices, at $3,000/oz the NPV 5% increases to $3.3 billion with an IRR of 40%.

Q2 2026 Conference Call Details

Management will host a conference call on Wednesday, July 29, 2026, at 2:30 pm PT / 5:30 pm ET / 9:30 pm GMT to discuss the results.

Participants may gain expedited access to the conference call by registering at Diamond Pass Registration . Once registered, call-in details will be displayed on screen which can be used to bypass the operator and avoid the call queue. Registration will remain open until the end of the live conference call.

Webcast

Link: Webcast | Q2 2026 Conference Call

Conference Call

Toll-free North America: +1-833-821-0197 International: +1-647-846-2328

Audio Recording

After the call, an audio recording will be available via telephone until end of day on August 5, 2026 Toll-free in the US and Canada: +1-855-669-9658 International: +1-412-317-0088; and using the access code: 2624894

Aris Mining's Condensed Consolidated Interim Financial Statements for the three and six months ended June 30, 2026 and related MD&A are available on SEDAR+, in the Company’s filings with the U.S. Securities and Exchange Commission (the SEC) and in the Financials section of Aris Mining's website here . Hard copies of the financial statements are available free of charge upon written request to info@aris-mining.com .

About Aris Mining

Aris Mining is a Canadian gold mining company focused on South America. The Company operates the Segovia and Marmato underground gold mines in Colombia, which together produced approximately 257,000 ounces of gold in 2025. Aris Mining is listed on the Toronto Stock Exchange and the New York Stock Exchange under the symbol ARIS.

The Company is advancing expansion projects at Segovia and Marmato that are expected to increase annual gold production to approximately 500,000 ounces 2 , driven by the ramp-up at Segovia following the installation of the second mill which was completed in June 2025, and construction of the new Marmato bulk mine and CIP plant, with first gold expected in Q4 2026.

Aris Mining’s portfolio supports a longer-term objective of approximately 1 million ounces of annual gold production 7 . Key projects include the high-grade Soto Norte gold project in Colombia and the Toroparu gold project in Guyana, where a Prefeasibility Study is in progress and a construction decision is expected in early 2027.

Additional information on Aris Mining can be found at www.aris-mining.com , www.sedarplus.ca , and on www.sec.gov .

Endnotes

1. All references to adjusted earnings, EBITDA, adjusted EBITDA, growth capital investment, cash flow after sustaining capital and income taxes, cash costs ($ per oz) and AISC ($ per oz) are non-GAAP financial measures in this document. These measures are intended to provide additional information to investors. They do not have any standardized meanings under IFRS, and therefore may not be comparable to other issuers and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS. Refer to the Non-GAAP Measures section in this document for a reconciliation of these measures to the most directly comparable financial measure disclosed in the Company’s financial statements.

2. Reflects expected steady-state annual gold production run-rates of approximately 300 koz at Segovia and 200 koz at Marmato following completion and ramp-up of the respective expansion projects. For more information, please refer to the Company’s news releases dated June 30, 2025 regarding the Segovia expansion and March 12, 2025 regarding the Marmato expansion

3. Aris Mining operates its own mines and contracts with community-based mining partners, referred to as Contract Mining Partners or CMPs, to increase total gold production. Some partners work within Aris Mining’s infrastructure, while others manage their own mining operations on Aris Mining’s titles using their own infrastructure. In addition, Aris Mining purchases high grade mill feed from third-party contractors operating off-title, which further optimizes production and increases operating margins.

4. Net earnings represents net earnings attributable to owners of the company, as presented in the annual and interim financial statements for the relevant period.

5. See technical report dated October 28, 2025 and entitled “NI 43-101 Technical Report Preliminary Economic Assessment for the Toroparu Project Cuyuni-Mazaruni Region, Guyana”. Note that this PEA is preliminary in nature. It includes inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves, and there is no certainty that the preliminary economic assessment will be realized. Mineral resources that are not mineral reserves do not have demonstrated economic viability.

6. See technical report dated September 3, 2025 and entitled “NI 43-101 Technical Report Prefeasibility Study for the Soto Norte Project, Santander, Colombia.”

