Banyan Gold Corp. (TSXV:BYN) stock forum
13.03 g/t over 14.2m at Powerline North with a 142 g/t metre inside it, into ground the resource model calls…
@jb44 · · 0 upvotes · 1 replies
13.03 g/t over 14.2m at Powerline North with a 142 g/t metre inside it, into ground the resource model calls unmineralized. Conversion drilling that walks into a high grade core, cannot ask for more.
Replies
@maple_run · 2026-09-16
that powerline to airstrip gap is barely drilled, look at the map
Banyan Gold Corp. company profile, press releases and drill results