7. Includes potential production estimates from Toroparu, which is based on a preliminary economic assessment effective October 21, 2025, which contemplates a 7.0 Mtpa operation over a 21.3-year mine life with average annual gold production of approximately 235 koz at a base case gold price of US$3,000/oz. The preliminary economic assessment is preliminary in nature and includes inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves, and there is no certainty that the preliminary economic assessment will be realized. Mineral resources that are not mineral reserves do not have demonstrated economic viability. There can be no assurance that the projected production will be achieved. In the case of Soto Norte and Toroparu, such production also remains subject to obtaining all necessary permits and to formal construction decisions by the Company.

Non-GAAP Measures

Cash costs & all-in sustaining cost per ounce

| | For the three months ended, | | | | | Segovia | Jun 30, 2026 | Mar 31, 2026 | Jun 30, 2025 | March 31, 2025 | | Total gold sold (ounces) | 62,762 | 67,709 | 53,751 | 47,390 | | Cost of sales 1 | 110,226 | 116,108 | 76,719 | 67,091 | | Less: royalties 1 | (10,741) | (11,139) | (5,539) | (4,519) | | Add: by-product revenue 1 | (8,703) | (7,449) | (2,798) | (3,073) | | Total cash costs | 90,782 | 97,520 | 68,382 | 59,499 | | Add: royalties 1 | 10,741 | 11,139 | 5,539 | 4,519 | | Add: social contributions 1 | 8,661 | 12,358 | 5,177 | 4,061 | | Add: sustaining capital expenditures and lease payments | 14,473 | 11,917 | 11,284 | 6,336 | | Total AISC | 124,657 | 132,934 | 90,382 | 74,415 | | AISC per ounce sold | $1,986 | $1,963 | $1,681 | $1,570 | | Marmato | | | | | | Total gold sold (ounces) | 9,362 | 7,134 | 7,273 | 6,891 | | Cost of sales 1 | 26,542 | 23,096 | 17,255 | 15,384 | | Less: royalties 1 | (3,938) | (3,332) | (2,044) | (1,840) | | Add: by-product revenue 1 | (123) | (306) | (427) | (313) | | Total cash costs | 22,481 | 19,458 | 14,784 | 13,231 | | Add: royalties 1 | 3,938 | 3,332 | 2,044 | 1,840 | | Add: social contributions 1 | 392 | 940 | 385 | 273 | | Add: sustaining capital expenditures | 1,791 | 1,481 | 1,426 | 733 | | Total AISC | 28,602 | 25,211 | 18,639 | 16,077 | | Consolidated | | | | | | Total gold sold (ounces) | 72,124 | 74,843 | 61,024 | 54,281 | | Cost of sales 1 | 136,768 | 139,204 | 93,974 | 82,475 | | Less: royalties 1 | (14,679) | (14,471) | (7,583) | (6,359) | | Add: by-product revenue 1 | (8,826) | (7,755) | (3,225) | (3,386) | | Total cash costs | 113,263 | 116,978 | 83,166 | 72,730 | | Add: royalties 1 | 14,679 | 14,471 | 7,583 | 6,359 | | Add: social contributions 1 | 9,053 | 13,298 | 5,562 | 4,334 | | Add: sustaining capital expenditures and lease payments | 16,264 | 13,398 | 12,710 | 7,069 | | Total AISC | 153,259 | 158,145 | 109,021 | 90,492 |

1. As presented in the financial statements and notes thereto for the respective periods

All-in sustaining cost per ounce – business units (Segovia)

| | For the three months ended, | | | | | | | | Segovia - Owner Mining | June 30, 2026 | Mar 31, 2026 | Dec 31, 2025 | Sep 30, 2025 | Jun 30, 2025 | Mar 31, 2025 | | | Total gold sold (ounces) | 41,520 | 45,789 | 40,260 | 40,984 | 32,685 | 26,963 | | | Cost of sales 1 | 61,207 | 54,858 | 52,773 | 48,502 | 39,532 | 34,799 | | | Less: inventory provision | — | — | (895) | — | — | — | | | Less: royalties 1 | (7,415) | (7,805) | (5,689) | (5,000) | (3,605) | (2,783) | | | Add: by-product revenue 1 | (5,771) | (5,037) | (3,610) | (2,566) | (1,714) | (1,748) | | | Total cash costs | 48,021 | 42,015 | 42,578 | 40,936 | 34,213 | 30,268 | | | Add: royalties 1 | 7,415 | 7,805 | 5,689 | 5,000 | 3,605 | 2,783 | | | Add: social contributions 1 | 5,961 | 8,660 | 6,058 | 5,155 | 3,366 | 2,501 | | | Add: sustaining capital and lease payments | 11,949 | 9,835 | 12,601 | 8,430 | 8,511 | 4,397 | | | Total AISC | 73,346 | 68,315 | 66,926 | 59,521 | 49,695 | 39,949 | | | AISC ($/oz sold) | $1,767 | $1,492 | $1,662 | $1,452 | $1,520 | $1,482 | | | | | | | | | | |

| Segovia - CMPs | | | | | | | | Total gold sold (ounces) | 21,242 | 21,920 | 24,196 | 24,596 | 21,066 | 20,427 | | Cost of sales 1 | 49,019 | 61,250 | 50,271 | 44,747 | 37,187 | 32,292 | | Less: inventory provision | — | — | (279) | — | — | — | | Less: royalties 1 | (3,326) | (3,334) | (2,909) | (2,532) | (1,934) | (1,736) | | Add: by-product revenue 1 | (2,932) | (2,412) | (2,218) | (1,550) | (1,084) | (1,325) | | Total cash costs | 42,761 | 55,505 | 44,865 | 40,665 | 34,169 | 29,231 | | Add: royalties 1 | 3,326 | 3,334 | 2,909 | 2,532 | 1,934 | 1,736 | | Add: social contributions 1 | 2,700 | 3,698 | 3,110 | 2,632 | 1,811 | 1,560 | | Add: sustaining capital and lease payments | 2,524 | 2,082 | 4,053 | 2,256 | 2,773 | 1,939 | | Total AISC | 51,311 | 4,619 | 54,937 | 48,085 | 40,687 | 34,466 | | AISC ($/oz sold) | $2,415 | $2,948 | $2,270 | $1,955 | $1,931 | $1,687 | | | | | | | | | | Segovia - Combined | | | | | | | | Total gold produced (ounces) | 64,424 | 66,567 | 63,137 | 65,549 | 51,527 | 47,549 | | Total gold sold (ounces) | 62,762 | 67,709 | 64,456 | 65,580 | 53,751 | 47,390 | | Gold revenue | 281,764 | 331,611 | 273,127 | 229,116 | 177,551 | 135,310 | | Avg realized gold price ($/oz sold) | $4,489 | $4,898 | $4,237 | $3,494 | $3,303 | $2,855 | | Cost of sales 1 | 110,226 | 116,108 | 103,043 | 93,249 | 76,719 | 67,091 | | Less: inventory provision | — | — | (1,174) | — | — | — | | Less: royalties 1 | (10,741) | (11,139) | (8,598) | (7,532) | (5,539) | (4,519) | | Add: by-product revenue 1 | (8,703) | (7,449) | (5,828) | (4,116) | (2,798) | (3,073) | | Combined cash costs | 90,782 | 97,520 | 87,443 | 81,601 | 68,382 | 59,499 | | Add: royalties 1 | 10,741 | 11,139 | 8,598 | 7,532 | 5,539 | 4,519 | | Add: social contributions 1 | 8,661 | 12,358 | 9,168 | 7,787 | 5,177 | 4,061 | | Add: sustaining capital and lease payments | 14,473 | 11,917 | 16,654 | 10,686 | 11,284 | 6,336 | | Combined AISC | 124,657 | 132,934 | 121,863 | 107,606 | 90,382 | 74,415 | | AISC ($/oz sold) | $1,986 | $1,963 | $1,891 | $1,641 | $1,681 | $1,570 | | AISC Margin | 157,108 | 198,677 | 151,264 | 121,510 | 87,169 | 74,415 |